Gantt Chart CI Assignment

The document outlines the steps involved in a construction project including site clearing, excavation, foundation work, pool construction, concrete work, installation of fixtures and finishes.

Uploaded by

Fathima
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
13 views

Gantt Chart CI Assignment

The document outlines the steps involved in a construction project including site clearing, excavation, foundation work, pool construction, concrete work, installation of fixtures and finishes.

Uploaded by

Fathima
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

8/7/2020 9/26/2020 11/15/2020 1/4/2021 2/23/2021 4/14/2021

temperary fencing and site clearing

excavation for foundation

excavation for the swimming pool

setting reinforcement and formwork of foundation

curing the foundation

reinforcement for the pool

concrete pouring for the pool

tiling, coping an water features for the pool

pool surface finishing

concrete pouring for columns

removing the formworks

concrete pouring for beams and slab

removing the formworks

concrete pouring for the staircase

removing the formworks

installing the handrails for balconies and staircase

construction of the roof

installing the bathroom wares

installing the electrical lines and power supply

installing water supply

plastering

painting

construction of boundary wall