1. The document is a layout drawing for a 330kV substation showing the key components and their symbols. 2. It includes a legend identifying the symbols used to represent different equipment such as circuit breakers, disconnect switches, current transformers, and surge arresters. 3. The drawing shows the planned layout of the components on the substation including two 330kV busbars connected by circuit breakers, disconnect switches, and other equipment.

Uploaded by

jitendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
608 views1 page

Benin 330kV Layout

1. The document is a layout drawing for a 330kV substation showing the key components and their symbols. 2. It includes a legend identifying the symbols used to represent different equipment such as circuit breakers, disconnect switches, current transformers, and surge arresters. 3. The drawing shows the planned layout of the components on the substation including two 330kV busbars connected by circuit breakers, disconnect switches, and other equipment.

Uploaded by

jitendra
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1 2 3 4 5 6 7 8 9

A A
Symbol Description

-CB Circuit breaker

-DS Disconnect switch

B -ES Earthing switch

-CT Current transformer B


Metering voltage
-VT transformer
Egbin 330kV Omotosho 330kV Oshogbo 330kV Onitsha 330kV -CVT Capacitive voltage
OHL OHL OHL OHL transformer
SA
-SA Surge arrester
CVT
C LT
CT -TR Autotransformer
DS

CB
-SR Shunt reactor C
-ET Earthing transformer
DS
DS CT CB CT DS
Busbar 1

-PI Post Insulator


330kV

DS

D DS
Note: This layout drawing is for bidding purposes only.
Busbar 2
330kV

EPC to further develop the layout in detail design stage.


D
Reference drawings
Drawings No.: Title:

Sapele 1 OHL Sapele 2 OHL Sapele 3 OHL Delta OHL Onitsha 1 OHL Onitsha 2 OHL Ajaokuta 1 OHL Ajaokuta 2 OHL

Approved Approved with Comments Not Approved For Information

E 150MVA 150MVA
TR

TR

To Be Replaced To Be Replaced
With 300MVA With 300MVA Date:............................. Signature/Stamp:....................................................
Project Consultant
SR
75MVAR
T2 SR
75MVAR
T1
ET2 ET1
To 132kV To 132kV E
Switchyard Switchyard TRANSMISSION COMPANY OF NIGERIA
Project Management Unit (PMU)

COLENCO CONSULTING NIGERIA LTD


F
Existing Substation
F
New Proposed Scope Project
Drawing No.

Drawing Detail
Name: Date:
Technical Feasibility & Identification of
Scope of Work for Substation Upgrading &
Prepared: Arjun Sabat 01/11/2016
Transmission Line Re-Conducting in Nigeria
G Drawn: Khemissi Hartem 01/11/2016
NETAP
Title:
Checked: Zdravko Dolencic 01/11/2016
Benin 330kV G
Sandeep Bhowmick
Approved: 01/11/2016
Substation Layout

Revisions
H H
No. Name Date
H
Scale: NTS Rev.: