MT Eline Enterprise Technical - Specification
MT Eline Enterprise Technical - Specification
Technical specification
MV ELINE ENTERPRISE
Dry Dock
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
08/11/2020 Page: 1
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Summary
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 2
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Total: 2,663
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 3
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Position: Flat Bottom (From bilge keel to bilge keel) Area (sq.m): 1600
Surface preparation: Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast cleaning to Sa 2 ½ (ISO 8501-1).
Dry dock interval (months) Voyage factor (%) Average sea water temperature (°C) Average vessel speed (knots)
36 70 29 10
Remarks:
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 4
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Position: Side bottom (From bilge keel to scantling draft) Area (sq.m): 650
Surface preparation: Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast cleaning to Sa 2 ½ (ISO 8501-1).
Dry dock interval (months) Voyage factor (%) Average sea water temperature (°C) Average vessel speed (knots)
36 70 29 10
Remarks:
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 5
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Surface preparation: Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast cleaning to Sa 2 ½ (ISO 8501-1).
Remarks:
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 6
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Surface preparation: Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast cleaning to Sa 2 ½ (ISO 8501-1).
Remarks:
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 7
Authorised distributor of:
Technical specification
Customer: PT Laju Perkasa Abadi Contact person: Mr. Dadang Expiry date: 08/02/2021
Project title: MV ELINE ENTERPRISE Location: PT. GAMATARA Cirebon Version: 1
Issued by: PT. MITRA WARNA UTAMA Prepared by: Yuzaldhi Hartlan
Surface preparation: Remove oil, grease, salt and other contaminants with a suitable detergent followed by fresh water cleaning. When the surface is dry: Abrasive blast cleaning to Sa 2 ½ (ISO 8501-1).
Remarks:
Attachments
Images
Image title Image description File name Image
Specification remark
Any technical advice and/or technical specifications involving Jotun products - created and submitted a customer by a Jotun approved dealer- are the sole responsibility of the dealer. Drying times and paint
consumptions will depend on conditions outside the manufacturer's control. For updated product information please check Jotun's web site www.jotun.com
08/11/2020 Page: 8