0% found this document useful (0 votes)
21 views1 page

QTY Comparison

The document compares the quantity of reinforced concrete and reinforcement steel between the tender and drawings for different structures in a sewage treatment plant. The quantities for the aeration and anoxic tank, secondary clarifier, and centrifuge structures are lower in the drawings compared to the tender.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
21 views1 page

QTY Comparison

The document compares the quantity of reinforced concrete and reinforcement steel between the tender and drawings for different structures in a sewage treatment plant. The quantities for the aeration and anoxic tank, secondary clarifier, and centrifuge structures are lower in the drawings compared to the tender.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

President Estate Quantity Comparison

2MLD STP Structure

Tender Quantity Quantity as per Drawing


Structure RCC (cum) Reinforcement (MT) Structure RCC (cum) Reinforcement (MT)
Inlet structures 59.5 5.4 Inlet structures 59 4.5
Aeration, Anoxic tank 711 59.8 Aeration, Anoxic tank 652 58
Secondary clarifier (2 nos) 151 13 Secondary clarifier (2 nos) 99 8.8
Constructed Wetland - - Constructed Wetland 20 1.5
UV disinfection chamber 37 3.5 UV disinfection chamber 22 1.2
Sludge Thickener 34 2.8 Sludge Thickener 28 1.9
Centrifuge , RAS sump, Thickened 204 20.7 Centrifuge , RAS sump, Thickened 199 17.5
Filtrate Sump 14 1.2 Filtrate Sump 13.5 0.95
Clarified water sump - - Clarified water sump 65 5.5
Admin , MCC & BLOWER 304 31.4 Admin , MCC & BLOWER 229 29