The document compares the quantity of reinforced concrete and reinforcement steel between the tender and drawings for different structures in a sewage treatment plant. The quantities for the aeration and anoxic tank, secondary clarifier, and centrifuge structures are lower in the drawings compared to the tender.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
21 views1 page
QTY Comparison
The document compares the quantity of reinforced concrete and reinforcement steel between the tender and drawings for different structures in a sewage treatment plant. The quantities for the aeration and anoxic tank, secondary clarifier, and centrifuge structures are lower in the drawings compared to the tender.