DOCUMENT CLASS: 2
Task Risk Assessment (TRA) General Requirements of Emergency
DOCUMENT DESCRIPTION / TITLE : Repair & Mechanical Maintenance of Equipment and Machinery at
site
EQUIPMENT TAG NUMBERS : All Tanks
TOTAL NUMBER OF SHEETS :
16
(Including this coversheet)
DUQM REFINERY
Company Approval Status
Status :
Signed :
Dept :
Date :
COMMENT STATUS CODE: A-Accepted; B-Accepted With Comments
C-Reviewed with Comments; D-No Comments; E-Rejected
PURCHASER APPROVAL STATUS
Approval
Status Contractor Approval Code Description
Code
1 REJECTED. REVISE & RESUBMIT. WORK MAY NOT PROCEED.
MAJOR COMMMENTS AS NOTED.
2 REVISE & RESUBMIT. WORK MAY PROCEED SUBJECT TO INCORPORATION OF COMMENTS
INDICATED.
ACCEPTABLE. INCORPORATE MINOR COMMENTS (IF ANY). RESUBMIT AS CERTIFIED FINAL.
3
WORK MAY PROCEED.
Reviewing Engineer’s Full Name (IN BLOCK LETTERS), Sign and Date
Purchaser’s review of this document does not relieve Vendor of the responsibility for correctness under the Subcontractor Order.
Permission to proceed does not constitute acceptance of design, detail and calculations, test methods or materials developed or selected
by the Subcontractor and does not relieve the Subcontractor from full compliance with the Subcontractor Order or any other obligations,
nor detract from any of the Purchaser’s rights.
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
1 Preparation
1.1 Preparatory Inattentiveness and Personal Injuries 3 3 9 Ensure all employees had under gone Low Training Passport
work at site miscommunication the HSE induction training
Personnel not familiar with Property Damage Medium Ensure PTW obtained from PSJV
work site and HSE Issuing Authority for all activities.
procedures Provide PPE to all employees assigned
for the activity
Implement and maintain control
measures of PTW
Permit holder shall be available at site
all the times and ensure compliance
with permit conditions.
Ensure all the mandatory PSJV training
for maintenance crew
The maintenance work area shall be
approved by PSJV
Only authorized persons should attend
the maintenance of equipment’s
1.2 General Incompetent and untrained Personal Injuries 3 3 9 Ensure skilled and authorised Low
Inspection and technicians technicians assigned for repairing and Adequate monitoring
Unauthorised operation of Property Damage Medium maintenance activity.
trail of
operation the equipment Ensure approved tools and equipment
equipment Unapproved tools are being used.
Unapproved spare parts Ensure no entry of unauthorised person
Line of Fire in the work perimeter, barricade the
Slip and Trip work area.
Page 2 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 3 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 4 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 5 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 6 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 7 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 8 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 9 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
on the Method
statement.
Page 10 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
6 House Keeping
6.1. House Slip and Trip Fall 4 3 12 Follow the waste management procedure Low
Keeping Contact with waste of PSJV.
Entry of foreign body into Skin irritation Medium
eyes Eye injury
Page 11 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
7.0 COVID-19
Covid Transmission Potential risks vary 4 3 12 Ensure a 2-metre Physical distancing rule Low
All persons are at risk of
19 of virus from from mild cold shall always be followed.
infection that may have symptom to death. Medium
potentially
No unauthorized or unnecessary visitors
/infected
various outcomes including shall visit the site.
people on-
site transmission to others both Prevention and awareness to COVID-19
shall be highlighted in daily TBT or Onsite
at the work environment and training.
outside of it. Ensures all personnel shall always
adhere to mandatory use of face mask.
Page 12 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 13 of 14
PSJV EPC 2 – DUQM REFINERY PROJECT
Task Risk Assessment
PEC-HS-FRM-X-12329 – Rev 0
Potential Risk
(With no controls in place)
Hazard Residu
al Risk
Effects /
Risk
Hazards Consequences Rankin
(1,2,3,4,5)
(1,2,3,4,5)
Risk Rating
Probability
Sequence Legal
Control Measures Recovery
Severity
g
Require
Sl.No of Tasks (Potential to cause harm (The harm which (with
could possibly ments Measures
/Job (Health, Injury, Property
damage, environment etc.) occur). (If Any)
control
s in
Steps PAER place)
Page 14 of 14