Operating Manual: Hydrogen Plant 250 NM /H
Operating Manual: Hydrogen Plant 250 NM /H
Date: 19.03.2013
Rev.: 0
If you have technical questions regarding
the hydrogen plant, need the assistance of
a technician or engineer, or wish to order
replacements parts,
please contact:
1 Safety............................................................................................. 1-1
1.1 Symbols Used ................................................................................ 1-2
1.2 General notes ................................................................................. 1-5
1.3 Instructions ..................................................................................... 1-5
1.4 Hydrogen plant ............................................................................... 1-6
1.4.1 Safety devices ................................................................................ 1-8
1.4.1.1 Mechanical safety devices.............................................................. 1-8
1.4.1.2 Binary automatic safety devices ..................................................... 1-9
1.4.1.3 Electrical analog automatic safety devices ..................................... 1-9
1.4.1.4 Automatic safety functions of the Step Sequence ........................ 1-11
1.4.1.5 Emergency stop functions ............................................................ 1-12
1.5 Handling hydrogen ....................................................................... 1-13
1.6 Hydrogen properties ..................................................................... 1-14
1.7 Handling natural gas .................................................................... 1-15
1.8 Properties of natural gas .............................................................. 1-15
1.9 Filling materials ............................................................................ 1-16
1.10 Instruments, pipes and vessels .................................................... 1-16
1.11 Safety protection while working at the plant ................................. 1-17
1.12 Alarm plan .................................................................................... 1-18
1.13 Explosion-protected area plan ...................................................... 1-18
1.14 Regulations on safety and prevention of accidents ...................... 1-18
5 Start-up.......................................................................................... 5-1
5.1 First start-up ................................................................................... 5-3
5.1.1 Checks ........................................................................................... 5-3
5.1.2 Inerting the plant............................................................................. 5-4
5.1.3 Start-up of the plant systems.......................................................... 5-5
5.1.3.1 Control room and process visualisation system: ............................ 5-5
5.1.3.2 Drainage, venting, shut off valves to atmosphere .......................... 5-5
5.1.3.3 Shut off valves to pressure gauge, shut off valves to transmitter . 5-17
5.1.3.4 Instruments at Orifice measuring ................................................. 5-27
5.1.3.5 Nitrogen ........................................................................................ 5-30
5.1.3.6 Instrument air ............................................................................... 5-31
5.1.3.7 Cooling water, Oil ......................................................................... 5-41
5.1.3.8 Steam for water treatment ............................................................ 5-42
5.1.3.9 Boiler feed water .......................................................................... 5-43
5.1.3.10 Heat recovery steam instruments, Export Steam ......................... 5-46
5.1.3.11 Combustion air ............................................................................. 5-47
5.1.3.12 Burner instruments ....................................................................... 5-52
5.1.3.13 Process steam instruments .......................................................... 5-57
5.1.3.14 Natural gas instruments ............................................................... 5-57
5.1.3.15 Process gas instruments .............................................................. 5-58
5.1.3.16 Instruments to Start-up H2-production ......................................... 5-60
5.2 Starting up the plant in manual mode ........................................... 5-63
5.3 Starting up the plant in automatic mode of operation ................... 5-67
5.4 Operation...................................................................................... 5-68
5.5 Shutdown of the plant in the manual mode of operation .............. 5-68
5.6 Shutdown of the plant in the automatic mode of operation .......... 5-71
5.6.1 Standstill of the plant .................................................................... 5-71
5.7 Start-up in short form.................................................................... 5-72
5.8 Reduction of the reformer catalyst ............................................... 5-72
5.9 Reduction of the CO-catalyst ....................................................... 5-76
5.10 Putting the CO-converter out of operation .................................... 5-79
5.11 Additional information for start-up of the plant............................ 5-Add
H2-Production Plant Habas II Turkey 123100722//00, 722E000_uk, 28.03.2013 6/8
Table of Contents
9 Classification of Ex-Zone
Attachments
Part 2 Drawings / Material list / P&I diagram
Material list
(List of Instruments and Equipment)
P&I-Diagram 1-27-520949-0
Sheet 1/5 Desulphurization
P&I-Diagram 1-27-520949-0
Sheet 2/5 Heat Recovery Unit
P&I-Diagram 1-27-520949-0
Sheet 3/5 HT-CO-Reactor and Gas Cooling
P&I-Diagram 1-27-520949-0
Sheet.4/5 Gas Cooling and BFW Degasifying
P&I-Diagram 1-27-520949-0
Sheet.5/5 PSA Unit
Drawings / General – and Assembly Drwg.s Part 2