Dependency Structure Matrix

This document discusses challenges in reducing cycle time for complex system development projects. It outlines the concept of design iterations, which refer to reworking previously completed activities due to new information or failure to meet objectives. Dependency structure matrices (DSMs) provide a visual representation of process interdependencies and can highlight potential iterations. The document argues that DSM-based methods help address cycle time reduction challenges by managing interdependencies and focusing resources to reduce schedule risk and iterations.

Uploaded by

IT'S SIMPLE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
69 views

Dependency Structure Matrix

This document discusses challenges in reducing cycle time for complex system development projects. It outlines the concept of design iterations, which refer to reworking previously completed activities due to new information or failure to meet objectives. Dependency structure matrices (DSMs) provide a visual representation of process interdependencies and can highlight potential iterations. The document argues that DSM-based methods help address cycle time reduction challenges by managing interdependencies and focusing resources to reduce schedule risk and iterations.

Uploaded by

IT'S SIMPLE
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 17

Abstract

Cyclettimetreductiontistantimportanttaspecttoftintegratedtproducttandtprocesstdevelopmentt(IPPD).tThistpapertoutlines
tsometoftthetchallengestthattimpedeteffortsttotreducetcyclettimetfortcomplextsystemtdevelopmenttprojects.tSeveraltfacetstof
tthesetchallengestcantbetsummarizedtusingtthetgeneraltconcepttoftdesigntiterations.tAftertreviewingtthistconcept,tthetpapert
providestantoverviewtoftatprocesstmodelingtapproachtutilizingtdependencytstructuretmatricest(DSMs—
alsotknowntastdesigntstructuretmatrices).tDSMstallowtatsimple,tvisualtrepresentationtoftprocessestandthighlighttpotential
titerations.tThetpapertconcludestwithtatdiscussiontoftthetwaystDSM-
basedtmethodst helptmanagetsometoftthetcyclettimetreductiontchallenges.

1tIntroduction

Tremendoustpressuretonttoday’stcompaniesttotachievetandtsustaintcompetitivetadvantagethastledttotheightenedteffortstto
treducetproducttdevelopmenttcyclettimetandtcosttwhiletprovidingt superiort products.tIndeed,timprovedtmanagementtoftthet
producttdevelopmenttprocesstcontributesttotsustainabletcompetitivetadvantagetfortcompaniest[1-
3].tManythavetrecognizedtthattthetkeyttotprocesstimprovementtliestintbettertprocesstunderstanding.tTowardstthistobjective,t
atcomplextdesigntprocesstcantbetviewedtastatsettoftsimpliertactivitiestwithtdiscernibletinterrelationships.tChoicestasttotthet
decompositiontandt integrationt oftthesetactivitiesthavetramificationstfortthetcompetitivenesstoftthetprocesst[4].tThet
realizationtthattmanytproducttdevelopmenttprocessestandtactivitiestaretproceduraltandt repeatablet hast givent riset tot
modeling effortstthattseekttotdescribetcurrenttprocessestandtprescribetappropriatetpolicytadjustments.
Thistpaperthighlightstthetcapabilitiestoftdependencytstructuretmatrixt(DSM)1-
basedtmethodsttotmanagetprojectstfortreducedtscheduletrisktandtshortertcyclettime.tFollowingtatpresentationtoftsometcycle
ttimetreductiontchallenges,tItprovidetoverviewstoftthetconcepttoftdesigntiterationstandtoftDSM-
based,tprocesstmodelingttechniques.tIntclosing,tItdiscussthowtDSMtmethodstmeettthetcyclettimetreductiontchallengest
coveredtearlier.tThistpaper’stmaintcontributiontisttotlaytoutt severaltcyclettimetreductiontchallengestandtshowtthetwaystDS
Mtmethodsthelptmeettthem.

2tCyclet Timet Reductiont Challenges

Severaltcharacteristicstoftmosttcomplextsystemtdevelopmenttprojectstmaketcyclettimetreductiontespeciallytchallenging.t
Thesetcharacteristicstandtchallengestinclude:
Inefficienttdistributiontoftpersonneltandtresources—includingtfacilities,ttools,tandtespeciallytinformation—
resultstintpartstoftthet projecttspendingt“down”ttimetwaitingtfortresourcestwhenttheytcouldtbetworking.tWhiletthististinevitabletgiven
tlimitedtresources,tappropriatetplanningtcantinsuretthattattleasttcriticaltpathtactivitiestaretnottdelayedtduettotresourcetconstraints.tLackt
oftandtfailurettotusetappropriatetplanningttechniquestcomplicatestcyclettimetreductiontstrategies.
Unstabletproducttrequirementstcausetindecisivenesstandtfostertredesign.tIftrequirementstremaintuncertaint toot latet int thet project,t extrat
rework

1
becomestinevitabletandtcyclettimetreductiontbecomestmoretdifficult.tMakingtsometdecisionstastlatetastpossiblet(attenettof
tset-
basedtdesign)tistsometimestthetrighttthingttotdo,tbuttcertaintdecisionstneedttotbetmadetearlyttotproperlytsettthetscopetandt
directiontoftatproject.
Thetexistencetoftlongtandtvariedtactivityt“pipelines”tmeanstshortertdurationtactivitiestfinishtandtwaittfortlongertdurationtactivitiestto
tproducetneededtresults.tWhentthesetresultstfinallytbecometavailable,tthetactivitiestthattfinishedtearlytoftenthavettotgotbacktandtchanget
theirtworktbasedtontthetnewtinformation.tMeanwhile,tiftthetactivitiestthattfinishedtearlythadtproceededttotmoretdetailedtdesigntwork
t(perhapstbecausetthetworktculturetdemandsttheyt“looktbusy”)tbeforetthetlatertresultstbecametavailable,tmuchtoftthistworktcouldtendtu
ptsquandered.
Lacktoftactivitytcoordinationtresultstint wastedttime,tdoingtthetwrongtwork,tandtinappropriatetcommunication.tIftactivitiestaretnottwellt
integratedttotthetpointtoftknowingtwhattinformationteachtneeds,twhen,tandtintwhattformat,ttheytwillthavettroubletreducingtthetcycle
ttimetofttheirtoveralltprocess.
Highlytinterdependenttortcoupledtactivitiestincreasetthetchancestoftiterationtortrework.tThisteffecttistdiscussedtintmoretdetailtintthet
sectionstthattfollow.
Overlyt ambitioust initialt schedulest maket further
cyclettimetreductionsteventmoretdifficult.tIftantoriginaltplantturnstoutttotbethightrisktfromtatscheduletstandpoint,treducingt
thattscheduletanytfurthertwilltcauseteventgreatertrisk.tIntothertwords,tonetcannottreducetcyclettimetsimplytbytshorteningt
thetplannedtschedule;tonetmusttinsuretatcommensuratetreductiontintscheduletrisk.
Manytseeminglytfeasibletcyclettimetreductiontsolutionsthavetadversetsideteffectstwhichtreducetanticipatedteffectiveness.tThus,t
successfultcyclettimetreductiontrequirestatsystemstperspective,ttakingtintotaccounttthetfeedbackstthattwillttendttotdiminishtoverallt
processtefficacy.

Somethavetapproachedtthetcyclettimetreductiontproblemtbytsimplyttakingtoncetserialtactivitiestandtexecutingtthemtint
parallel.tHowever,tdoingtsotwithouttpayingtattentionttotthetinterdependenciestthattmaytexisttbetweentsuchtactivitiestcantact
uallytwastetresourcestwithouttprovidingtmuchtcyclettimet advantage.tActivitiestthattdependtontothertactivitiestfor
tinformationtwilltoftenthavettotredotsometportiontofttheirtworktiftthosetinputstchangetortarrivetlate.tHence,tindiscriminately
tplacingtoncetserialtactivitiestintparalleltcant leadt totadditionalt reworkt ortiteration.tAtmoreeffectivetapproachtrequiresta
tsystemstviewtoftthetprocesstandtthetcapabilityttotanalyzetthetcomplextrelationshipstbetweentactivities.tThetDSMtmethodol
ogytmeetstthesetrequirements.
Together,tthetchallengestabovetaccounttfortatlargetportiontoftthetuncertaintytortvariancetthattleadsttotoverrunstintprojectt
schedules.tIncreasingt complexitytandtscopetoftthetsystemtundertdevelopmenttexacerbatestthesethazards.tThesetchallenges
texisttbecausettheytaretdifficultttot plantfortandtmanagetontatreal-
timetbasis.tThetgoaltoftthistpapertisttotshowthowtthetconcepttoftdesigntiterationstandtthetDSMtmodelingtmethodologythelp
taddresstsometoftthesetproblems.

Thet Conceptt oft Designt Iterations

Manytoftthetchallengestnotedtabovetaretcapturedtintthetconcepttoftiterationstintthetdesigntprocess.tHeretItprovidetant
overviewtoftthistconcept.tRealizingtthetroletoftiterationtastatscheduletrisktdrivertandtastatbarrierttotcyclettimetreductiont
motivatestthetneedtforttractabletmethodstthattaccounttfortiterationtandthelptmanagerstfocustresourcestappropriately.
Designtiterationtimpliestreworktortrefinement,treturningttotpreviouslytworkedtactivitiesttotaccounttfortchanges.tThistrework
tcantstemtfromtnewtinformationtand/ortfailurettotmeettdesigntobjectivest[5].tNewtinformationtfortantactivitytcomestfrom:
Upstreamtactivitiestcausingtantactivity’st inputsttotchanget(oftentthetresulttoftantiterationtcausingtatsecondtpasstthroughtsometparttoft
thet process,tortatchangetintexternallytsuppliedtrequirementstand/ortassumptions),
Concurrent,tcoupledtactivities,tcausingtantactivity’stinputsttotchange,toftentastsharedtassumptionstchange,tand
Downstreamtactivitiestcausingtant activity’stinputsttotchange,tasterrorstandtincompatibilitiestaretdiscovered.t [6]
Worktdonetlatert(downstream)tintthetprocess—particularlytverificationtandtvalidationtactivities—
oftentrevealstaspectstoftseeminglytcompletedt(upstream)tactivitiestthattmusttbetreworkedt[7-
10].tReworktcantalsotbetgeneratedtbytchangestintthetinformationtprovidedttotandtreceivedtfromtconcurrent,tinterdependentt
(coupled)tactivities.t Fortexample,tteamtAtneedsttotknowtwhattvaluestteamtBthastsettfortparameterstxtandty;tteamtBtneedst
totknowtwhattvaluestteamtCtistusingtfortparameterstwtandtz;tbuttteamtCtneedsttotknowtthetresulttoftteamtA’stactivitiesttot
determinetwtandtz.tThesetdesigntissuestaretsometimestcalledt“chickentandtegg”tproblems,tandtthetgroupstthattworkt tot
solvetthemtaret calledt coupledtteams.t The
phenomenontoftengineersttradingttechnicaltinformationtandttherebytcreatingtreworktforteachtotherthastbeentobservedtint
severaltcasestbytClarktandtFujimotot[1].tAlso,twhentdownstreamtortcoupledtactivitiestcreatetreworktfortupstreamtactivities,
tthetresultingtchangestmaytcausetsecondtordertreworktfortinterimtactivitiest(thosetbetweentthetupstreamtandtdownstream
tactivitiestdirectlytinvolvedtintthetiteration).tHence,tinputtchangesttotactivitiestcantgeneratetnewtinformationtandtforcet
iterationtintthetprocess.
Iterationtalsotresultstfromtnottmeetingtthetdesiredtdesigntobjectives.tIterationthastbeentdefinedtast“thetrepetitiontoft
activitiesttotimprovetantevolvingtdesign”t[11].tFailurettotconvergettotdesigntspecificationstcantrequiretreworkingtupstreamt
activitiesttiedttotthetarea(s)toftshortfall.t Notetthattsuchtinsufficiencytint thetdesigntistmoretlikelytwhentrequirementstandt
objectivestaretunstabletortotherwisetpronettotmodification.tSuchtinstabilitytresultstfromtchangingtemphasistontknownt
objectivestand/ortthetadditiontoftnewtobjectives.
Severaltstudiesthavetdocumentedtiterationteffectstastkeytdriverstoftoveralltdevelopmenttcyclettimet[2,t3,t12-
t18].tIntparticular,tOsbornetfoundtthatt iterationtaccountedtfortbetweent13%tandt70%tofttotaltdevelopmentttimetfort
semiconductortdevelopmenttactivitiestattIntel.t Hetalsotfoundtiterationttot bet thetchieftcausetoftcyclettimetvariabilitytattthet
firm.
Thetiterationtperspectivethelpstcapturetandtquantifytdriverstoftcost,tschedule,tandtperformancet(designtquality)tvariabilityti
ntdesignt programs.t Tightlytcoupled,thighlytiterativetproducttdevelopmenttprocessestcantexpecttgreatertdifficultytconvergin
gttotantacceptabletdesigntundertatgiventscheduletandtbudget.tTotmovettowardstconsistenttsuccess,tproducttdevelopment
tprojectstshouldtstrivettotinsuretthat,ttotatgreatertextent,ttheirtdesigntiterationstaretstrategicallytplannedtrathertthantthetresult
toftseeminglytrandomtchance.
Intlighttoftthistobjective,tittistusefulttotdividetiterationtintthetproducttdevelopmenttprocesstintottwotcategories:
Intentionaltiterations,tpurposelyt performedtintatcoupledtdesigntprocessttotconvergettotatdesirabletsolutiont(i.e.,timprovetdesign
tqualityttotatdesiredtlevel),tand
Unintentionalt iterations,tresultingtfromtnewtinformationtarrivingtlatetintthetprocesst(causedtbytouttoftsequencetactivities,tfluid
trequirementstortdesigntgoals,tmistakes,tetc.).2
Thetfirsttstepttowardstreducingtproducttdevelopmenttcyclettimetandtvariationtliestint minimizingtunintentionaltiterations.t
Thistconsiststoftinsuringtthattthetrighttinformationtistavailabletatt thetrightt placetattthetrightttime;tactivitiestaretproperlyt
sequenced,tgiventrelevanttconstraints;tresourcestaretavailablettotthetactivitiestwhentneeded;trequirementstaretfirmtastquickly
tastpossible;tandtmistakestaretminimized.
Thetnexttstepttowardstacceleratingtthetdesigntcycletinvolvesttwotbasictoptionstfortmanagingtintentionaltiterations:
Fastertiterations,t and
Fewertiterations.t [20]
Fastertiterationstcantbetachievedtby,te.g.,tCADtsystemstthattacceleratetindividualtactivities,tsimulationtandtanalysisttoolst
thattreducetdependencetonttime-
tconsumingtprototype/testtcycles,timprovedtintragrouptcoordinationtfortteamstassignedttotindividualtactivities,tconcurrentt
engineeringtortIPPD,tintegrationtoftengineeringtanalysisttoolstusedtfortdisparatetactivities,tandtremovaltoftextraneous
tactivitiestfromtthetprocesst[20].tAtstudytbytEisenhardttandtTabrizit[18]tandtatmodeltbytGebalatandtEppingert[13]tfindtthat
tadditionalt(becausettheytaretfaster)titerationstaretsignificantlytcorrelatedtwithtfastertproducttdevelopment.tFewertiterationst
maytbetpossibletby,te.g.,timprovedtactivitytsequencing,timprovedtinterteamt(interactivity)tcoordination,tco-
locationtoftthosetexecutingthighlytinterdependenttactivities,tandtimprovedtassumptionst(learning)tabouttothertactivities.t
However,tfewertiterationstcantmeantlesstdesigntquality,tortattleasttatgreatertrisktthattthetdesigntwilltnottconvergettotthet
desiredttargets.tFastertiterationstreducetthistrisk,tsincetmoretiterationstimprovetthetchancetthattthetdesigntwilltconvergettota
cceptabletmultiattributetperformancetlevelst(alltelsetbeingtequal).tIntbothtcases,thowever,tthetquality,tgain,tortproductivity
tofteachtiterationtistimportantt[21].tFewertiterationstmighttmaketsensetifteachtonetistoftsufficienttproductivityttotensure
tacceptabletoutput.tFastertiterationstwilltonlytbetadvantageoustifteachtactivitytcantbetacceleratedtwhiletcontinuingtto
tproducetsatisfactorytoutputs.

IntroductionttotDSM-BasedtProcesstModelingt Methodology

ThistsectiontprovidestantextremelytbrieftoverviewtoftthetoriginstoftDSMstandtthetkeysttotDSMtmethodology.tDSMstcant
tracettheirtdevelopmentttotseveraltsetstoftroots.tPerhapstthetprimarytsourcet oftDSMtconceptstgrowstfromteffortsttotsolvet
systemstoftequationstintthetlatet1950standt1960s.
A

A B
A
t B B

Dependentt(Serial)

5
Interdependentt(Coupled)

A B A B A B
At A A A A A 
Bt  B B B B  B

Figuret 1:tActivityt Networkst andt DSMt Equivalents

Theseteffortstexpandedtintotareastsuchtastmatrixtmathematicst[e.g.,t22].t However,tDSMtconceptstaretalsotrelatedttotnetwo
rktprecedencetdiagramst[e.g.,t23,t24]tandtnetworktrelationshiptdiagramst[e.g.,t25].tSystemstengineerstfamiliartwithtinterfac
e-to-interfacet(N-to-NtortN2)tdiagramst[26]twilltalsotrecognizettheirtsimilarityttotDSMs.
Formaltdefinitiontandtapplicationtoftthesetconceptsttotdesigntprocesstissuestcametint1981,twhentStewardtdescribedtthet“des
igntstructuretmatrix”t[27,t28].tInt1989,tRogerstattNASAtbuilttsoftwarettotaidt intanalyzingtsuchtmatricest[29].tActualtuseti
ntindustrytsettingstbegantaboutt1990,tastseveraltprofessorstandtstudentstattthetMassachusettstInstitutetoftTechnologyt(MIT)
tbuilttresearchtaroundtthetdesigntstructuretmatrixtandtexpandedtitstapplications,3tastsummarizedtint[39].tIntthetlasttfewtyear
s,tthistworkthastexpandedtbeyondtMITttotindustrytandtothertuniversities,4tandt thetresultingtneedtfortatmoretgeneraltnameth
astledttotthettermtdependencytstructuretmatrix,twhichtretainstthetinitialismt“DSM”tlefttovertfromtSteward’stwork.
ThetDSMtistatsquaretmatrixtwithtonetrowtandtcolumntpertactivity.tThetactivitiestaretlistedtintroughlytchronologicaltorder,t
withtupstreamtortearlytactivitiestlistedtintthetuppertrows.tDiagonaltelementstaretplaceholderstintatsimpletDSM,tandtoff-
diagonaltelementstindicatetactivitytinterfaces.tFiguret1tshowstthetnetworktflowcharttandtDSMtrepresentationstoftbasictacti
vitytrelationships.5tBecausetoft thet temporaltorderingtoftthetactivities,tsubdiagonaltmatrixtelementstshowt feedforwardtinfo
rmationt (sucht ast thet flowt from

3t [5,t 12,t 16,t 17,t 20,t 30-38]


4t [e.g.,t 40,t 41]

Diagramstadaptedtfromt[31,t42].

6
activitytAttotactivitytBtintthetserialt case).tSuperdiagonaltelementstindicatetfeedback,tthetpotentialtfortiterationtandtreworkt
intthetprocess.tThus,t iftactivitiestintrowst(andtcorrespondingtcolumns)titandtjtoftthetDSMthavetnotdirecttinterfaces,tentriest
ijtandtjit intthetmatrixtwilltbetzerotortempty.tIf,tontthetotherthand,tbothtentriestijtandtjitaretfilled,tthistindicatesttwo-
waytinterdependencytortcouplingtbetweentthetactivities.tUsuallytthistpointsttotsometkindtoft“chickentandtegg”tproblem,toft
whichtmanytexisttintcomplext systemtdesign.tTraditionaltPERT/CPMtmethodstandtGantttchartstdotnottadequatelytrepresent
tthesettypestoftrelationshipstandttheirteffects.
Thetfollowingtistatsimpletexample,tshowingt atDSMtfortatfamiliartprocess,tputtingtontsockstandtshoest(Figuret2).6tInformat
iontandtprecedencetrelationshipstflowtintatcounter-
clockwisetdirectiontintthetmatrix,tsotthetmarkstbelowtthetdiagonaltimply,tfortinstance,tthatt“gettsocks”tmusttprecedet“putto
ntsocks,”tandt“gettshoes”tmusttprecedet“puttontshoes”tandt“inspecttshoes.”tThetmarktabovetthetdiagonaltintthetDSMtindic
atestthat,toncetshoesthavetbeentinspected,ttheytmaytbetfoundtwantingt(e.g.,ttootscuffedtuptortthetwrongtcolortfortthetclothe
s),trequiringtantiteration,t“gett(new)tshoes.”
Now,tthetgoaltintDSMtanalysistist tot resequencetthetactivitiestsotasttotminimizetiterationstandttheirtscope.tSincetthetactivit
iest“gettshoes”tandt“inspecttshoes”taretcoupled,thowever,ttheretistnotwayttotreordertthetrowst(andtcolumns)toftthetDSMttot
gettalltthetmarkstbelowtthetdiagonal.tFailingtthis,twetchangetourtgoalt to

ThistfivetactivitytDSMtexampletistadaptedtfromtatpresentationtbytStephentDenker,t“AtNewtWayttot ThinktAbouttProblem
s,”tPresentationttotProjecttManagementtInstitutet (PMI),t Bostont Chapter,t 6/19/97.

7
gettingtanytsuperdiagonaltmarkstastclosettotthetdiagonaltastpossible,tminimizingtthetscopetoftthetiteration.tIntFiguret2,tonc
etwet“gettshoes,”twetgotaheadtandt“puttontsocks”tandt“putt ont shoes”tbeforetwet“inspecttshoes.”tIf,tinstead,twetmovedtthe
tinspectiontsteptupstream,t astintFiguret3,twetminimizetthetimpacttoftatneedttot“gett(new)tshoes.”t(Essentially,t thist actt oft
movingtactivitiestupstreamtdemonstratestconcurrenttengineering:twetshortentthetfeedbacktlooptintthetprocesstint hopestthatt
wetwilltdecreasetthetvariancetinttotaltprocesstleadttime.)tWhiletintthistexampletwetcouldtnott eliminatetthetiterationtentirely
,toftentittistpossiblettotreducetthetnumbertoftpotentialtiterationstsubstantiallytbytresequencingtrowstandtcolumns.

GETtSOCKStGETtSHOEStPUTtONtSOCKStPUTtONtSHOES
INSPECTtSHOES 

 

Figuret 2:tDSMtfortthetProcesstoftPuttingt ont Sockst andt Shoes

GETtSOCKStGETtSHOES
INSPECTtSHOEStPUTtONtSOCKStPUTt
 ONt SHOES


 

Figuret 3:tResequencedtDSMtShowstImprovedtProcess

ThetDSMtalsotindicatestwhichtactivitiestcantbetaccomplishedtintparalleltwithouttcausingtadditionaltiteration.tFortexample,t
int Figuret3,t “gettsocks”tandt“gettshoes”tcantbetdonetsimultaneously,tastcant“inspecttshoes”tandt“puttontsocks”t(iftwethav
etenoughtresources!).tSometimestplannerstchoosetactivitiesttotworktintparalleltwithouttfirsttconsideringttheirtinformationtde
pendencies,twhichtcantresulttintadditionaltiterationtandtthus,tmore,tnottless,tcyclettime.
ThetDSMtintroductiontintthistsectiontist verytsimple.tWhilettimetandtspacetdotnottpermittatfulltdiscussiontandtassimilationt
oftalltapplicablettheorytandtpractice,tthetfollowingtpointstwillthelptguidetfurthertinquirytandtmoretsophisticatedtusetoftDS
Mtmodels:

8
Offtdiagonaltelementstdotnotthavettotbinaryt(i.e.,tpresenttortnot):ttheytcantbetnumberstfromt0ttot1,tfromt0ttot9,tetc.t Thesetnumberstcan
tconveytanytoftatnumbertoftbitstoftinformationtregardingtthetinterfaces,tsuchtastprobabilitytoftiteration,tpercenttrework,tamounttoftdatat
flow,ttypetoftdatatflow,tsensitivityttotchangetintinputttotdownstreamtactivity,tetc.tFortinstance,tint thetexamplet above,tiftthetprobability
tofthavingttotredotthet“gettshoes”tsteptaftertthetresultstoftthet“inspecttshoes”tsteptaretintistestimatedttotbet0.4,tthistnumbertcouldtreplac
etthetsuperdiagonaltsquare.
Activitiestneedtnottbetlimitedttot“finish-to-
start”ttypetrelationships;ti.e.,tactivitiestcantbetpartiallytoverlappedtintcertaintcases,talthoughtthesetdecisionstshouldtbetbasedtontthetnatu
retoftinformationtproductiontandtusetbytthetupstreamtandtdownstreamtactivities,trespectivelyt[43].tFortexample,t“puttontsocks”tandt“pu
ttontshoes”tcouldtbetoverlapped,tperhapstbytputtingtontonet sock,tthentonetshoe,tthentthetothertsock,tthentthetothertshoe.
ActivitytdurationstmaytbetplacedtintthetdiagonaltelementstoftthetDSM,tandtthistalongtwithtthetknowledgetoftserial,tparallel,tandtcouple
dtactivitiestcantleadttotroughtcriticaltpathtcalculations.
Activitiestcapabletoftexecutiontintparalleltfromtantinformationtflowtperspectivetmaytyettbetheldtuptbytresourcetconstraints.tAtmoretco
mpletetanalysistmusttaccounttfortthesetconstraints.tFort example,tthetDSMtabovetindicatestthatt“gettsocks”tandt“gettshoes”tcantoccurti
ntparallel.tButtiftwetonlythavetonetpersontavailabletfortbothtactivities,t wet maytnottintfacttbetablettotdotbothtattonce.

5tDSMt Capabilitiest andt AdvantagestfortCycletTimetReduction

Thet DSMt hast numeroust advantages,t buttperhapstthettwotgreatesttonestare:


Conciset representationtoftcomplextprocesses,
providingtatsystemstview,tand
Cleartrenderingtoftpotentialtiterationtintsuchtprocesses.

Othertadvantagestandtcapabilitiestinclude:
Atdescriptiontoftatprocesstthattcantbetanalyzedtandtmodifiedttotprovidetat prescriptiontfortatprocesstwithtreducedtscheduletrisktandtcyc
lettime.
Atmeansttot moret accuratelyt managet schedulet and
anticipatetscheduletrisk.
Atsystemstviewtoftprojecttactivitiestandttheirtrelationshipstwhichtdrivetcyclettime.

9
Atmodeltdemonstratingtappropriatelytconcurrenttactivities.
Atmeansttot quicklytexaminetpotentialtactivitytand
decisiontsequencetchangest ("whatt if"t capabilities)tforttheirteffecttontschedule.
Atviewtfromtwhicht tot deployt resourcest tot reduce
unintentionaltiterations.

Fromtthetdescriptiontandtexamplestabove,twetcantseethowtthetmethod’stcapabilitiesthelptmeettthetchallengestnotedtearlier:
Inefficienttdistributiontoftpersonneltandtresources,tincludingtfacilitiestandttoolstandtespeciallytinformation,tresultstintpartstoftthetproject
tspendingt“down”ttimetwaitingtfortresourcestwhenttheytcouldtbetworking.tThetDSMtshowstwhichtactivitiestdependtontotherstfortimpor
tanttresourcestandtwhentthesetresourcestwilltbetneeded,thelpingtmanagerstinsuretthattthetrighttresourcestaretavailabletattthetrighttplacet
andtattthetrightttime.
Unstabletrequirementstmaketdecisivenesstdifficulttandtfostertredesign.tThetDSMtcantbetusedttottracettheteffectstoftchangingtinformatio
n.tMoretsophisticatedtDSMtanalysistcanteventhelptquantifyttheteffectstoftsuchtchangestontprojecttcosttandtschedule.tThistkindtoftinfor
mationtistvaluablettotthosetdecidingtif,twhen,tandthowtmuchttotchangetrequirements.
Longtandtvariedtactivityt“pipelines”tmeantshortertdurationtactivitiestfinishtandtwaittfortlongertdurationtactivitiesttotproducetneededtres
ults.tBytexaminingtthetdurationstoftactivitiestint at DSM,tonetcantquicklytisolatetthesetsituationstandtaccounttfortthemtintprojecttplans.
Lacktoftactivitytcoordinationtresultstint wastedttime,tdoingtthetwrongtwork,tandtinappropriatetcommunication.tUsingtatDSMtallowstact
ivitiesttotseettheirtplacetintantoveralltprocess,tenablingtthemttotseetwhattothertactivitiestneedttheirtresultstandtwhen.
Highlytinterdependenttortcoupledtactivitiestincreasetthetchancestoftiterationtortrework.tThetDSMthighlightstthesetsituations,tenablingtpl
annersttotmoretappropriatelytaccounttfortthem.
Overlytambitioustinitialtschedulestmaketfurthertcyclettimetreductionsteventmoretdifficult.tBytshowingtthetamounttoftiterationtintatproc
ess,tthetDSMtprovidestatquicktchecktoftscheduletfeasibilitytandtrisk.tThistbringstadditional,timportanttinformationttotcyclettimetreducti
ontefforts.
Manytseeminglytfeasibletcyclettimetreductiontsolutionsthavetadversetsideteffectstwhichtreducetanticipatedteffectiveness.tThetsystemstv
iewtprovidedt byt thet DSMtdecreasest thet chancest that
processtreengineeringteffortst willt misst theirt marktintreducingtcyclettime.

Intconclusion,tthetDSMtmethod—
whicht hastexistedtintthetliteraturetfort17tyearstbuttistonlytnowtbecomingtwidelytrecognized—
istshownttotprovidetutilityttotprojecttmanagerstwhotseekttotreducetscheduletrisktandtcyclettime.
References

K.B. Clark and T. Fujimoto, Product Development Performance:Strategy, Organization, and Management in the World
Auto Industry. Boston: Harvard Business School Press, 1991.
S.C. Wheelwright and K.B. Clark, Revolutionizing Product Development: Quantum Leaps in Speed, Efficiency, and Quality.
New York: Free Press, 1992.
K.B. Clark and S.C. Wheelwright, Managing New Product and Process Development. New York: Free Press, 1993.
E. von Hippel, "Task Partitioning: An Innovation Process Variable" Research Policy, vol. 19, pp. 407- 418, 1990.
R.P. Smith and S.D. Eppinger, "A Predictive Model of Sequential Iteration in Engineering Design" Management Science,
vol. 43, pp. 1104-1120, 1997.
S.D. Eppinger, "Three Concurrent Engineering Problems in Product Development." Cambridge, MA, 1995.
K.G. Cooper, "The Rework Cycle: How it Really Works… And Reworks…" PMNETwork, 1993.
K.G. Cooper, "The Rework Cycle: Benchmarks for the Project Manager" Project Management Journal, vol. 24, 1993.
K.G. Cooper, "The Rework Cycle: Why Projects are Mismanaged" PMNETwork, 1993.
D.N. Ford, The Dynamics of Project Management: An Investigation of the Impacts of Project Process and
Coordination on Performance, Ph.D. Thesis (C.E.), M.I.T., Cambridge, MA, 1995.
S.D. Eppinger, M.V. Nukala, and D.E. Whitney, "Generalised Models of Design Iteration Using
Signal Flow Graphs" Research in Engineering Design, vol. 9, pp. 112-123, 1997.
S.D. Eppinger, D.E. Whitney, R.P. Smith, and D.A. Gebala, "A Model-Based Method for Organizing Tasks in Product
Development" Research in Engineering Design, vol. 6, pp. 1-13, 1994.
D.A. Gebala and S.D. Eppinger, "Modeling the Impact of Organizational Structure on Design Lead Time and Product
Quality", MIT Sloan School of Management, Cambridge, MA, Working Paper no. 3301, May, 1991.
D.E. Whitney, "Designing the Design Process" Research in Engineering Design, vol. 2, pp. 3-13, 1990.
K.J. Singh, J.W. Erkes, J. Czechowski, J.W. Lewis, and M.G. Issac, "DICE Approach for Reducing Product Development
Cycle", Proceedings of the Worldwide Passenger Car Conference and Exposition, Dearborn, Mich., Sept. 28-Oct. 1, 1992,
pp. 141- 150.
D.S. Cesiel, A Structured Approach to Calibration Development for Automotive Diagnostic Systems, Master's Thesis
(Mgmt./E.E.), Massachusetts Institute of Technology, Cambridge, MA, 1993.
S.M. Osborne, Product Development Cycle Time Characterization Through Modeling of Process Iteration, Master's Thesis
(Mgmt./Eng.), M.I.T., Cambridge, MA, 1993.
K.M. Eisenhardt and B.N. Tabrizi, "Accelerating Adaptive Processes: Product Innovation in the Global Computer
Industry" Administrative Science Quarterly, vol. 40, pp. 84-110, 1995.
D. Clausing, Total Quality Development: A Step-by- Step Guide to World-Class Concurrent Engineering. New York:
ASME Press, 1994.
R.P. Smith and S.D. Eppinger, "Identifying Controlling Features of Engineering Design Iteration" Management
Science, vol. 43, pp. 276- 293, 1997.
D.G. Pekar, Modeling Design Time and Quality Tradeoffs in Automotive Component Design, Master's Thesis (Mgmt.),
MIT, Cambridge, MA, 1992.
J.N. Warfield, Societal Systems: Planning, Policy, and Complexity. New York: John Wiley & Sons, 1976.
E.P.C. Fernando, "Use of Interdependency Matrix for Expediting Implementation of an Integrated Development Programme
in a Developing Country", Proceedings of the Second International Congress for Project Planning by Network Analysis,
Amsterdam, 1969, pp. 76-85.
M. Hayes, "The Role of Activity Precedence Relationships in Node-Oriented Networks", Proceedings of the Second
International Congress for Project Planning by Network Analysis, Amsterdam, 1969, pp. 128-146.
J.W. Lorsch and P.R. Lawrence, Ed. Managing Group and Intergroup Relations. Irwin Series in Management and the
Behavioral Sciences. Homewood, Ill.: Richard D. Irwin, 1972.
DSMC, Systems Engineering Management Guide. Defense Systems Management College, 1990.
D.V. Steward, Systems Analysis and Management: Structure, Strategy, and Design. New York: PBI, 1981.
D.V. Steward, "The Design Structure System: A Method for Managing the Design of Complex Systems" IEEE
Transactions on Engineering Management, vol. 28, pp. 71-74, 1981.
J.L. Rogers, "Integrating a Genetic Algorithm into a Knowledge-Based System for Ordering Complex Design Processes",
NASA, Hampton, VA, Technical Manual TM-110247, April, 1996.
T.A. Black, C.F. Fine, and E.M. Sachs, "A Method for Systems Design Using Precedence Relationships: An Application
to Automotive Brake Systems",
M.I.T. Sloan School of Management, Cambridge, MA, Working Paper no. 3208,, 1990.
S.D. Eppinger, "Model-based Approaches to Managing Concurrent Engineering" Journal of Engineering Design, vol. 2,
pp. 283-290, 1991.
D.A. Gebala and S.D. Eppinger, "Methods for Analyzing Design Procedures", Proceedings of the ASME Third
International Conference on Design Theory and Methodology, 1991, pp. 227-233.
V. Krishnan, S.D. Eppinger, and D.E. Whitney, "Simplifying Iterations in Cross-Functional Design Decision Making"
Journal of Mechanical Design, vol. 119, pp. 485-493, 1997.
K.R. McCord, Managing the Integration Problem in Concurrent Engineering, Master's Thesis (M.E.), Massachusetts
Institute of Technology, Cambridge, MA, 1993.
M.D. Morelli, S.D. Eppinger, and R.K. Gulati, "Predicting Technical Communication in Product Development
Organizations" IEEE Transactions on Engineering Management, vol. 42, pp. 215-222, 1995.
T.U. Pimmler and S.D. Eppinger, "Integration Analysis of Product Decompositions", M.I.T. Sloan School of Management,
Cambridge, MA, Working Paper no.3690, May, 1994.
M.W. Sequeira, Use of the Design Structure Matrix in the Improvement of an Automobile Development Process, Master's
Thesis (MSE/Mgt.), M.I.T., Cambridge, MA, 1991.
R.P. Smith and S.D. Eppinger, "Modeling Design Iteration", M.I.T. Sloan School of Management, Cambridge, MA,
Working Paper no.3160,, 1990.
T.R. Browning, "An Introduction to the Use of Design Structure Matrices for Systems Engineering, Project Management,
and Organization Planning",
M.I.T. Lean Aircraft Initiative, Cambridge, MA, Working Paper #WP97-001-18, Feb. 18, 1997.
S. Austin, A. Baldwin, and A. Newton, "A Data Flow Model to Plan and Manage the Building Design Process" Journal of
Engineering Design, vol. 7, pp. 3-25, 1996.
D.L. Grose, "Reengineering the Aircraft Design Process", Proceedings of the Fifth AIAA/USAF/NASA/ISSMO
Symposium on Multidisciplinary Analysis and Optimization,
Panama City Beach, FL, Sept. 7-9, 1994
R.P. Smith, Development and Verification of Engineering Design Iteration Models, Ph.D. Thesis (Mgt.), M.I.T.,
Cambridge, MA, 1992.
V. Krishnan, S.D. Eppinger, and D.E. Whitney, "A Model-Based Framework to Overlap Product Development Activities"
Management Science, vol. 43, pp. 437-451, 1997.