Network Diagram: Engineering Field Office - 445 CD
The network diagram outlines the schedule and durations for various construction activities for a building project. It shows excavation and formwork taking place over 10 days to begin, followed by 59 days of steel works for foundation columns on the first floor. Various concrete, steel, and formwork activities are scheduled for subsequent floors along with other tasks like masonry, plumbing, electrical, and finishes over the full 445 day duration of the project. Safety monitoring is scheduled throughout.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
50 views
Network Diagram: Engineering Field Office - 445 CD
The network diagram outlines the schedule and durations for various construction activities for a building project. It shows excavation and formwork taking place over 10 days to begin, followed by 59 days of steel works for foundation columns on the first floor. Various concrete, steel, and formwork activities are scheduled for subsequent floors along with other tasks like masonry, plumbing, electrical, and finishes over the full 445 day duration of the project. Safety monitoring is scheduled throughout.