Ace Sdnoc User Manual-1
Ace Sdnoc User Manual-1
AUTO-
CONFIG
ENGINE
ACE TX DROP-I
PROVISIONING GUIDELINES (BPM & NETP)
Index-
1. Summary-Drop-1 activation.
2. Crammer relations
3. BPM Activation steps –New Order
4. Topology Diagram checking on NetP GUI.
5. BPM Activation steps –MACD Orders
6. Precautions while creating the order through BPM-
a. Don’t do: Wrong MACD selection ( like instead of Upgrade, downgrade selection)
b. Don’t do: Success EOR re-fire ( already Success EOR re-fired for Execution)
7. BPM Activation steps –Termination
8. BPM Activation steps –IOR- HOT
9. BPM Activation steps –IOR-MSB and EOR
10. Error handling
11. Circuit Status check and Damage Circuit correction.
12. NW Devices Upload to NetP and Verify.
13. Manual Verify operation and Post NCCM Sync up tool.
14. Current Ongoing issues of ACE-
a. Activation on ECI Serial- NBI License.
b. Early Message by NetP on Node visibility and CLR issues.
c. Manual Server trail creation between 2 UMEs for VBL NW.
d. VBL NW EOS circuit activation issues.
e. VBL NW whole upload while changes happened in some nodes.
f. Making Fibcom and Tejas nodes Un-managed through NetP.
g. TCL ECI Cross connection grouping
h. Fibcom EMAP4s, ETEX and Tejas ELAN card modeling.
i. TCL ECI intermediate optical points trace validation.
15. Post Go Live IT support and NC support.
16. Daily Circuit Activation through ACE- MIS Template
17. Daily Activation Reports and Analysis.
SUMMARY DROP-1 ACTIVATIONS:
WHAT IS DROP-1?
It is a Phase of ACE Project which covers mentioned four devices for New Order
Activation/Upgrade/Downgrade/Terminate.
a. Ciena
b. Fibcom
c. ECI
d. Tejas
The above mentioned four devices covers nearly 90% of New Order/MACD Order, hence it is a strategic
approach to cover the maximum scenario for SDNOC.
Need to complete those non-drop-1 devices first and then proceed through ACE
1. Issued
2. Active
3. Marked For Delete(MFD)
1. Planned in Progress(PIP)
2. Ready in Service (RIS)
1. PIP: The entire underlying layer must be in PIP for a new order
provisioning.
2. RIS: Once the order becomes active in Network, the provisioning
status changes to RIS.
NEW ORDER PROVISIONING THROUGH BPM
STEPS INVOLVED IN NEW ORDER PROVISIONING THROUGH ACE BPM:
S.NO Process Description of the Process Expected Output Probable Errors Root Cause
Once Order Source is selected as Metasolv, COPF ID Field becomes Mandatory and if the Order Source is
selected as Viznet , Schedule ID Field becomes Mandatory.
Once Verify option is done, we get Service details (Like customer name, Customer Type and service
Type) automatically from CBOSS. We need to press SUBMIT button to complete the operation of
GET_CLR.
After selecting Submit option, search window appears, enter the circuit ID and press Search.
A list of all operations performed on that order appears with their status.
User need to select the transaction which they are working upon.
The First transaction listed above will be the latest transaction. We need to click on the link to get
details.
STEP_3: INITIATE_Create_Order and STEP4: CLAIM_Manual_Configuration
The next page which appears has Auto-refresh feature which results in GET_CLR success and INITIATE
CREATE ORDER.
This is followed by claiming the task. In The same page, all manual configurable devices will be listed out.
STEP 5: COMPLETE_Manual_Configuration
LET us see other options at this Page
STEP 6: CLAIM_Activity_GoAhead
STEP7: COMPLETE_Activity_GoAhead
1. Click Ignore post Validation. This will automatically check update Cramer.
2. Select the cancellation reason or select others and write the appropriate reason
3. Clicks cancel post validation.
1) Go to Resource Application
2) Go to Elements and select link type as-
a) SonetSDH Circuit – both End optical
b) PDH Circuit—at least one end drop on E1/E3/DS3 drop
c) VCAT Member—at least one end Ethernet drop
3) List All
4) Select your circuit
5) Click on Topology.
Topology view looks like below. This can be saved in picture format.
MACD ORDER (UG, DG) PROVISIONING THROUGH
BPM
STEP-2:
ONCE ABOVE STEPS ARE COMPLETED, A USER HAS TWO OPTION TO MOVE FORWARD—
A) CONFIRM CLR DELETE –Deletes MFD CLR from Cramer (old path)
B) CANCEL CLR DELETE—Changes the Cramer state from MFD to Issued (Used for roll-back).
This will delete CLR which was in MFD state. So, old CLR will be deleted and new CLR will become Active
in Cramer.
This will not delete old CLR from Cramer. It will just change CLR status from MFD to Issued. This can be
used for roll-back operation.
COOLING-OFF PERIOD:
COOLING-OFF period is a time duration which auto-deletes CLR from Cramer after a certain time when
there is no response from user regarding Confirm CLR deletion/Cancel CLR deletion.
EOR REQUEST:
1. ADD NODE --- Nodes are added in a network (in Linear Topology)
2. DELETE NODE—Nodes are deleted from a network (Linear Topology)
3. INSERT NODE -- Nodes are inserted in the ring. (2 MSB Required)
4. REMOVE NODE—Nodes are removed from the ring (1 MSB Required)
5. INSERT CARD—Insert card in the Node
6. DELETE CARD--- delete Card from the NODE.
1. Go to EOR Request EOR Configuration Tx.
2. Write the EOR No.
3. Select the appropriate operation.
INSERT NODE:
This Node is inserted in a ring. So we need to fill two MSB’s for this..
ERROR
HANDLING.xlsx
CIRCUIT STATUS CHECK AND DAMAGED CORRECTION.
1. Go to Equipment module
2. Select the node Type
3. Go to Elements Node
4. List all the nodes
5. Select the node to be uploaded.
6. Go to Upload and select the required option
A) Node_Fabric: Uploads Cards , Ports and Protection Group (MSP,BLSR)
B) Node_Fabric_Service: uploads Cards, Ports, Protection Group and CCX.
NCCM—CBOSS STEPS: TO UPLOAD CBOSS DATA TO NETP DB
http://10.209.19.174:8580/intranetV1/login.jsp?errMsg=
Existing: ABCD
Proposed: ABYZ
3) PERFORMANCE REPORT
It contains fields such as-
a) Activation ID
b) Order Category (Service, IOR)
c) Order Type (New, Terminate, MACD)
d) Order Initiation Date
e) Order Completion Date
f) Order Processing Time
g) Config Response Time
h) Post Validation Response Time.
4) PRODUCTIVITY REPORT
It contains fields such as-
a) Activation ID
b) Service/EOR/IOR ID
c) Order Category (Service, IOR)
d) Order Type (New, Terminate, MACD)
e) Config Status (SUCCESS/FAILURE)
f) Post-validation Status (SUCCESS/FAILURE)
g) Order Status (COMPLETE/IN PROGRESS/CANCELLED)
h) Order Initiation Date
i) Order Completion Date
j) Originator name
k) Originator group