Vision: Maka-Diyos Maka-Tao Makakalikasan Makabansa
Vision: Maka-Diyos Maka-Tao Makakalikasan Makabansa
DEPARTMENT OF EDUCATION
REGION IV-A CALABARZON
Division of Laguna
District of Pagsanjan
PAGSANJAN SENIOR HIGH SCHOOL
Pagsanjan
Mandate
The Department of Education was established through the Education Decree of 1863 as the
Superior Commission of Primary Instruction under a Chairman. The Education agency underwent
many reorganization efforts in the 20th century in order to better define its purpose vis a vis the
changing administrations and charters. The present day Department of Education was eventually
mandated through Republic Act 9155, otherwise known as the Governance of Basic Education act of
2001 which establishes the mandate of this agency.
The Department of Education (DepEd) formulates, implements, and coordinates policies,
plans, programs and projects in the areas of formal and non-formal basic education. It supervises all
elementary and secondary education institutions, including alternative learning systems, both public
and private; and provides for the establishment and maintenance of a complete, adequate, and
integrated system of basic education relevant to the goals of national development.
Table of Contents
Preliminaries Page
1
Mandate………………………………………………………………………….. 1
Table of Contents……………………………………………………………….. 2
List of Tables………………………………………………………………………. 3
List of Figures……………………………………………………………………… 3
List of Acronyms………………………………………………………………….. 3
I. INTRODUCTION………………………………………………………………………… 4
V. OUTSTANDING ACCOMPLISHMENTS……………………………………………… 10
12
Lists of Tables
Table Page
2
5 Educational Outcomes/Results…………………………………….. 9
6 Winnings, Achievements and Awards Received……………….. 10
7 Target and Accomplishments………………………………………. 11
8 Utilization of Canteen Net Income………………………………… 11
9 Programs and Projects……………………………………………….. 12
List of Figures
Figure Page
LIST OF ACRONYMS
I. INTRODUCTION
Pagsanjan Senior High School from the district of Pagsanjan, Laguna has eighty seven
learners from Grades 11 and 12 during the school year 2019-2020. It has 12 Nationally Funded plantilla
positions: one(1) Principal II, three(3) Master Teacher II, one(1) Teacher III, four(4) Teacher II, and one(1)
Teacher I, and two Administrative Assistant positions.
With the passage of RA 10533 also known as the K to 12 law, Pagsanjan Senior High School was
established to cater grade 10 completers who are inclined to Technical-Vocational courses such as
Automotive Servicing (NC II) and Computer System Servicing (NC II).
Anchored on the DepEd Vision, Mission and Core Values the foremost mission of the school is to
provide quality basic education that will truly develop potentials of the children to become better citizens,
equipped with clear understanding on how they will make their life successful thru lifelong learning which
will enable them to become responsible citizens with deep sense of nationalism and faith in God.
3
Table1
Performance Indicator
Organizational Increase/
Outcomes KPIs 2015 2016 2017 2018 2019 Decrease
Kinder
Elem
Enrolment JHS
SHS 70 132 127 87 Decrease
Elem
ALS Sec
Basic Lit.
ACCESS Prog.
SPED -
Madrasah -
NIR* Elem
NER* Elem
Sec
GER* Elem
Sec
Organizational Increase/
Outcomes KPIs 2015 2016 2017 2018 2019 Decrease
CSR Elem
Sec
ComR Elem
Sec
EFFICIENCY SDR Elem
Sec
TRANS Elem
Sec
REP Elem
Sec
QUALITY NAT/ G6
Quarterly Y4
Test
Table 2
Status of Basic Education Resources
Type Opening Unit No. of Plantilla Filled-up Vacant
Schools Positions
Non-Implementing Kindergarten
Unit Elementary
Junior High
School
Total
Implementing Unit Division Office
Junior High
4
School
Non-Implementing With Senior 1 12 12 0
Unit & Implementing High School
Unit
Overall Total 1 12 12 0
Table 3
School Accomplishment
(previous SY) CY (current) Percentage (%)
Major Final Outputs (MFOs) Accomplishment Target Accomplishm of
ent Accomplishment
PARTNERSHIP AND LINKAGES
Adopt-a-School Program 7 7 7 100%
Brigada Eskwela Program 58 65 50 77%
Partnership & Linkages with line
Agencies and Private Stake 6 6 6 100%
Holders
EDUCATION FACILITIES
School Building Program
Facilities
Constructed/Completed
Classrooms
Kinder-Grade 10 0 1 0
0%
Senior High School
Repair of Gabaldon Buildings 0 0 0 0%
Regional Office Initiated 0 0 0 0%
Projects
HEALTH, DENTAL AND NUTRITION
School-Based Feeding Program 10 13 11 85%
5
Campaign and Advocacy
DRRM Capability Building 1 1 1 100%
Program
DRRM Division Coaching 1 1 1 100%
Table 4
Accomplishments of Programs and Projects
Home
Visitation
QUALITY Project At SLAC, ACHIEVED At least Php Below 65% 65,000.00
TITAN least INSET, AT LEAST 65% 65,000.00 MPS
65% GAD, CIP 65% mps in MPS in
MPS in all subject all
all areas subject
learnin areas
g areas
Procur
Project ement Procuremen Purchased and Php60,000 Inadequate 75,000
TLMP of t of needed acquired 100% of instructiona
100% instructional needed the l materials
needed and teaching instructional needed
instruct materials materials instructio
iional nal
and materials
referen were
ce purchase
materia d
ls
6
improv functional rooms at
ed/repa learning the end of
ired laboratories. the school
class 2. Looking year.
rooms for sponsors
at the of used but
end of still
the serviceable
school laboratory
year. materials and
equipment.
3. Making
‘promotion”
leaflets on
social
networking
sites about
the school
and try to
“advertise”
its strengths
and its needs
for
improvement
.
4. Repair of
classrooms.
5. Repaint of
walls/armcha
irs /tables.
6. Purchase
of Janitorial
supplies.
7. Fidelity
bond.
1.Scheduling
the meeting
much earlier
so that
parents can
find time to
attend.
2.Stirring
parents
awareness by
encouraging Increase in the
At children to Participation At least
Project least compel their in the 90% from 5, 000.00 90% 5, 000.00
Family Day 90% parents to different 84% participated
in School from attend the school participate in the
Day 84%pa meeting. activities and d in the different
rticipat 3.Conducting programs different school
ed in of family and school activities
differe school activities and
nt activities. and programs
school 4. Gulayan programs
activiti sa Paaralan at the end
es and of the
progra school
ms at year.
the end
of the
school
year.
Table 5
Educational Outcomes/Results
7
SY 2018- SY 2019- SY 2018- SY 2019-2020
2019 2020 2019
ACCESS
ENROLMENT
*Kindergarten
*Grades 1-6
*Years 7-10
*Year 11-12
ALS
*Elem
*Sec 150 160 127 87 GAP
*Basic Lit. Prog.
GROSS ENROLMENT
RATE
*Kindergarten
*Grades 1-6
*Years 7-10
*Year 11-12 GAP
85% 54% 85% 54%
NET ENROLMENT
RATE
*Kindergarten
*Grades 1-6
*Years 7-10
*Year 11-12 86% GAP
55% 86% 55%
EFFICIENCY
COHORT SURVIVAL
RATE
*Grades 1-6
*Years 7-10
*Years 11-12 97% 96% 97% 96% gap
COMPLETION RATE
*Grades 1-6
*Years 7-10
*Years 11-12 97% 96% 97% 96% gap
DROP OUT RATE
*Grades 1-6
*Years 7-10
*Years 11-12 2% 2% 4% 3% gain
QUALITY
NAT Results
*LAPG None to Report None to None to None to
*NAT 6 Report Report Report
*NAT10
V. OUTSTANDING ACCOMPLISHMENTS
Table 6
Winnings, Achievements and Awards Received
Name Competitions, Achievements and Awards Received
8
Students
None None
School Heads
DAVID E. TITAN JR. BRIGADA ESKWELA AWARDEE – DIVISION LEVEL
School
PAGSANJAN SENIOR HIGH SCHOOL
3RD Place in BRIGADA ESKWELA
Table 7
Target and Accomplishment
a. MOOE
Figure 1
It shows the MOOE Proceeds of the school. Projects and Programs has the highest
percentage of budget. These will help to improve the acacemic performance of the school and the
lowest MOOE budget is the Seminars/GAD whICH iS 5% .
b. Canteen Fund
Table 8
Utilization of Canteen Net Income
The Table shows the School Canteen Net Income in a year. There is an increase and
decrease in the monthly income. There is no specific amount. The proceeds are allotted to the needs
of the school and intended to the six shares/utilization such as: Supplementary Feeding 35%, School
Clinic (5%), Faculty/Student Dev. Fund 15%, H.E. Instructional Fund 10%, School Operating Fund
9
25%, and Revolving Capital 10%. The net income helped the school as well as the pupils in the
implementation of DepEd/school programs and projects.
Table 9
Programs and Projects
Projects and Description Impact
Programs
Project SAGIP Dropping out from school have a great effect in Zero drop-out rate in the
(Student the student’s future. Drop out rate also affects the community
Assistance thru performance rating of the school. This program
Guidance to aims to reduce drop-out rate by 2%
Increased
Participation)
Project TITAN Competent teachers produce competent students Increased in the MPS of
(Teaching the school by at least
Intervention and 65% in all subject areas
Technical
Assistance Now)
A. Plan Evaluation
PTA Fund for the support of other projects and programs of school.
SEF for major repair of classrooms.
DepEd/SEF Fund for the construction of school fence
a. Student Development
Increase the MPS Result at least 65% in all learning areas.
Zero dropped out rate.
Increase the enrolment especially the Grade 11 students.
Lessen the number of students absenteeism.
b. Staff Development
10
Trainings/Seminars should be open to all.
Increase the number of teachers who are enrolled in graduate studies.
Punctuality of teachers in submission of reports.
c. CURRICULUM
d. PHYSICAL FACILITIES
11
12
Seminars and Trainings
13
14
Project REPAIR
15
Prepared by:
Noted:
LOURDES S. GECOLEA
District Supervisor
16
17