TABLE OF CONTENTS
1. Visual Inspection
2. Insulation resistance test
3. Winding resistance measurement
4. Polarity test
5. Ratio test by current primary injection
6. Magnetizing current test (minimum 2 points above )
7. Loop resistance measurement test (burden test)
8. Phase identification test
9. Verify secondary circuits, terminals, shorting/isolating links by primary injection
10. High voltage test.
11. Single point earthing check
12. Demagnetize CT cores after all tests
1. Visual Inspection
♦ Inspect for physical damage / defects
♦ Check nameplate information for correctness
♦ Check that all grounding cables are securely connected
♦ Check color coded for secondary wiring and size of wires against specs.
♦ Check proper lugs has been used in termination
♦ Check CT’s location physically and secondary terminal labeling printed
S1
MEGGER
S2
P2
INSULATION TEST ARRANGEMENT
P1
S1
MILIOHMMETER
S2
P2
CT RESISTANCE MEASURING ARRANGEMENT
4. Polarity Test
♦ Check the CT polarities on the Terminals as per the Schematic Drawing in the LV -compartment for
correct polarity.
P1
S1
+
SENSITIVE
SWITCH
AMMETER
A
S2
-
+
BATTERY
-
P2
CT POLARITY TEST ARRANGEMENT
P1
S1
AMMETER A
PRIMARY S2
INJECTION
TEST SET
P2
CT RATIO TEST ARRANGEMENT
P1
STEP UP
VARIAC TRANSFORMER S1
A
AC SUPPLY V
S2
P2
PLOTTING OF THE MAGNETIZATIOM CURVE
ARRANGEMENT
S1
S1
RELAY
S2
RELAY V
S2
A
MILIOHMMETER
CURRENT
SOURCE
P2 P2