0% found this document useful (0 votes)
63 views13 pages

Metrados P&M 12.02 Al 17.02

The document is a work plan for expanding and improving water and sanitation services along several streets in Sunampe. It includes a table with details of the planned excavation, installation of pipes and other infrastructure between each pair of existing water access points ("buzones") along the listed roads. The table specifies the length and diameter of pipe to be installed, as well as quantities of other materials. The work involves replacing or extending pipes between 44 sets of buzones along avenues and streets in the area.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
63 views13 pages

Metrados P&M 12.02 Al 17.02

The document is a work plan for expanding and improving water and sanitation services along several streets in Sunampe. It includes a table with details of the planned excavation, installation of pipes and other infrastructure between each pair of existing water access points ("buzones") along the listed roads. The table specifies the length and diameter of pipe to be installed, as well as quantities of other materials. The work involves replacing or extending pipes between 44 sets of buzones along avenues and streets in the area.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 13

MUNICIPALIDAD DE SUNAMPE

EXPEDIENTE TECNICO: " AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA AV. PARAISO, CALLE JOSE OLAYA, CALLE MIGUEL GRAU, AV. PRIMAVERA CC.PP LOMO LARGO, CALLE 03 DE OCTUBRE CC.PP. SANTA FE, CALLE LAS LOMAS CCPPP. LA VICTORIA, CALLE LAS LOMAS

PLANILLA DE METRADOS
3P
FECHA: 29 ENE AL 24 FEB. SUBCONTRATISTA P&M

EXCAVACION ENTIBADO SUMINISTRO DE TUBERIA

Buzones 1.20 - 1.50 1.50 - 2.00 2.00 - 2.50 2.50 - 3.00 2.00 A 3.00 200.00 250.00 315.00 355.00 CORTE DE DEMOLICION DE
Alt. Prom. Long. Entre PAVIMENTO PAVIMENTO
DESCRIPCION Cant. Alt.Bz. Inicio Alt.Bz. Fin Ø Tub. (mm) Long. Tub.
Bz. Buzones
BZ. Inicio @ BZ. Fin M M M M M2 M M M M

AVENIDA PARAISO BZ - 22 @ BZ - 23 1.00 2.40 2.52 2.46 200.00 47.00 45.80 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 90.80 34.05
CALLE JOSE OLAYA BZ - 22 @ BZ - 24 1.00 2.40 2.30 2.35 355.00 69.70 68.50 0.00 0.00 68.10 0.00 28.80 0.00 0.00 0.00 68.50 136.20 51.08
BZ - 24 @ BZ - 25 1.00 2.30 2.20 2.25 355.00 30.10 28.90 0.00 0.00 28.50 0.00 28.80 0.00 0.00 0.00 28.90 57.00 21.38
BZ - 25 @ BZ - 26 1.00 2.20 2.20 2.20 355.00 70.85 69.65 0.00 0.00 69.25 0.00 28.80 0.00 0.00 0.00 69.65 138.50 51.94
BZ - 26 @ BZ - 27 1.00 2.20 2.50 2.35 355.00 59.76 58.56 0.00 0.00 58.16 0.00 28.80 0.00 0.00 0.00 58.56 116.32 43.62
BZ - 27 @ BZ - 31 1.00 2.50 2.50 2.50 355.00 93.30 92.10 0.00 0.00 91.70 0.00 0.00 0.00 0.00 0.00 92.10
BZ - 31 @ BZ - 32 1.00 2.50 2.50 2.50 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 32 @ BZ - 33 1.00 2.50 3.15 2.83 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 33 @ BZ - 34 1.00 3.15 2.80 2.98 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

CALLE GRAU BZ - 23 @ BZ - 28 1.00 2.52 2.30 2.41 250.00 82.20 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 161.20 60.45
BZ - 28 @ BZ - 29 1.00 2.30 1.96 2.13 250.00 69.40 68.20 0.00 0.00 67.80 0.00 0.00 0.00 68.20 0.00 0.00 135.60 50.85
BZ - 29 @ BZ - 30 1.00 1.96 1.85 1.91 250.00 68.90 67.70 0.00 67.30 0.00 0.00 0.00 0.00 67.70 0.00 0.00 134.60 50.48

AVENIDA PRIMAVERA BZ - 27 @ BZ - 30 1.00 2.50 1.85 2.18 250.00 77.30 76.10 0.00 0.00 75.70 0.00 28.80 0.00 76.10 0.00 0.00 151.40 56.78

CALLE OCTUBRE BZ - 34 @ BZ - 35 1.00 2.80 2.67 2.74 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 35 @ BZ - 36 1.00 2.67 2.88 2.78 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 36 @ BZ - 37 1.00 2.88 2.92 2.90 355.00 68.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 37 @ BZ - 38 1.00 2.92 3.20 3.06 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 38 @ BZ - 39 1.00 3.20 3.40 3.30 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 39 @ BZ - 39' 1.00 3.40 3.60 3.50 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 39' @ BZ - 40 1.00 3.60 3.52 3.56 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 40 @ BZ - 41 1.00 3.52 3.03 3.28 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
CALLE LOMAS BZ - 41 @ BZ - 42 1.00 3.03 3.52 3.28 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 42 @ BZ - 43 1.00 3.52 2.89 3.21 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 43 @ BZ - 44 1.00 2.89 2.01 2.45 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00
BZ - 44 @ BZ - 45 1.00 2.01 2.00 2.01 355.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

736.51 575.51 0.00 67.30 459.21 0.00 144.00 0.00 212.00 0.00 317.71 1,121.62 420.61
.
Totales 736.51 575.51 0.00 67.30 459.21 0.00 144.00 0.00 212.00 0.00 317.71 1,121.62 420.61

Prueba Hidraulica : 307.71 Tapones para P.H : 10.00

Evacuacion de aguas servidas: 0.00

SEÑALIZACION 526.51 RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=1.50 - 2.00M

RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=2.00 - 2.50M 299.71


RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=2.50 - 3.00M

RELLENO ZANJA CON MATERIAL PROPIO, H=1.50 - 2.00M

RELLENO ZANJA CON MATERIAL PROPIO, H=2.00 - 2.50M 224.01


RELLENO ZANJA CON MATERIAL PROPIO, H=2.50 - 3.00M
MUNICIPALIDAD DE SUNAMPE

EXPEDIENTE TECNICO: " AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA AV. PARAISO, CALLE JOSE OLAYA, CALLE MIGUEL GRAU, AV. PRIMAVERA CC.PP LOMO
LARGO, CALLE 03 DE OCTUBRE CC.PP. SANTA FE, CALLE LAS LOMAS CCPPP. LA VICTORIA, CALLE LAS LOMAS

HOJA DE METRADOS REFERENCIALES DE BUZONES


FECHA: DEL 29 DE ENERO AL 24 DE FEBRERO DEL 2018 SUB CONTRATISTA P&M

Alt.Bz. Alt.Bz. DEMOLICION DE BUZON BUZON NUEVO


DESCRIPCION Buzon
Existente Nuevo
1.20 1.50 2.00 2.50 3.00 1.20 1.50 2.00 2.50 3.00

AVENIDA PARAISO BZ - 22 2.40


BZ - 23 2.50 2.52

CALLE GRAU BZ - 28 2.33 2.30 1.00 1.00


BZ - 29 1.89 1.96 1.00 1.00
BZ - 30 1.85 1.85 1.00 1.00

CALLE JOSE OLAYA BZ - 24 1.31 2.30 1.00 1.00


BZ - 25 1.83 2.20 1.00 1.00
BZ - 26 1.97 2.25 1.00 1.00
BZ - 27 2.57 2.50 1.00 1.00

BZ - 31 2.50 2.50 1.00 1.00


BZ - 32 2.50 2.50

BZ - 33 3.15 3.15
BZ - 34 2.80 2.80

CALLE DE OCTUBRE
BZ - 35 OBS. 3.15
BZ - 36' 2.80 1.00
BZ - 36 2.30 2.88 1.00
BZ - 37 2.47 2.92 1.00
BZ - 38 2.90 3.20
BZ - 39 2.90 3.40
BZ - 39' 3.15 3.60
BZ - 40 3.15 3.52
CALLE LAS LOMAS BZ - 41 2.90 3.03
BZ - 42 3.15 3.52
BZ - 43 2.89 2.89
BZ - 44 1.90 2.01
BZ - 45 OBS. 2.00

1.00 4.00 3.00 3.00 0.00 0.00 2.00 4.00 2.00 0.00
11.00 8.00

VOLUMEN DE DEMOLICION m3. 1.8588 8.49 7.686 9.0045 0 0 4.245 10.248 6.003 0
VOLUMEN TOTAL DE DEMOLICION DE BUZON m3. 27.04
TOTAL BUZONES NUEVOS INSITU Und. 8.00

BUZON ESTANDAR H=1.20 0.00


BUZON ESTANDAR H=1.50 2.00
BUZON ESTANDAR H=2.00 4.00
BUZON ESTANDAR H=2.50 2.00
BUZON ESTANDAR H=3.00 0.00 8.00

BUZON A DEMOLER H=1.20 1.00


BUZON A DEMOLER H=1.50 4.00
BUZON A DEMOLER H=2.00 3.00
BUZON A DEMOLER H=2.50 3.00
BUZON A DEMOLER H=3.00 0.00
11.00
PRIMAVERA CC.PP LOMO

DADOS DE
CONCRETO

2.00

3.00
2.00
2.00

2.00
4.00
2.00
3.00

2.00

22.00
0

EXPEDIENTE TECNICO: " AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y SANEAMIENTO EN LA AV. PARAISO, CALLE JOSE OLAYA, CALLE MIGUEL GRAU, AV. PRIMAVERA CC.PP LOMO LARGO, CALLE 03 DE OCTUBRE CC.PP. SANTA FE, CALLE LAS LOMAS
CCPPP. LA VICTORIA, CALLE LAS LOMAS

HOJA DE METRADOS REFERENCIALES CONEXIONES DOMICILIARIAS

FECHA 29 ENE AL 24 FEB. SUBCONTRATISTA P&M

CONEXIONES DOMICILIARIAS PARTIDAS


IDENTIFICACION DE
CONEXIÓN DOMICILIARIA DEMOLICION DE
DIAMETRO PROYECTADAS EXISTENTES EXCAVACION LONG.TUBERIA CORTE PAVIMENTO CORTE VEREDAS EMPALME DE CONEX. DOMICILIARIA A RED MATRIZ
DESCRIPCION BZ. Inicio @ BZ. Fin UND PAVIMENTO
LADO LADO LADO LADO LADO LADO LADO
160 160
DERECHO
LADO IZQ.
DERECHO
LADO IZQ.
DERECHO
LADO IZQ.
DERECHO
LADO IZQ.
DERECHO IZQ. DERECHO
LADO IZQ. 200 mm 250 mm 315 mm

AVENIDA PARAISO BZ - 22 @ BZ - 23 200.00 0.00

CALLE JOSE OLAYA BZ - 22 @ BZ - 24 355.00 0.00


1.00 D-01 3.80 4.30 3.00 0.79 1.65
1.00 D-02 3.60 4.00 3.00 0.79 1.65
BZ - 24 @ BZ - 25 355.00 0.00
1.00 D-01 4.15 4.75 3.60 0.79 1.98
1.00 D-02 4.15 4.75 3.60 0.79 1.98

BZ - 25 @ BZ - 26 355.00 0.00 2.00 8.00 D-02 D-01 3.37 3.83 3.93 4.55 2.60 2.97 0.79 0.79 1.43 1.63
D-03 D-06 3.50 3.20 4.05 3.60 2.80 2.97 0.79 0.79 1.54 1.63
D-04 D-10 3.66 3.20 4.40 3.60 2.90 2.97 0.79 0.79 1.60 1.63
D-05 3.75 4.55 3.15 0.79 1.73
D-07 3.90 4.55 3.15 0.79 1.73
D-08 4.00 4.55 3.15 0.79 1.73
D-09 4.10 4.55 3.15 0.79 1.73

BZ - 26 @ BZ - 27 355.00 0.00 6.00 5.00 D-01 D-02 4.15 2.90 4.55 3.30 3.20 2.10 0.79 0.79 1.76 1.16
D-11 D-03 3.90 2.90 4.30 3.30 3.05 2.10 0.79 0.79 1.68 1.16
D-10 D-04 3.98 3.10 4.38 3.50 3.03 2.30 0.79 0.79 1.67 1.27
D-09 D-05 4.00 3.23 4.30 3.63 2.95 2.40 0.79 0.79 1.62 1.32
D-08 D-06 3.86 3.25 4.26 3.65 2.90 2.40 0.79 0.79 1.60 1.32
D-07 3.25 3.65 2.45 0.79 1.35
BZ - 27 @ BZ - 31 355.00 0.00
BZ - 31 @ BZ - 32 355.00 0.00
BZ - 32 @ BZ - 33 355.00 0.00
BZ - 33 @ BZ - 34 355.00 0.00

CALLE GRAU BZ - 23 @ BZ - 28 250.00 0.00

BZ - 28 @ BZ - 29 250.00 0.00 7.00 13.00 D-20 D-01 2.80 6.00 3.55 6.75 1.30 4.30 0.79 0.79 0.72 2.37 20.00
D-19 D-02 2.80 5.65 3.55 6.40 1.30 4.30 0.79 0.79 0.72 2.37
D-18 D-03 3.15 5.35 3.90 6.10 1.60 3.50 0.79 0.79 0.88 1.93
D-17 D-04 3.35 5.00 4.10 5.75 1.85 3.50 0.79 0.79 1.02 1.93
D-16 D-05 3.60 5.00 3.95 5.75 1.85 3.15 0.79 0.79 1.02 1.73
D-15 D-06 3.75 5.00 4.15 5.75 1.85 2.90 0.79 0.79 1.02 1.60
D-14 D-07 3.75 4.45 4.15 5.20 2.40 2.76 0.79 0.79 1.32 1.52
D-13 D-08 4.15 4.30 4.40 5.00 2.40 2.76 0.79 0.79 1.32 1.52
D-12 D-09 4.15 4.30 4.40 5.00 2.40 2.76 0.79 0.79 1.32 1.52
D-11 D-10 4.15 4.30 4.40 5.20 2.40 2.76 0.79 0.79 1.32 1.52

BZ - 29 @ BZ - 30 250.00 0.00 6.00 6.00 D-06 D-01 3.95 4.00 4.65 4.75 2.90 1.95 0.79 0.79 1.60 1.07 12.00
D-07 D-02 3.95 4.00 4.65 4.75 2.90 2.55 0.79 0.79 1.60 1.40
D-08 D-03 4.00 4.10 4.50 4.85 2.80 2.70 0.79 0.79 1.54 1.49
D-09 D-04 4.00 4.30 4.50 5.20 2.80 2.70 0.79 0.79 1.54 1.49
D-10 D-05 4.35 4.30 5.10 5.20 2.80 2.70 0.79 0.79 1.54 1.49
FECHA 29 ENE AL 24 FEB. SUBCONTRATISTA P&M

CONEXIONES DOMICILIARIAS PARTIDAS


IDENTIFICACION DE
CONEXIÓN
D-11 DOMICILIARIA 4.35 5.10 2.80 0.79 1.54
DESCRIPCION BZ. Inicio @ BZ. Fin UND D-12 4.30 5.05 2.80 0.79 1.54

AVENIDA PRIMAVERA BZ - 30 @ BZ - 27 250.00 0.00 3.00 13.00 D-16 D-01 3.00 4.43 3.45 6.00 2.05 1.75 0.79 0.79 1.13 0.96 16.00
FECHA 29 ENE AL 24 FEB. SUBCONTRATISTA P&M

CONEXIONES DOMICILIARIAS PARTIDAS


IDENTIFICACION DE
CONEXIÓN
D-15 DOMICILIARIA
D-02 3.00 4.33 3.45 5.90 2.05 1.75 0.79 0.79 1.13 0.96
DESCRIPCION BZ. Inicio @ BZ. Fin UND D-14 D-03 2.90 4.33 3.35 5.90 2.05 1.75 0.79 0.79 1.13 0.96
D-13 D-04 2.90 4.23 3.35 5.80 2.05 2.10 0.79 0.79 1.13 1.16
D-12 D-05 3.60 4.03 4.05 5.60 2.06 1.80 0.79 0.79 1.13 0.99
D-11 D-06 3.60 4.03 4.05 5.60 2.05 1.85 0.79 0.79 1.13 1.02
D-10 D-07 4.05 3.73 4.37 5.30 2.05 1.75 0.79 0.79 1.13 0.96
D-09 4.05 4.37 2.00 0.79 1.10
D-08 4.05 4.37 2.00 0.79 1.10

CALLE OCTUBRE BZ - 34 @ BZ - 35 355.00 0.00


BZ - 35 @ BZ - 36 355.00 0.00
BZ - 36 @ BZ - 37 355.00 0.00
BZ - 37 @ BZ - 38 355.00 0.00
BZ - 38 @ BZ - 39 355.00 0.00
BZ - 39 @ BZ - 40 355.00 0.00
BZ - 40 @ BZ - 41 355.00 0.00

CALLE LOMAS BZ - 41 @ BZ - 42 355.00 0.00


BZ - 42 @ BZ - 43 355.00 0.00
BZ - 43 @ BZ - 44 355.00 0.00
BZ - 44 @ BZ - 45 355.00 0.00
27.00 46.00 141.87 143.72 161.28 172.33 187.08 187.80 30.02 27.65 28.30 28.40 0.00 48.00 0.00

TOTAL 27.00 46.00 285.59 333.61 374.88 57.67 56.70 0.00 48.00 0.00

DADOS DE CONCRETO PARA EMPALME DE DOMICILIARIA: 25.00 EXC.DMC LONG TUB CORTE P DML.P
25.00 285.59 333.61 374.88 56.70
EMPALME DE 355 25.00
EMPALME DE 315 0.00
EMPALME DE 250 48.00
EMPALME DE 200 0.00

PR EX
Para manuel y pavel : 27.00 46.00
SUBCONTRATISTA P&M

PARTIDAS

EMPALME DE CONEX. DOMICILIARIA A RED MATRIZ

355 mm

2.00

2.00

10.00

11.00
SUBCONTRATISTA P&M

PARTIDAS
SUBCONTRATISTA P&M

PARTIDAS

25.00

25.00

UND EMPALME
73.00
#REF!

#REF!

HOJA DE RESUMEN DE METRADO ARQUEOLOGICO, AMBIENTAL, SEGURIDAD Y SALUD


FECHA: ABRIL 2016
SUB PROYECTO : REDES DE ALCANTARILLADO CONSORCIO DOS TORRES

ITEM DESCRIPCION UND TOTAL


SUBCONTRATISTA P&M

02 REDES Y CONEXIONES DE ALCANTARILLADO METRADO


02.01 RED MATRIZ DE DESAGUE
02.01.01 OBRAS PROVISIONALES
02.01.01.01 FLETE TERRESTRE DE ALCANTARILLADO GLB 0.00
02.01.02 TRABAJOS PRELIMINARES
02.01.02.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m 736.51
02.01.02.02 REPLANTEO FINAL DE LA OBRA , PARA LINEA DE REDES m 0.00
02.01.02.03 SEGURIDAD Y HIGIENE OCUPACIONAL - REDES Y CONEXIONES DE ALCANTARILLADO ml 526.51 Señalizacion
02.01.02.04 EVACUACION AGUA SERVIDAS (CONTIGENCIA) m 0.00
02.01.03 MOVIMIENTO DE TIERRAS
02.01.03.01 EXCAVACION DE ZANJA H=1.20 - 1.50 M CON MAQUINARIA m 0.00
02.01.03.02 EXCAVACION DE ZANJA H=1.50 - 2.00 M CON MAQUINARIA m 67.30
02.01.03.03 EXCAVACION DE ZANJA H=2.00 - 2.50 M CON MAQUINARIA m 459.21
02.01.03.04 EXCAVACION DE ZANJA H=2.50 - 3.00 M CON MAQUINARIA m 0.00
02.01.03.05 ENTIBADO DE ZANJAS DE H=2.00 - 3.00 M m2 144.00
02.01.03.06 REFINE Y NIVELACION DE ZANJA PARA TUBERIA H=1.20 - 1.50M m 0.00
02.01.03.07 REFINE Y NIVELACION DE ZANJA PARA TUBERIA H=1.50 - 2.00M m 67.30
02.01.03.08 REFINE Y NIVELACION DE ZANJA PARA TUBERIA H=2.00 - 2.50M m 459.21
02.01.03.09 REFINE Y NIVELACION DE ZANJA PARA TUBERIA H=2.50 - 3.00M m 0.00
02.01.03.10 RETIRO DE TUBERIA DE ALCANTARILLADO EXISTENTE m 575.51
02.01.03.11 CAMA DE APOYO C/ARENA SARANDEADA PARA H:1.20 - 1.50 M m 0.00
02.01.03.12 CAMA DE APOYO C/ARENA PARA H:1.50 - 2.00 M m 67.30
02.01.03.13 CAMA DE APOYO C/ARENA PARA H:2.00 - 2.50 M m 459.21
02.01.03.14 CAMA DE APOYO C/ARENA PARA H:2.50 - 3.00 M m 0.00
02.01.03.15 RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=1.20 - 1.50M m 0.00
02.01.03.16 RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=1.50 - 2.00M m 0.00
02.01.03.17 RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=2.00 - 2.50M m 299.71
02.01.03.18 RELLENO SOBRE CLAVE DEL TUBO DE ZANJAS H=2.50 - 3.00M m 0.00
02.01.03.19 RELLENO ZANJA CON MATERIAL PROPIO, H=1.20 - 1.50M m 0.00
02.01.03.20 RELLENO ZANJA CON MATERIAL PROPIO, H=1.50 - 2.00M m 0.00
02.01.03.21 RELLENO ZANJA CON MATERIAL PROPIO, H=2.00 - 2.50M m 224.01
02.01.03.22 RELLENO ZANJA CON MATERIAL PROPIO, H=2.50 - 3.00M m 0.00
02.01.03.23 ACARREO MATERIAL EXCEDENTE m3 303.31 0.6605
02.01.03.24 ELIMINACION DE MATERIAL EXCEDENTE m3 303.31
02.01.04 SUMINISTRO E INSTALACION DE TUBERIAS PVC-UF ISO 4435
02.01.04.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF S-20 NTP ISO 4435 D=355 MM m 317.71
02.01.04.02 SUMINISTRO E INSTALACION DE TUBERIA PVC UF S-20 NTP ISO 4435 D=315 MM m 0.00
02.01.04.03 SUMINISTRO E INSTALACION DE TUBERIA PVC UF S-20 NTP ISO 4435 D=250 MM m 212.00
02.01.04.04 SUMINISTRO E INSTALACION DE TUBERIA PVC UF S-20 NTP ISO 4435 D=200 MM m 0.00
02.01.04.05 PRUEBA HIDRAULICA m 307.71
02.01.04.06 TAPON DE CONCRETO PARA PRUEBA HIDRAULICA und 10.00
02.01.05 CONSTRUCCION DE BUZONES
02.01.05.01 DEMOLICION DE BUZON EN MAL ESTADO HASTA H:1.20 PROFUNDIDA und 1.00
02.01.05.02 DEMOLICION DE BUZON EN MAL ESTADO HASTA H:1.50 PROFUNDIDA und 4.00
02.01.05.03 DEMOLICION DE BUZON EN MAL ESTADO HASTA H:2.00 PROFUNDIDA und 3.00
02.01.05.04 DEMOLICION DE BUZON EN MAL ESTADO HASTA H:2.50 PROFUNDIDA und 3.00
02.01.05.05 DEMOLICION DE BUZON EN MAL ESTADO HASTA H:3.00 PROFUNDIDA und 0.00
02.01.05.06 EXCAVACION PARA BUZONES EN TERRENO NORMAL m3 0.00
02.01.05.07 ACARREO MATERIAL EXCEDENTE m3 32.45 32.45
02.01.05.08 ELIMINACION DE MATERIAL EXCEDENTE m3 32.45
02.01.05.09 BUZON ESTANDAR D=1.2 M H=1.20 M PROF. E=0.20M und 0.00
02.01.05.10 BUZON ESTANDAR D=1.2 M H=1.50 M PROF. E=0.20M und 2.00
02.01.05.11 BUZON ESTANDAR D=1.2 M H=2.00 M PROF. E=0.20M und 4.00
02.01.05.12 BUZON ESTANDAR D=1.2 M H=2.50 M PROF. E=0.20M und 2.00
02.01.05.13 BUZON ESTANDAR D=1.2 M H=3.00 M PROF. E=0.20M und 0.00
02.01.05.14 DADO DE CONCRETO PARA EMPALME TUBERIA-BUZÓN und 22.00
02.01.06 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTOS EN RED DE ALCANTARILLADO
02.01.06.01 CORTE DE PAVIMENTO FLEXIBLE DE e=2" m 1121.62
02.01.06.02 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 420.61
02.01.06.03 REFINE SUBRASANTE m 0.00
02.01.06.04 BASE DE AFIRMADO PARA PISTAS Y VEREDAS m2 0.00
02.01.06.05 IMPRIMACION ASFALTICA m2 0.00
02.01.06.06 REPOSICION DE PAVIMENTO FLEXIBLE ASFALTO EN CALIENTE DE e=2" m2 0.00
02.02 CONEXIONES DOMICILIARIAS DE DESAGUE
02.02.01 OBRAS PRELIMINARES
02.02.01.01 TRAZO, NIVELACION Y REPLANTEO DE OBRA m 285.59
02.02.01.02 CINTA PLÁSTICA SEÑALIZADORA PARA LIMITE DE SEGUIMIENTO DE OBRA m 0.00
02.02.01.03 PUENTE DE MADERA PARA PASE PEATONAL und 4.00
02.02.02 MOVIMIENTO DE TIERRAS
02.02.02.01 EXCAVACION DE ZANJA HASTA 1.50M. DESAGUE (CONX.DOMICILIARIA) m 285.59 285.59
02.02.02.02 REFINE Y NIVELACION DE ZANJA PARA TUBERIA m 285.59
02.02.02.03 CAMA DE APOYO PARA TUBERIA CON ARENA hprom=0.10M m 285.59
02.02.02.04 RELLENO SOBRE CLAVE DEL TUBO m 150.99
02.02.02.05 RELLENO Y COMP. C/ MAT. PROPIO EN ZANJAS m 87.63
02.02.02.06 ACARREO MATERIAL EXCEDENTE m3 84.82 0.2970
02.02.02.07 ELIMINACION DE MATERIAL EXCEDENTE m3 84.82
02.02.03 SUMINISTRO E INSTALACION DE TUBERIAS
02.02.03.01 SUMINISTRO E INSTALACION DE TUBERIA PVC UF 160MM DESAGUE m 333.61
02.02.03.02 EMPALME DE CONEX. DOMIC. A LA RED MATRIZ DE D=200MM und 0.00
02.02.03.03 EMPALME DE CONEX. DOMIC. A LA RED MATRIZ DE D=250MM und 48.00
02.02.03.04 EMPALME DE CONEX. DOMIC. A LA RED MATRIZ DE D=315MM und 0.00
02.02.03.05 EMPALME DE CONEX. DOMIC. A LA RED MATRIZ DE D=355MM und 25.00
02.02.03.06 DADO DE CONCRETO PARA EMPALME TUBERIA CAJA DOMICILIARIA und 73.00 73.00
02.02.03.07 PRUEBA HIDRAULICA PARA DESAGUE CONEXIONES DOMICILIARIAS m 177.86
02.02.03.08 REPOSICION DE TAPA Y CAJA DE DESAGUE und 46.00
02.02.03.09 INSTALACION DE TAPA Y CAJA DE DESAGUE und 27.00
02.02.03.10 TAPON DE CONCRETO PARA PRUEBA HIDRAULICA und 0.00
02.02.03.11 RETIRO DE TUBERIA EXISTENTE DE CONEX. DOMICILIARIAS m 121.98
02.02.03.12 LIMPIEZA FINAL m2 166.81
02.02.04 CORTE, DEMOLICION Y REPOSICION DE PAVIMENTOS EN RED DE CONEX. DOMICILIARIA.
02.02.04.01 CORTE DE PAVIMENTO FLEXIBLE DE e=2" m 374.88
02.02.04.02 DEMOLICION DE PAVIMENTO ASFALTICO DE 2" m2 56.70
02.02.04.03 REFINE SUBRASANTE m 0.00
02.02.04.04 BASE DE AFIRMADO PARA PISTAS Y VEREDAS m2 0.00
02.02.04.05 IMPRIMACION ASFALTICA m2 0.00
02.02.04.06 REPOSICION DE PAVIMENTO FLEXIBLE ASFALTO EN CALIENTE DE e=2" m2 0.00
02.02.04.07 ACARREO MATERIAL EXCEDENTE m3 111.34 0.297
02.02.04.08 ELIMINACION DE MATERIAL EXCEDENTE m3 111.34
03 VARIOS
03.01 EDUCACION SANITARIA
03.01.01 EDUCACION SANITARIA GLB 0.00
03.02 MITIGACION AMBIENTAL
03.02.01 MITIGACION AMBIENTAL GLB 0.00
PRESUPUESTO MANO DE OBRA SUNAMPE

DESAGUE SUNAMPE TOTAL


N° METRADO
DESCRIPCION UND. P.U PARCIAL

TRAZO Y REPLANTEO, PERFILADO, CAMA DE ARENA, ENTUBADO, RECUBRIMIENTO, TUBERIA,


1
RELLENO, COMPACTADO A NIVEL DE PISTA
M 736.51
2 RETIRO DE TUBERIA RED MATRIZ EXISTENTE M 575.51
3 EMPALME RED EXISTENTE INCLUYE ACCESORIOS Y DADOS UND. 73.00
4 BUZONETA UND.
5 BUZON H <= 1.4 ml NUEVOS (INCLUYE MEDIA CAÑA) UND.
6 BUZON H = 1.4 - 2.6 ml NUEVOS (INCLUYE MEDIA CAÑA) UND.
7 BUZON H = 2.6 - 3.8 ml NUEVOS (INCLUYE MEDIA CAÑA) UND.
8 BUZON H >= 3.8 ml NUEVOS (INCLUYE MEDIA CAÑA) UND.
9 DEMOLICION DE BUZON CON MAQUINA (RETROEXCAVADORA) UND. 11.00
10 DEMOLICION DE BUZON SIN MAQUINA (SIN RETRO) UND.
11 DADO DE CONCRETO ENTRE BUZON Y TUBERIA UND.
12 PRUEBA HIDRAULICA RED MATRIZY CONEX. DOMICILIARIAS M
13 CONEXIONES DOMICILIARIAS HASTA 6 ML INCLUYE CORTE + DEM + REP DE VEREDA UND.
14 CORTE Y ROTURA DE PAVIMENTO FLEXIBLE (SIN MAQUINA) M
15 CORTE Y ROTURA DE PAVIMENTO RIGIDO (SIN MAQUINA) M
16 CORTE, DEMOLICION Y CAMBIO CAJAS DESAGUE + REP. VEREDA UND.
TOTAL S/. -