Construction: A Dynamic Industry
Introduction to the Topic:
CONSTRUCTION INDUSTRY
Building Construction
Residential Buildings
Commercial Buildings
Civil Buildings
Educational Buildings
Religious Buildings
Agricultural Buildings
Heavy or Infrastructure Construction
Highways
Bridges
Canals
Dams
Subways
Tunnels
Utility Piping System
Water Control Construction
Communication networks
Industrial Construction
PRE-CONSTRUCTION ACTIVITIES
Owners, both private and public, plan buildings, and other construction projects
to accommodate desired functional and spatial requirements.
Planning, designing, and completing construction of a large building project is a
complicated undertaking.
A vast array of planning decisions must be made at the onset of any
construction project.
Owners most often procure the services on architect/engineering/contracting
firm to help in the development of project definition, feasibility, referred to as the
pre- design phase.
The design of a building involves the utilization of space and all the factors that
go with it.
This includes physical requirements, psychological requirements that reflects the
attitudes and behavior of those using the space, and the need for those in the
building to carry out the activities expected to occur in the building.
In some cases, the project team may be required to create a scope of work that
involves new sidewalk, curbs and gutters, or street lightning.
Once the architect has been identified, the pre-design portion of the work can
begin.
In this phase, other design consultant and the owner mutually determine the
goals and objectives of the project.
Design sketches and feasibility studies are develop as a series of alternatives for
approval by the owner.
Early design efforts focus on establishing what is known as the design intent.
Design intent is a statement that defines the anticipated aesthetics, functional,
and performance characteristic of the finish building or project.
It identifies potential problems/ pitfalls, code and planning requirements,
community concerns, functions/ usage, lifestyle trends and image building
The result of pre-design work will be a written program. A program is a written
document that explain design intensions, control, and standards for a project,
including detailed space requirements and the types of equipment and the
systems to be used.
This phase is complete when the owner and architect agree that the scope of
work, anticipated construction cost and time schedule are well defined.
During the design development, initial design ideas are further elaborated into
detailed drawing of the building indicating exact sizes and relationships between
building elements
Architects use a system of orthographic drawing of a building or structure to
simplify the graphic understanding of complex forms.
The floor plan is representation of building viewed from above after a horizontal
plane has been cut through it and the portion removed.
A building section gives a view of a building after a vertical plane has been cut
through it and the front portion is removed.
An elevation drawing shows the exterior façade of a building, delineating
geometries and the materials of construction.
Because of multitude of systems under consideration at this stage, the architect
will normally hire the services of the other design consultant in the development
of the system.
Structural, mechanical, electrical, plumbing, and civil engineering, fire protection
consultant, interior and landscape designers and cost estimating consultants are
common on most projects of large scale.
Depending on the type of building being designed, other specialty consultants,
such as traffic and parking professionals, lighting designers, or acoustical
specialists, may be brought in to work with the team.
If a contractor for the project has been selected it is advisable to include the in
the development of solutions for constructability and other technical aspects of
the construction.
Once all the basic decisions have been approved by the owner, the architect and
all consultants will commence with the final phase the construction document.
This CD consist of two interdependent components:
Construction Drawings
Construction Specifications
Divisions:
CONSTRUCTION CONTRACTORS
GENERAL CONTRACTORS
SUPERINTENDENT
SUBCONTRACTORS
Who perform the required work within their technical areas, such as all the
electrical, plumbing, roofing, bricklaying, carpentry or concrete
Work independently on site, bringing their own employees, supervisors,
and tools for the job
SPECIALTY CONTRACTORS
CONSTRUCTION MANAGEMENT
The owner may hire a construction manager to provide input during the
design phase and oversight and administration of bidding and
construction phase.
DESIGN-BID-BUILD
DESIGN-BUILD
In this contracting method, the owner contracts with a single party that
completes all portions of the work from design through construction.
This contract tends to produce shorter overall project schedules.
CONSTRUCTION METHOD
List of agreement
- Scope of Work
- Safety Requirement
- Due Date (Duration)
- Worker Insurance
- Property Insurance
- Additional Payment
- Disclosure Agreement
Construction scheduling
Permitting
“MUST” on permitting
- Once a building permit has been secured and the contract between
the contractor and owner is signed, the actual on-site construction can
begin
- Requirements for temporary facilities are outlined in division 01 of the
contract document.
- Field offices are often housed in mobile trailers that are fully furnished
and provided with modern communication equipment.
- Temporary utilities must be brought to the site to provide the power
and sanitation required by worker and equipment.
- Many municipalities have instituted construction and demolition
recycling ordinances requiring construction sites to recycle a
percentage of waste that is generated. Materials such as wood,
aluminum, steel, bricks, and tile, and packaging material can easily be
recycled in today’s expanding recycled materials market.
- A pre-construction conference, attended by the owner, architect,
general contractor or construction manager, and invited subcontractors
is held to communicate the ongoing management procedures of the
project.
Construction Observation
- A contractor could ask for instance for more information on the details of an
interior finish application.
Change Order
The practice of project close-out finalizes all project activities completed across all
phases of the project to formally close the project and transfer the completed or
cancelled project as appropriate.
- Ensure completion
When the contractor determines that the work is nearing completion, the
architect or construction manager is asked to return to the site and
conduct an inspection of substantial completion.
2. ASSESSMENT
3. INSPECTION
4. CERTIFICATION
CONSTRUCTION SAFETY
Here are some links that might be useful for your studies:
types-construction/)
Building Construction
(https://civiconcepts.com/2019/08/building-construction-
step-by-step-process/)
Problem (https://tip.instructure.com/courses/18788/discussion_topics/286614)
If you will be having your own company being the General Contractor, for you, is it
better to have subcontractors or not?
Summary:
CONSTRUCTION INDUSTRY
Building Construction
Heavy or Infrastructure Construction
Industrial Construction
PRE-CONSTRUCTION ACTIVITIES
Construction Drawings
Construction Specifications
CONSTRUCTION CONTRACTORS
GENERAL CONTRACTORS
SUPERINTENDENT
SUBCONTRACTORS
SPECIALTY CONTRACTORS
COMPETITIVE BIDDING
INVITATIONAL BIDDING
NEGOTIATED CONTRACT
CONSTRUCTION MANAGEMENT
DESIGN-BID-BUILD
DESIGN-BUILD
CONSTRUCTION METHOD
List of agreement
Construction scheduling
Permitting
Construction Observation
Change Order
1. CONSULTATION
2. ASSESSMENT
3. INSPECTION
4. CERTIFICATION
CONSTRUCTION SAFETY
Reference: