0% found this document useful (0 votes)
333 views

Of Door Of Door: Pdf 檔案使用 "Pdffactory Pro" 試用版本建立

The document lists 6 works that must be carried out by others as they are not included in the elevator installation work. These include: 1) construction of the elevator shaft, pit, and machine room enclosure with sufficient strength; 2) construction of a waterproof elevator pit capable of supporting loads in the shop drawings; 3) construction of structural openings at each landing; 4) grouting and finishing after installation; 5) installation of a hoisting beam or hook capable of hoisting loads in the shop drawings; and 6) provision of definitive or temporary electricity connection and protection panel according to the single phase 230VAC diagram for the elevator.

Uploaded by

Mico France
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
333 views

Of Door Of Door: Pdf 檔案使用 "Pdffactory Pro" 試用版本建立

The document lists 6 works that must be carried out by others as they are not included in the elevator installation work. These include: 1) construction of the elevator shaft, pit, and machine room enclosure with sufficient strength; 2) construction of a waterproof elevator pit capable of supporting loads in the shop drawings; 3) construction of structural openings at each landing; 4) grouting and finishing after installation; 5) installation of a hoisting beam or hook capable of hoisting loads in the shop drawings; and 6) provision of definitive or temporary electricity connection and protection panel according to the single phase 230VAC diagram for the elevator.

Uploaded by

Mico France
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

WORKS TO BE CARRIED OUT BY OTHERS

LISTED BELOW ARE THE WORKS THAT TO BE CARRIED OUT BY OTHERS AS THE SAME ARE NOT
INCLUDED IN THE INSTALLATION WORK OF AN ELEVATOR.
1、THE WHOLE ENCLOSURE OF ELEVATOR SHAFT, PIT AND MACHINE ROOM MUST BE
CONSTRUCTED WITH SUFFICIENT STRENGTH TO PROVIDE ADEQUATE SUPPORT TO MACHINE
BEAM, GUIDE RAIL BRACKETS AND ENTRANCE EQUIPMENT INSTALLATION.
2、CONSTRUCTION OF ELEVATOR PIT SHALL BE WATERPROOFED AND CAPABLE TO TAKE THE
LOAD MENTIONED IN THE SHOP DRAWING.
3、CONSTRUCTION OF STRUCTURAL OPENING TO REQUIREMENT AT EACH LANDING FOR LANDING
2-HOISTING HOOK LOADS DOOR INSTALLATION AND OPENING FOR HALL CALL BUTTON CASING.
UP TO A MINIMUM OF 2-HOISTING HOOK LOADS 4、GROUTING AND FINISHING WORKS AROUND LANDING ENTRANCE AND PUSH BUTTON CASING
3000KG (BY OTHERS) UP TO A MINIMUM OF AFTER THE INSTALLATION WORKS.
A A 3000KG (BY OTHERS) 5、INSTALLATION OF HOISTING BEAM OR HOISTING HOOK IN THE TOP OF HOISTWAY CAPABLE
OF CWT RAIL OF GOV OF CWT RAIL
OF CAR OF GOV OF CAR OF HOISTING THE LOAD MENTIONED IN THE SHOP DRAWING.
1306 944 944 1306 6、DEFINITIVE OR PROVISIONAL ELECTRICITY CONNECTION WITH ITS CORRESPONDING
266 1040 830 114 114 830 1040 266 PROTECTION PANEL ACCORDING TO DIAGRAM OF SINGLE PHASE 230VAC FOR ELEVATOR
DETAIL IV HOISTWAY LIGHTING AND 3 PHASES 230VAC, NEUTRAL, EARTHED AND WITH SUFFICIENT
DETAIL IV POWER FOR THE INSTALLATION, TESTING AND COMMISSIONING OF THE ELEVATOR IN
ACCORDANCE WITH THE LOW VOLTAGE ELECTRICITY REGULATIONS.
7、PROVISION OF DISTRIBUTION BOARD NEAR TO THE CONTROL PANEL FOR THE POWER
SUPPLY TO THE ELEVATOR AND THE ELEVATOR HOISTWAY.
590

590
616

616
100×200 I BEAM
(BY OTHERS) 8、TO PROVIDE ALL SIGNAGE IN THE ELEVATOR LOBBY AND DISTRIBUTION BOARD AND
1108

1108
OTHERS.
500

500

HOISTING HOOK LOADS


915 9、THERE WILL BE NO OTHER EQUIPMENT, PIPING, DUCTING OR ANY WORKS NOT CONCERNING
62 860 D.B.G. 62

UP TO A MINIMUM OF 200 200


1315
2500 SHAFT PROVIDED

2500 SHAFT PROVIDED


1450 1450 WITH THE ELEVATOR ARE ALLOWED IN THE ELEVATOR PIT, HOISTWAY.
3000KG (BY OTHERS)
1585

62 860 D.B.G.62
166 166

1585
OF CWT
995

995
VENTILATION FAN OF CWT
STABILIZER

400 61 61 400
400

400
400 400
1600

1600

STABILIZER
(BY OTHERS)
OVERHEAD 4500

128 128
477

68 128 128 68

477
30 30
95

95
200

200
105

105
L.SW L.SW
90

90
47

47
15

15
240 210

240 210
I.SW I.SW
62 1600 D.B.G. 62 62 1600 D.B.G. 62
CONTROL
1392

GOV

GOV
1315

1315
PANEL

178

PANEL
CONTROL
82 82

1392
785

785
178
915

915
900

900
444 444
50 C.O.P T.C T.C C.O.P 50

90

90
30 R.C

30 R.C
OF DOOR

OF DOOR
60

60
130

130
100
100 200X100 OP`NG
P FLR(TOP FLR) 200X100 OP`NG
FOR CABLE FOR CABLE REV.NO. AMENDMENTS DATE CHKD
900 DOOR 900 DOOR
DETAIL II
VENTILATION FAN 706 1100 STRUCT.OP'NG 444 444 1100 STRUCT.OP'NG 706 SPECIFICATION & DATA
(BY OTHERS) 326 930 930 64 64 930 930 326
1306 944 944 1306 NO.OF LIFT TWO UNITS
2250 2250 TYPE OF LIFT FUJI BRAND MACHINE ROOMLESS PASSENGER LIFT
4600 SHAFT PROVIDED MODEL FSRL15(1000KG)-2CO105-10:10:10
A HALL BUTTON A HALL BUTTON LOAD 1000Kg/15PERSONS
TOP FLR HOISTWAY PLAN SCALE 1:25 SPEED 1.75m/s(105MPM)
CONTROL AC VARIABLE VOLTAGE VARIABLE FREQUENCY(AC-VVVF)
OPERATION DUPLEX SELECTIVE COLLECTIVE
FLRS/STOPS/DRS 10/10/10{B,G,2,3,4,5,6,7,8,P}
TRAVEL 32350mm
SPACING FOR GUIDERAIL BRACKETS

CAR SIZE 1450mm(W)×1600mm(D)×2400mm(H)


HOISTWAY SPACING FOR LIGHING

ENTRANCE 900mm(W)×2100mm(H)
8 FLR 3500mm A A DOOR OPERATION 2 PANELS AUTOMATIC CENTER OPENING
7 FLR 3500mm OF CWT RAIL OF GOV OF CWT RAIL
OF CAR
2400×15+1800=37800

OF CAR
5330×6+5320=37300

6 FLR 3500mm OF GOV TRACTION MACHINE WYJ103-02.3


5 FLR 3500mm 1306 944 944 1306
4 FLR 3500mm 266 1040 830 114 114 830 1040 266 φOF MAIN SHEAVE 400mm
3 FLR 3500mm MAIN ROPE 6×φ10 ROPING 2:1
2 FLR 4000mm
FLOORING GRANITE TILES
2,3,4,5,6,7,8 FLR
TOTAL HT.38300

TRAVEL 32350

CAR RAIL 13Kg/m


CWT RAIL 13Kg/m

590

590
CAR. BUFFER OIL

616

616
100×200 I BEAM
(BY OTHERS) CWT. BUFFER OIL

1108

1108
MOTOR CAPACITY 11.7KW

62 860 D.B.G. 62
200 200 MAIN 3PH,230V 60HZ

2500 SHAFT PROVIDED

2500 SHAFT PROVIDED


1450 1450 POWER SUPPLY

1585

62 860 D.B.G.62
166 166 LIGHT 1PH,230V 60HZ
4000

1585
OF CWT GOVERNOR φ8mm×1

995

995
OF CWT
400 61 61 400

400

400
400 400

1600

1600
128 128

477
68 128 128 68

477
30 30 HOISTWAY INTERNAL DIMENSIONS SHOWN ARE MINIMUM FOR SPECIFIED CAR

95

95
200

200
SIZE. TOLERANCE OF HOISTWAY SIZE SHALL BE KEPT WITHIN 30 MM FOR

105
105
L.SW L.SW

90

90
47

47
15

15
ALL HEIGHT OF HOISTWAY.

240 210

240 210
I.SW I.SW
62 1600 D.B.G. 62 62 1600 D.B.G. 62

1392

GOV

GOV
G FLR 178 82 82

1392
785

785
178

915

915
900

900
444 444 APPROVALS
50 C.O.P T.C T.C C.O.P 50

90

90
30 R.C

30 R.C
OF DOOR

OF DOOR
60

60
130

130
SIGNED

100
100
2200 STRUCT.OP'NG
3350

2100 DOOR HT.

EMERGENCY STOP
900 DOOR 900 DOOR DATE
SWITCH & 10A 706 1100 STRUCT.OP'NG 444 444 1100 STRUCT.OP'NG 706
LIGHTING SWITCH 326 930 930 64 64 930 930 326
1306 944 944 1306 CUSTOMER:
1200 2250 2250

PDF 檔案使用 "pdfFactory Pro" 試用版本建立 www.pdffactory.com


4600 SHAFT PROVIDED LOCATION: PHILIPPINES
B FLR A HALL BUTTON A HALL BUTTON PROJECT:NFA Central Office Building
15A SW.SOCKET OUTLET

285 600 200


OTHER FLRS HOISTWAY PLAN SCALE 1:25
1450 PIT

& 10A LIGHTING POWERLIFT ELEVATOR & ESCALATOR CORP.

600 200
MS.CAT LADDER
EMERGENCY STOP Address: 21 Lancer Street, Village East Executive Homes Cainta,

500
SWITCH Rizal, Philippines
OIL BUFFER
WATERPROOF PIT R1 R2
915 477 1108 APPD BY UNIT:MM
(BY OTHERS) R1 7050Kg LEGEND:
2500 SHAFT PROVIDED TITLE: MACHINE ROOMLESS PASSENGER LIFT
R2 5450Kg C.O.P.-- CAR OPERATING PANEL
SECTION A-A SCALE 1:50 GOV. -- GOVERNOR HOISTWAY PLAN,DOOR ELEVATION ,
CWT. -- COUNTERWEIGHT CHKD BY SCALE:AS SHOWN DOOR STRUCT.OP'NG,MACHINE ROOM PLAN,
T.C. -- TRAVELLING CABLE MACHINE ROOM SLAB OP`NG,HALL BUTTON,
I.SW -- INDUCATOR SWITCH SECTION A-A.
L.SW -- LIMIT SWITCH
DBG. -- DISTANCE BETWEEN GUIDERAIL
DRWN BY DATE:
R.C. -- RUNNING CLEARANCE/
REINFORCE CONCRETE
DWG NO FSRL