100% found this document useful (10 votes)
4K views2 pages

Annex B. Report On The Quarter National Simultaneous Earthquake Drill (Nsed)

This document is a report on the 2nd Quarter National Simultaneous Earthquake Drill conducted on June 10, 2021 at Faigal Elementary School in Nueva Ecija, Philippines. It provides details on the school's coordination with local disaster risk reduction management offices, an orientation held for students and staff on earthquake preparedness, and the participation of 8 staff members and 0 students in practicing "duck, cover, and hold" during the drill. Issues noted included a lack of communication equipment and early warning systems, limited first aid kits and rescue equipment, and non-compliance with COVID protocols. The school's DRRM coordinator and principal approved the report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
100% found this document useful (10 votes)
4K views2 pages

Annex B. Report On The Quarter National Simultaneous Earthquake Drill (Nsed)

This document is a report on the 2nd Quarter National Simultaneous Earthquake Drill conducted on June 10, 2021 at Faigal Elementary School in Nueva Ecija, Philippines. It provides details on the school's coordination with local disaster risk reduction management offices, an orientation held for students and staff on earthquake preparedness, and the participation of 8 staff members and 0 students in practicing "duck, cover, and hold" during the drill. Issues noted included a lack of communication equipment and early warning systems, limited first aid kits and rescue equipment, and non-compliance with COVID protocols. The school's DRRM coordinator and principal approved the report.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

DEPARTMENT OF EDUCATION

DISASTER RISK REDUCTION AND MANAGEMENT SERVICE


Rm 201 MABINI BLDG., DEPED COMPLEX, MERALCO AVENUE, PASIG CITY
Tel. Nos.: +632-635-3764; +632-636-4997
Telefax Nos.: +632-637-4933; +632-637-4606
Mobile Nos.: +63908-2630382; +63915-5153138
Email address: [email protected]

____________________________________________
ANNEX B. REPORT ON THE 2ND QUARTER NATIONAL SIMULTANEOUS
EARTHQUAKE DRILL (NSED)
Date Conducted: _____June 10,2021_________________
I. Baseline Data
A Region III
B Division Nueva Ecija
C Name of School Faigal Elementary School
D School ID 105386

Question Answer Remarks


II. PRE-NSED
Did the school coordinate with LDRRMO/BDRRMC
A as part of the preparation for the actual conduct of yes
NSED? (Yes/No)
Did the school conduct an orientation to learners and
B personnel on earthquake preparedness measures yes
and the conduct of NSED? (Yes/No)
III. ACTUAL NSED
Total no. of school personnel (teaching and non-
teaching) that participated in the Ceremonial
A 8
Pressing of the Button and practiced the "DUCK,
COVER, and HOLD"
Total no. of learners that participated in the
B Ceremonial Pressing of the Button and practiced the 0
"DUCK, COVER, and HOLD"
IV. POST-NSED
Did the school DRRM team facilitate post-evaluation
A yes
of the NSED? (Yes/No)

V. ISSUES AND CONCERNS

Instruction: Please mark check (✔) all issues and concerns experienced in conducting National
Simultaneous Earthquake Drill (NSED)
/ Lack of/limited communication equipment (internet, cellphone, two-way radio, etc.)
/ Lack of/limited early warning system (bells, megaphones, alarms, etc.)
/ Limited First Aid kit
/ Limited rescue equipment
/ Limited no. of Go Bags

Improper practice of Duck, Cover & Hold

Non-compliance to minimum health protocols (physical distancing during the


evacuation, use of facemask, etc.)

Others (specify)

Prepared by: Approved by:

Name Name

JO ANN C. ALAY-AY ANABEL L. ALCANTARA


School DRRM Coordinator School Head/Principal

Page 1 of 2
Page 2 of 2

You might also like