1. The document provides a daily checklist for maintaining diesel generator (DG) sets at an equipment location each month.
2. It includes checking and recording the battery voltage, radiator water level, and diesel level in the tank.
3. Technicians are to start the DG sets for a trial run, check for abnormal noises, and ensure meters and the automatic mains failure panel are working properly before signing off.
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
75%(4)75% found this document useful (4 votes)
7K views
Daily Checklist For DG
1. The document provides a daily checklist for maintaining diesel generator (DG) sets at an equipment location each month.
2. It includes checking and recording the battery voltage, radiator water level, and diesel level in the tank.
3. Technicians are to start the DG sets for a trial run, check for abnormal noises, and ensure meters and the automatic mains failure panel are working properly before signing off.