Final Estimation For Rate Preparation
Final Estimation For Rate Preparation
L- B- H/D-
SINO ITEM DESCRIPTION N QTY UNIT QTY UNIT
FEET FEET FEET
PEB STRUTURE - UPTO 10' LEVEL 2 1 764 10 15280 sft 1421.04 SQ.M
COMPOUND WALL - 7' 2 1 594 7 8316 sft 773.388 SQ.M
23596 sft 2194.428 SQ.M
10 Painting-WHITE WASH
PEB STRUTURE - UPTO 10' LEVEL 2 1 764 10 15280 sq.ft 1421.04 SQ.M
COMPOUND WALL - 7' 2 1 594 10 11880 sq.ft 1104.84 SQ.M
0.45 mm thick sheet with zinc coating 2202.24 SQ.M ₹ 1.00 ₹ 2,202.24
RIDGE 64.6176 RM ₹ 1.00 ₹ 64.62
MISELLENOUS