Engineering Folder Structure

The document outlines a work breakdown structure (WBS) for a project. It includes 14 main categories for planning and executing the project: 01) proposals, 02) design criteria, 03) drawings, and 04) management of change. It also includes categories for 05) meetings, 06) procurement, 07) health and safety, 08) quality assurance and quality control, 09) compliance, 10) surveys and photos, 11) document control, 12) project close-out, and engineering folders. Each main category has subcategories that provide more specific tasks and deliverables for executing the project.

Uploaded by

Aashish Murali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
1K views1 page

Engineering Folder Structure

The document outlines a work breakdown structure (WBS) for a project. It includes 14 main categories for planning and executing the project: 01) proposals, 02) design criteria, 03) drawings, and 04) management of change. It also includes categories for 05) meetings, 06) procurement, 07) health and safety, 08) quality assurance and quality control, 09) compliance, 10) surveys and photos, 11) document control, 12) project close-out, and engineering folders. Each main category has subcategories that provide more specific tasks and deliverables for executing the project.

Uploaded by

Aashish Murali
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

01 WBS - Maximo

02 Programme
01 Proposals 03 Planning
03 Planning 01 Contract Agreemnet
02 Design Criteria
02 Payment
03 Drawings 04 Management of Change
04 Contract
03 Variations
04 Models 05 Meetings
04 NTC's & NTE's
05 Material List
02 Design
05 Meetings
06 Reports

07 Calculations

08 Transmittals 05 Procurement 01 Quotations

09 Meetings 02 Products & Suppliers

01 Project Mandate 01 Permits


01 Project Initiation 06 Health and Safety
02 Project Brief 02 H&S Plan

03 TMP
03 Project Execution Plan
04 Before-u-dig

05 Site Notices

01 Quotations 06 Safety Data Sheets


02 Project Budget
02 Project Estimation 07 Risk Manager Events
01 Project Start-up
03 Capex Engineering Folder Structure

01 Tender Documents 01 Standards


01 Project Close-out Report
02 Tender Evaluation 02 Specifications
03 Tendering
02 Contractor Evalutation
03 Negotiations 07 Technical 03 Technical Data Sheets

03 Recommendation 12 Project Close-out


04 Technical Information
01 Tender Clarification Meetings
04 Maintenance
02 Project Start-up Meeting
04 Meetings

01 Sent
02 Recieved
11 Document Control
03 Email Correspondence 01 QAQC Plan

02 ITP
08 QAQC

01 Photos
01 TRC Consents
02 Surveys
02 NPDC Consents
10 Surveys and Photos 09 Compliance
03 Miscellaneous 03 Legislative Requirements
04 Incidents