This document contains test data from the commissioning of a fan coil unit for an HVAC system. It includes sections to record general information about the unit, checklists to inspect installation and electrical/control connections, and air balancing data from velocity readings taken in the supply, return, and fresh air ducts. The multi-page form is used to document performance testing and ensure the fan coil unit is functioning as designed.

Uploaded by

designselva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
234 views11 pages

FCU Checklist

This document contains test data from the commissioning of a fan coil unit for an HVAC system. It includes sections to record general information about the unit, checklists to inspect installation and electrical/control connections, and air balancing data from velocity readings taken in the supply, return, and fresh air ducts. The multi-page form is used to document performance testing and ensure the fan coil unit is functioning as designed.

Uploaded by

designselva
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 11

Khorais Road Project - Riyadh

Saudi Diyar Consultants

HVAC System
Fan Coil Units
Project :
Date : Ambient Temp, °F:

a- General :

1- Unit No :
2- Location :
3- Served area :
4- Serial Number :
5- Model Number :
6- Type :
7- Voltage :
8- Amperage :
WATER
9- Inlet Temperature , ° F:
10- Outlet Temperature, ° F :
11- Inlet Pressure, psi :
12- Outlet pressure, psi :
Design Actual
13- Water flow, gpm :
AIR
14- Leaving air temperature db/wb, ° F : /
15- Entering air temperature db/wb, ° F : /
Design Actual
16- Airflow, cfm :
Electric Heater
17- Heater , Kw :
18- Stages :
Design Actual
19- Supply air, cfm
20- Return air, cfm
21- Fresh air, cfm

NOTES :
Name Signature

06/27/2021
General 1
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

b- Check List :

1 - Unit is installed with anti vibration mounts ok not ok


2 - Alignment and Levelling good bad
3 - Condensate drain pipe connected to nearest FD ok not ok
4 - Condensate drain pipe shall have a P-Trap found not found
5 - Chilled water pipes installation good bad
6 - Chilled water pipes insulation good bad
7 - FDI installation on main ChW return pipe found not found
8 - Pipes identifications ok not ok
9 - Valves tagging ok not ok
### - 2-way valve installation found not found
### - Connection to BMS found not found
### - Strainer installation found not found
### - General cleaning ok not ok
### - Duct vibration or ratling found not found
### - Die electric union installation (copper to steel) found not found
### - Electric heater installation found not found
### - Ducts installations good bad
### - Ducts insulation good bad
### - Ducts identification found not found
### - Canvas installation at main supply and return ducts found not found
### - Fresh air duct installation found not found
### - Volume damper installation at FA duct with filter found not found
### - Filter cleaning good bad

NOTES :

Name Signature Date

06/27/2021
Checklist 2
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

c- Electrical Checklist

FCU is connected to MCC panel No. :


Voltage :
Amperage :

1 - Control panel installation good bad


2 - Indication lamps found not found
3 - Phase failure unit protection found not found
4 - Overload protection found not found
5 - Wires are tightly connected good bad

c- Control Checklist

FCU is connected to DDC panel No. :


Thermostat setting:

Min, ° F Max, ° F
occupied
not occupied
RH %

1 - 2-way valve connection to DDC panel ok not ok


2 - Fan flow switch connection to DDC panel ok not ok
3 - Thermostat installation and connection to DDC ok not ok
4 - Heater connection to DDC panel ok not ok
5 - Sequence of operation programming ok not ok
6 - Interlocking with fire alarm system ok not ok

NOTES :

Name Signature Date

06/27/2021
Electrical&Control 3
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Supply Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

06/27/2021
Supply 4
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

06/27/2021
Supply 5
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Main Return Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

06/27/2021
Return 6
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

06/27/2021
Return 7
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Section: Fresh Air Duct Location:


Width, in Av. FPM 0.0 SCFM 0.0 Design CFM
Duct

Depth, in Reading No. 1 ACFM 0.0 Actual CFM


Area, ft² 0.0 Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

XY 1 2 3 4 5 6 7 8 9
1
2
3
4
5
6
7
8
9
10

Measured data
INPUT DATA
CALCULATED

NOTES :

Name Signature Date

06/27/2021
Fresh air 8
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

06/27/2021
Fresh air 9
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

d- Air Balancing

Velocity Reading

UNIT No. : Served Area: Location:


Length, ft Av. FPM 0.0 SCFM 0.0 Design CFM
Area factor Reading No. 1 ACFM 0.0 Actual CFM
Type Corr, Factor 0.90 Deviation % 100.00
INPUT DATA
CALCULATED

Measured data, FPM

NOTES :

Name Signature Date

06/27/2021
Air Outlet 10
08:01:45
Khorais Road Project - Riyadh
Saudi Diyar Consultants

1
0
100.00

06/27/2021
Air Outlet 11
08:01:45