Compliance Statement R1 Add CSCEC Parts
Compliance Statement R1 Add CSCEC Parts
Revision: 1
Compliance Statement
Specs.
Specification Requirements Supplie Remarks Contractor
Section r reply
Complia
nce
PART 1
GENERAL
1.1
RELATED DOCUMENTS
1.3 DEFINITIONS
A Free water drift loss shall not be greater Yes. Drift eliminator
than [0.001 %)] of the water circulated to efficiency is
tower. certified by
Page 1 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
B Cooling tower selection and sizing shall be Yes with Cooling tower is
based on listed ASHRAE Design Ambient remarks selected based
Temperatures. on project design
schedule.
D Performance Criteria:
Page 2 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
We comply to
CTI ATC 105 test
code for thermal
performance test
for field erected
cooling towers.
Page 3 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
1.6 SUBMITTALS
Page 4 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
B The tower manufacturer shall submit Yes with This will be Noted
detailed structural design calculations, remarks submitted after
factors of safety and the method used to detailed
obtain them, as well as test data to confirm engineering by
the material structural strength Hamon.
characteristics.
8 Sound attenuator details, insertion loss and Yes with Sound attenuator
pressure drop. remarks in basin (noise
Page 5 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
abatement
sheet) in basin is
selected to
reduce water
falling noise.
Insertion loss
and pressure
drop is not
applicable for
this attenuator.
F Shop Drawings: Complete set of Yes with Control panels Noted, will
manufacturer's certified prints of cooling remarks are not part of submit
tower assemblies, control panels, sections our proposition. through
and elevations, and unit isolation. Include shop
the following: drawings
Page 6 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
2 Operating weight and load distribution. Yes Will be submitted Noted, will
after completion submit
of detailed through
engineering. shop
drawings
3 Required clearances for maintenance and Yes Hamon will Noted, will
operation. coordinate with submit
CSCEC through
shop
drawings
5 Size and location of piping and wiring Yes with All Wiring and Noted, will
connections. remarks piping external submit
to cooling tower through
is by contractor. shop
Hamon will drawings
coordinate with
CSCEC for all
cooling tower
related.
Page 7 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 8 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 9 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 10 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
P
ASTM D-4065 Practice of Determining and Yes
Reporting Dynamic Mechanic Properties of
Plastics
Page 11 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Q
ASTM D-4385 Practice for Classifying Yes
Visual Defects in Thermosetting
Reinforced
Plastic Pultruded Products
R
CTI Bulletin STD-137 Fiberglass Pultruded Yes
Structural Products for use in Cooling
Towers
S CTI STD-111 Gear Speed Reducers
standard Yes
1.8 COORDINATION
Page 12 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
basin. All e
civil/concrete requiremen
works by CSCEC t, civil
works by
CSCEC
C Coordinate sizes and locations of roof Yes Hamon will Noted, will
curbs, equipment supports, and roof provide civil coordinate
penetrations with actual equipment guide drawing according
provided. with point loads to
for the concrete manufactur
basin. All e
civil/concrete requiremen
works by CSCEC t, civil
works by
CSCEC
1.10 WARRANTY
Page 13 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 14 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
3 Warranty period shall start from the date of Yes Subject to Noted
the substantial completion of the project. tentative project
completion date
to be defined.
Part 2 PRODUCTS
Page 15 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
2.2 MATERIALS
D Bolts and Nuts: All external and internal Yes with All hardware in
bolts and nuts shall be stainless steel. remarks the wet part will
be SS316.
Hardware used
to fix motor and
gearbox to
supporting frame
Page 16 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
4 Additives Yes
Additives to the resin mix may be used to
improve performance characteristics of the
final composite. Typical additives are UV
Page 17 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 18 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 19 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
K Fan: Yes
1. Fan Blades made of FRP, propeller
with maximum tip speed of 50 meter per
second (9,750 fpm). Fan blade assembly
shall be both statically and dynamically
balanced after assembly of the cooling
tower. Alternative fan material may be
accepted subject to demonstration of their
adequacy and long life guarantee and
better performance.
2. Fan hub shall be constructed of cast iron Yes HDG with triple
with epoxy coating or HDG Steel with Triple epoxy coating
Epoxy Coating against corrosion or steel
with hot fusion bonded epoxy 400-500
micron. Material shall be subject to
Engineer Approval.
Page 20 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
8. Fan noise shall not exceed 72 dB(A) yes 72.1 dB(A) from
at 1.0 mt and angle of 45° from fan cowl. a single fan.
Page 21 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
considered for
external
architectural
Provide fan sufficient to handle both static louver.
and dynamic pressures with 5% allowance.
3 Drive shafts shall be the full floating type Yes Carbon fiber
with flexible couplings at both ends and composite
have a service factor of 1.0 or greater. material.
Drive shafts shall be of stainless steel or
Carbon Fiber Composite, fitted each end
with flexible couplings (stainless steel plate
type). Each drive shaft shall be provided
with a galvanized steel guard, to prevent
damage to surrounding equipment in case
of shaft failure.
Provision shall be made for lubrication of all Not
Bearings are not
bearings. Bearings shall be accessible to applicabl
required for full
the extent that each bearing can be
Page 22 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
4 Gear reducer drive: Specially designed for Yes Oil drum and
cooling tower operation, with dynamically reservoir are not
balanced drive shaft assembly or shock applicable.
absorbent flexible coupling requiring no
lubrication, cast iron case with readily
accessible oil drum and fill, and self-
contained oil reservoir sealed against water
entrance.
Page 23 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
N Hot Water Distribution System: Water Yes with Flow control Flow
distribution shall be forced type system remarks valves by CSCEC control
that distributes waters through nozzles valves
evenly over the entire fill surface. The outside the
distribution system for each cell shall cooling
include adjustable flow control valves. The towers by
entire distribution system shall be self CSCEC
draining and non-clogging.
Page 24 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
O. Collecting Basin:
1 Furnish all necessary data and basin Yes Comply by Noted, will
accessories to civil contractor. Supervise CSCEC. coordinate
work and submit necessary reports and according
Hamon will
instructions. to
coordinate for all
manufactur
cooling tower
e
related.
requiremen
t, civil
works by
CSCEC
4 Each individual basin shall be provided with Yes Comply by Noted, will
an individual outlet. Each outlet shall be CSCEC. coordinate
pro- vided with a stainless steel anti-vortex according
Page 25 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
5 Each basin shall be provided with overflow Yes Comply by Noted, will
and valved drain connections. Each basin CSCEC. coordinate
shall be provided with a level transmitter according
Hamon will
and level switches. The makeup water to
coordinate for all
shall discharge not less than 50 mm (2 manufactur
cooling tower
inches) or two pipe diameters, whichever is e
related..
greater, above the top of the basin. requiremen
t, civil
works by
CSCEC
P Fill:
Page 26 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
R Louver Material: The air inlet louvers shall Yes Supported with
be fabricated from a minimum of 12 oz. FRP members.
FRP casing and supported with pultruded
no stainless-steel
FRP and stainless steel structural members.
structural
members.
Page 27 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
to
approved
shop
drawings
2.3 MOTORS
Page 28 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
G Motor Speed: Variable speed complete with Yes with Motors are VFD drive
variable speed drive. remarks suitable to run in CSCEC
with VFD drive. scope
VFD drive to be
supplied by
CSCEC
H Motor and gear Removal: Provide a motor Yes with Hamon standard
and gear removal crane system per cooling remarks dismantlable
tower cell as per manufacture standard. type gear and
The crane to be of stainless steel motor removable
construction. system in hot dip
galvanized steel
is proposed.
Page 29 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
A Direct isolation (no base) with restrained Not Cooling tower is Not
spring isolators. applicabl designed for applicable
e seismic zone 2A. for field
Moreover cooling erected
tower is cooling
anchored tower
through multiple
points on the
basin which will
comply for the
vibration and
seismic
restraints.
A The cooling tower factory test shall be Not Factory test is Not
performed in the presence of the Client’s applicabl not applicable for applicable
and Engineer’s representatives’ team. The e field erected for field
team will comprise maximum four cooling tower. erected
representatives. All expenses including cooling
Cooling tower
transportation, business class airfare, hotel tower
will be tested at
accommodation, etc …. to be borne by the
Page 30 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
E All Cooling towers shall be tested one by Yes with CTI ATC 105 test
one while all other towers in plant are in remarks will be performed
real operation to demonstrate actual CTI on one typical
testing and proper thermal performance of cell.
tower under test.
Page 31 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
PART 3 - EXECUTION
3.1 EXAMINATION
INSTALLATION
Page 32 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 33 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
3.3 CONNECTIONS
Page 34 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 35 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 36 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 37 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
D Start cooling tower and associated water Yes Comply By Noted, will
pumps. Follow manufacturer's written CSCEC follow
starting procedures. follow
manufactur
er's written
starting
procedures.
3.6 ADJUSTING
3.7 DEMONSTRATION
Page 38 of 39
Date: 25th February 2020
Revision: 1
Compliance Statement
Page 39 of 39