The document provides a quantity calculation for protection work on Bridge No. 60/1 on NH-39. It includes calculations for the volume of various construction elements. The key elements calculated are: 1) Curtain wall concrete (165.6129 cubic meters) 2) Concrete below the curtain wall (48.67736 cubic meters) 3) Boulder apron (151.0677 cubic meters) 4) Concrete floor slab (15.30472 cubic meters)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
164 views

Protection60 1

The document provides a quantity calculation for protection work on Bridge No. 60/1 on NH-39. It includes calculations for the volume of various construction elements. The key elements calculated are: 1) Curtain wall concrete (165.6129 cubic meters) 2) Concrete below the curtain wall (48.67736 cubic meters) 3) Boulder apron (151.0677 cubic meters) 4) Concrete floor slab (15.30472 cubic meters)
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 8

QUAN

QUANTITY CALCULATION FOR Protection Work of Bridge No:- 60/1 on NH-39


DESIGN FOR 12.90m Wide Bridge 1.Curtain wall PCC M-20
DECK LEVEL at Centre= 102.66 M
0.018 0.018 0.018
0.25 0.185 6.37 0.185 6.37 0.185 0.25

0.56 0.56
0.37 0.225 0.225 2.PCC below curtain wall
V.C= 2
0.638 HFL= 100 4.175

2.4
LBL/LWL= 97.9 1.2
1.2 97.6 3.Boulder appron=

1.2 96.5
96.35
4.CC/ Floor=
13.294
SECTIONAL ELELVATION
Thickness of Wearing coat at centre= 0.1 5.CC/ Floor=
Thickness of Wearing coat at End= 0.05 20.7627722772278
Average Thickness of Wearing coat= 0.075 14.67928
0.018 0.018 0.018
0.25 6.74 6.74 0.25 14.67928
1.2

12.9 10.5
42.26299
whole

1.2

PLAN 14.68371

42.65699
DECK SLAB

4.5

1.2 1.236932

0.3
RAFT 32 6.320988
25 3.858025
20 2.469136
16 1.580247
12 0.888889
8450

66.03261

35.49274
1.307263

68.46471 kg/m3

0
for all 1.4m 0.15
0.15
0.48875
0.0552
0.905
Area= 1.74895 m2
L= 1.4 m2 area 1.74895 m2
vol= 2.44853 m3
area 4.9045
m2

6.26 overall height

0.15
1.4 17.70328
m m END
19.30328 m 0.15
0.15
1.09375
1.41075
2.1
4.9045 m2
QUANTITY CALCULATION FOR Protection Work of Bridge No:- 60/1 on NH-39

1.Curtain wall PCC M-20


(0.65+1.3)/2*42.66*1.75= 72.7835 m3
(0.5+1.0)/2*13.294*1.75= 17.44838 m3
(0.65+1.3)/2*2.5*13.294= 32.40413 m3
(0.55+1.0)/2*1.3*42.66= 42.97692 m3
Total= 165.6129 m3
2.PCC below curtain wall(M-15)
1.6*0.3*42.66= 20.47536 m3
1.3*0.3*13.294= 5.18466 m3
1.6*0.3*13.294= 6.38112 m3
1.3*0.3*42.66= 16.63623 m3
Total= 48.67736 m3
3.Boulder appron=
(13.29+42.66)/2*3.0*0.6= 50.35589 m3
(13.29+42.66)/2*6.0*0.6= 100.7118 m3
Total= 151.0677 m3
4.CC/ Floor=
1.225*13.294*0.3= 4.885545 m3

5.CC/ Floor=
1.225*13.294*0.15= 2.442773 m3
3.225*13.294*0.3= 12.86195 m3
Total= 15.30472 m3