0.56 0.56
0.37 0.225 0.225 2.PCC below curtain wall
V.C= 2
0.638 HFL= 100 4.175
2.4
LBL/LWL= 97.9 1.2
1.2 97.6 3.Boulder appron=
1.2 96.5
96.35
4.CC/ Floor=
13.294
SECTIONAL ELELVATION
Thickness of Wearing coat at centre= 0.1 5.CC/ Floor=
Thickness of Wearing coat at End= 0.05 20.7627722772278
Average Thickness of Wearing coat= 0.075 14.67928
0.018 0.018 0.018
0.25 6.74 6.74 0.25 14.67928
1.2
12.9 10.5
42.26299
whole
1.2
PLAN 14.68371
42.65699
DECK SLAB
4.5
1.2 1.236932
0.3
RAFT 32 6.320988
25 3.858025
20 2.469136
16 1.580247
12 0.888889
8450
66.03261
35.49274
1.307263
68.46471 kg/m3
0
for all 1.4m 0.15
0.15
0.48875
0.0552
0.905
Area= 1.74895 m2
L= 1.4 m2 area 1.74895 m2
vol= 2.44853 m3
area 4.9045
m2
0.15
1.4 17.70328
m m END
19.30328 m 0.15
0.15
1.09375
1.41075
2.1
4.9045 m2
QUANTITY CALCULATION FOR Protection Work of Bridge No:- 60/1 on NH-39
5.CC/ Floor=
1.225*13.294*0.15= 2.442773 m3
3.225*13.294*0.3= 12.86195 m3
Total= 15.30472 m3