Gc3 - The Health and Candidate's Observation Safety Practical Application Sheet

The document provides a summary of safety hazards identified during an inspection of the Lusail LRT Project in Doha, Qatar. It lists 12 hazards observed, including workers not wearing proper hearing protection, lack of banksman for machinery operation, fire extinguishers being depressurized, electrical socket overloading, improper scaffold tagging, and unsafe material handling. For each hazard, it recommends immediate control measures and longer-term actions to address the issues along with target timescales for completion. The inspection findings will help improve safety conditions at the construction site.

Uploaded by

Nowfal Habeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
794 views

Gc3 - The Health and Candidate's Observation Safety Practical Application Sheet

The document provides a summary of safety hazards identified during an inspection of the Lusail LRT Project in Doha, Qatar. It lists 12 hazards observed, including workers not wearing proper hearing protection, lack of banksman for machinery operation, fire extinguishers being depressurized, electrical socket overloading, improper scaffold tagging, and unsafe material handling. For each hazard, it recommends immediate control measures and longer-term actions to address the issues along with target timescales for completion. The inspection findings will help improve safety conditions at the construction site.

Uploaded by

Nowfal Habeeb
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 7

GC3 – THE HEALTH AND Candidate’s observation

SAFETY PRACTICAL APPLICATION sheet

Sheet number 1 of _5___

Student name: Ajeem As Ajeem As_ Student number: 00486731

Place inspected: Lusail LRT Project Doha Qatar Date of inspection: 03/ 06 / 2019

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
1.Labours don’t have earplug or a. Stop the work and provide proper Immediate
earmuff Earplug or Earmuff
While demolishing the concrete using b. Adequate training and supervision to One day
jack hammer and the noise level workers.
measured was 105dB which is more c. Implementation of job rotation and rest Three days
than PEL(Permissible Exposure Limit), hours
will lead to noise induced hearing loss.
a.Stop the work and inform the operator Immediate
2.No banksman were present with the and concerned supervisor not to operate
backhoe loader while transferring the the machinery without banksman.
excavated material, will lead to collision b.Provide certified banksman for all Everytime
with other vehicle or person causing machineries having blindspots.
severe injury or property damage
a. Stop the hot work, remove the Immediate
3.Fire extinguisher provided for welding depressurised extinguisher from the area
area was found depressurised, may and inform the concerned supervisor
lead to delay in suppressing fire b.Send the fire Extinguisher to store for 7 Days
increasing the probability of burn refilling
injuries and property damage c.Carry out inspection of all fire Monthly
extinguisher

a.Trip off the socket input and remove the Immediate


4.Main Site office electrical outlet socket overloaded equipments
was overloaded by electrical b.Switch off or isolate the equipments Everytime
equipments which may cause fire and when not in use and carry out visual
explosion leading to severe burn inspection
injuries and property damage c.Provide multipin with fuse 4 days
d.Conduct awareness about electrical One Month
safety
Good Practice Continue
5.Portable diesel generators were
provided with drip trays for containing
spillage
a.Inform the concerned supervisor to Immediate
6.Nails were found scattered on the remove nails immediately.
floor in the carpentry area may lead to b.Maintain good housekeeping Daily
puncture injury c.Conduct awareness about the One month
importance of housekeeping

/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number 2 of _5__

Student name :Ajeem As Ajeem As Student number: 00486731

Place inspected :Lusail LRT Project Doha Qatar Date of inspection: 03/ 06 / 2019

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
7.Found cable drums stored in general a. .Inform store supervisor to provide Immediate
storage area without stoppers,may lead stoppers for the cable drums.
to rolling of cable drums causing b.Secure the area and proper signages 2 days
collision with person and property
damage

8.Worker was found working on a.Remove all workers from the scaffold Immediate
scaffold with red tag, may cause and inform the concerned supervisor.
collapse of scaffold or fall from height of b.Conduct awareness about scaffold One week
the worker causing severe fractures or tagging system to all workers
fatality c.Carry out inspection for scaffolds by Weekly
certified scaffolding inspectors

9.Workers are manually excavating an a.Stop the work and remove the workers Immediate
excavation more than 1.5 m deep do safely from excavation
not have proper access and egress will b.Provide proper access and egress for 2 Hours
result to entrapping the worker during excavation
emergency and may lead to suffocation c. Inspect the excavation before starting Every time
or death of work
d.provide proper signages and barrication Everytime

10.Workers where manually shifting the a.Stop the work and inform supervisor Immediate
50kg cement bags from store to work b.Provide mechanical aid such as pallet
location may lead to back injuries trolly,forklift for material transfer 1 Week
masculoskeletal disorders c.Condect training and awarenes 2 Week
regarding safe manual handling

11.Labors were passing freely under a,Stop the lifting process,remove all Immediate
the suspended load during lifting unautherised persons from lifting area
process and also noted the absence of and inform to sit incharge
proper barrication and signages.any b.Provide proper signages and 1 Hour
failure in the lifting process will lead to barrication
severe crush injuries or fatality c.Appoint a banksman to control the 1 Days
unautherised entry
d.Conduct safety toolbox for lifting 2 Days
process

12.Combustable material found in the a.Stop the welding process remove all
welding area it will easely catch the fire combustable material around 20 feet Immediate
during welding from spark lead to burn circumfrence
injuries,property damages b.barricade the welding area with proper 1 Hour

/conversion/tmp/activity_task_scratch/530572211.doc
signages

/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number 3 of _5_

Student name: _
Ajeem As Ajeem As Student number: 00486731

Place inspected: Lusail LRT Project Doha Qatar Date of inspection: 03/ 06/ 2019

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions
c.inspect the welding area regularly and Everytime
appoint a fire watcher and provide
enough fireextinguishers
d.conduct awarenes about welding safety 1 week

13.Temperary toilet facilities were a. Regular cleaning of toilets and Daily


leaking and have poor sanitary may maintain a log sheet
lead to transmission of diseases such b.Replace poor sanitary with new ones 1 week
as cholera, diarrhoea etc and also repair the leakages
c.conduct awareness regarding proper 2 weeks
usage of welfare facilities
14.Overspeeding of forklifts was noticed a. Stop the forklift and inform the site Immediate
in the worksite may lead to collision, incharge
toppling,fall of material causing grievous b. Establish and enforce site traffic rules 1 week
injuries and property damage c. Provide defensive driving training to 2 weeks
operators
d. Install speed governing system in 1 month
forklifts
15.Diesel cans were stored inside a. Inform the supervisor to remove the Immediate
combustible wooden boxes in the site diesel cans asap.
may lead to fire in the presence of heat b. Provide proper area for storage 1 week
source c. Conduct awareness regarding 2weeks
handling of coshh(control of substances
hazardous to health) materials.
16.Absence of proper barrication and a.Suspend all excavation activities and Immediate
signages for an excavation greater than inform supervisor to resume only after
3 meters may lead to fall of providing hard barication and signages
vehicles,person can cause severe b.Inspection of area before Daily
injuries,fatality and property damage commencement of work.
c.conduct awareness regarding 1 month
excavation safety
17.Worker was found using drilling a.Cut off the power supply for stopping Immediate
machine while standing on ‘A frame’ the work and tell the worker to come
ladder may lead to fall injury due to down safely
unbalanced state b. Conduct ToolBox Talk regarding Immediate
ladder-DO’s and Don’ts to the worker
c.Provide mobile scaffold for the activity 2 days
d.Conduct awaress regarding safe 2 weeks
usage of ladders.

/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number 4 of 5__

Student name: Ajeem As Ajeem As Student number : 00486731

Place inspected :Lusail LRT Project Doha Qatar Date of inspection :03 / 06/ 2019

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

18.Worker was found using angle a.Stop the work and inform supervisor to Immediate
grinder without machine guard for provide machine guard.
polishing the track slab may lead to b. Provide instruction,information, 1 week
entanglement, cut injuries. training and supervision to worker for
safe usage of power tools
c.Inspect power tools periodically and 1 mounth
implement color codes for safe
equipments
19.Faulty air blower provided for a. Suspend the activity, tell the workers Immediate
manhole when workers where working to come out from the manhole and
inside may cause asphyxiation inform supervisor to resume only after
providing working air blower.
b.pre use inspection of air blower before Everytime
commencing activity
20.No spill contamination system a.Inform the storekeeper to store inside Immediate
implemented in the paint storage area driptrays
may cause spillage affecting the b.inform the procurement department to 2 weeks
environment order spill kit.

21.Protruding rebars were present in a.Install rebar caps Immediate


the work area without protection(rebar b.conduct awareness regarding 1 week
caps) may cause puncture or stabbing protruding hazards
injury

22.Damaged web sling were used for a.Suspend the activity and infom the Immediate
lifting of cable drum may lead to lifting supervisor to replace the web sling
breaking of websling and fall of cable b.Inspect all lifting gears before
drum injuring person, fatality and commencing lifting activities. Everytime
damage to property

23.Workers were found dumping a.Provide different skips for different Immediate
different types of waste without types of waste
segregation in skips b.Provide information ,instruction,
training and supervision to workers 1 week
regarding waste segregation.

24. Some workers were working with a. Remove the workers who lack proper Immediate
concrete mixer without gumboots and PPE
rubber gloves. The prolonged exposure b.inform concerned supervisor to provide immediate
with cement may lead to skin burn and them PPE.
dermatitis.

/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet

Sheet number 5 of __5__

Student name: Ajeem As Ajeem As student number 00486731

Place inspected Lusail LRT Project Doha Qatar Date of inspection 03 / 06/ 2019

Observations Control measures Timescale


Hazards and consequences Immediate and longer term actions

25.No risk assessment communication a. Stop the ongoing cable pulling Immediate
was done for the cable pulling activity , activity ,inform the supervisor to
causing lack of awareness of inherent communicate it to all workers and
hazards leading to injuries or even maintain the record. Everytime
fatalities b. Implement techniques like job rotation

26. combustible materials found in Immediate


designated smoking area may lead to a. Remove the combustible materials as
fire causing burn injuries and property soon as possible. Everytime
damage. b.Maintain good housekeeping Good
Practice
27.Adequate drinking water facilities
available throughout the site
Good Practice
28.First Aid kits are available at site
Good Practice
29.Safety induction provided for all new
employees and visitors in the site Good Practice

30..seperate way was provided for


pedestrians and vehicles Good Practice

31.Rest areas were provided


throughout the site Good practice