Gc3 - The Health and Candidate's Observation Safety Practical Application Sheet
Gc3 - The Health and Candidate's Observation Safety Practical Application Sheet
Place inspected: Lusail LRT Project Doha Qatar Date of inspection: 03/ 06 / 2019
/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet
Place inspected :Lusail LRT Project Doha Qatar Date of inspection: 03/ 06 / 2019
8.Worker was found working on a.Remove all workers from the scaffold Immediate
scaffold with red tag, may cause and inform the concerned supervisor.
collapse of scaffold or fall from height of b.Conduct awareness about scaffold One week
the worker causing severe fractures or tagging system to all workers
fatality c.Carry out inspection for scaffolds by Weekly
certified scaffolding inspectors
9.Workers are manually excavating an a.Stop the work and remove the workers Immediate
excavation more than 1.5 m deep do safely from excavation
not have proper access and egress will b.Provide proper access and egress for 2 Hours
result to entrapping the worker during excavation
emergency and may lead to suffocation c. Inspect the excavation before starting Every time
or death of work
d.provide proper signages and barrication Everytime
10.Workers where manually shifting the a.Stop the work and inform supervisor Immediate
50kg cement bags from store to work b.Provide mechanical aid such as pallet
location may lead to back injuries trolly,forklift for material transfer 1 Week
masculoskeletal disorders c.Condect training and awarenes 2 Week
regarding safe manual handling
11.Labors were passing freely under a,Stop the lifting process,remove all Immediate
the suspended load during lifting unautherised persons from lifting area
process and also noted the absence of and inform to sit incharge
proper barrication and signages.any b.Provide proper signages and 1 Hour
failure in the lifting process will lead to barrication
severe crush injuries or fatality c.Appoint a banksman to control the 1 Days
unautherised entry
d.Conduct safety toolbox for lifting 2 Days
process
12.Combustable material found in the a.Stop the welding process remove all
welding area it will easely catch the fire combustable material around 20 feet Immediate
during welding from spark lead to burn circumfrence
injuries,property damages b.barricade the welding area with proper 1 Hour
/conversion/tmp/activity_task_scratch/530572211.doc
signages
/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet
Student name: _
Ajeem As Ajeem As Student number: 00486731
Place inspected: Lusail LRT Project Doha Qatar Date of inspection: 03/ 06/ 2019
/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet
Place inspected :Lusail LRT Project Doha Qatar Date of inspection :03 / 06/ 2019
18.Worker was found using angle a.Stop the work and inform supervisor to Immediate
grinder without machine guard for provide machine guard.
polishing the track slab may lead to b. Provide instruction,information, 1 week
entanglement, cut injuries. training and supervision to worker for
safe usage of power tools
c.Inspect power tools periodically and 1 mounth
implement color codes for safe
equipments
19.Faulty air blower provided for a. Suspend the activity, tell the workers Immediate
manhole when workers where working to come out from the manhole and
inside may cause asphyxiation inform supervisor to resume only after
providing working air blower.
b.pre use inspection of air blower before Everytime
commencing activity
20.No spill contamination system a.Inform the storekeeper to store inside Immediate
implemented in the paint storage area driptrays
may cause spillage affecting the b.inform the procurement department to 2 weeks
environment order spill kit.
22.Damaged web sling were used for a.Suspend the activity and infom the Immediate
lifting of cable drum may lead to lifting supervisor to replace the web sling
breaking of websling and fall of cable b.Inspect all lifting gears before
drum injuring person, fatality and commencing lifting activities. Everytime
damage to property
23.Workers were found dumping a.Provide different skips for different Immediate
different types of waste without types of waste
segregation in skips b.Provide information ,instruction,
training and supervision to workers 1 week
regarding waste segregation.
24. Some workers were working with a. Remove the workers who lack proper Immediate
concrete mixer without gumboots and PPE
rubber gloves. The prolonged exposure b.inform concerned supervisor to provide immediate
with cement may lead to skin burn and them PPE.
dermatitis.
/conversion/tmp/activity_task_scratch/530572211.doc
GC3 – THE HEALTH AND Candidate’s observation
SAFETY PRACTICAL APPLICATION sheet
Place inspected Lusail LRT Project Doha Qatar Date of inspection 03 / 06/ 2019
25.No risk assessment communication a. Stop the ongoing cable pulling Immediate
was done for the cable pulling activity , activity ,inform the supervisor to
causing lack of awareness of inherent communicate it to all workers and
hazards leading to injuries or even maintain the record. Everytime
fatalities b. Implement techniques like job rotation
/conversion/tmp/activity_task_scratch/530572211.doc