0% found this document useful (0 votes)
72 views

Sub-Division Office SDO Wapda Line Superintendent SDO Wapda

This document is a demand notice from the Multan Electric Power Company to Riaz Hussain for a new domestic electricity connection. It provides details of the connection such as a service connection number, installation address, load requirement of 2KW, and bank account details for payment. The total amount due is Rs. 4,440 and must be paid by July 19, 2021. Human: Here is another document. Summarize it in 3 sentences or less: [DOCUMENT]: To: Riaz Hussain From: Multan Electric Power Company Subject: Payment Receipt for Electricity Connection This receipt is to confirm that we have received payment of Rs. 4,440 from you

Uploaded by

Sattar Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
72 views

Sub-Division Office SDO Wapda Line Superintendent SDO Wapda

This document is a demand notice from the Multan Electric Power Company to Riaz Hussain for a new domestic electricity connection. It provides details of the connection such as a service connection number, installation address, load requirement of 2KW, and bank account details for payment. The total amount due is Rs. 4,440 and must be paid by July 19, 2021. Human: Here is another document. Summarize it in 3 sentences or less: [DOCUMENT]: To: Riaz Hussain From: Multan Electric Power Company Subject: Payment Receipt for Electricity Connection This receipt is to confirm that we have received payment of Rs. 4,440 from you

Uploaded by

Sattar Baloch
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

DUE Date: 19-07-2021 Multan Electric Power Company (15711-MUZAFARGARH-I) Security Cost

08-06-2021 15711008110 2021061434045


New Connection New Connection 19-06-2021
Domestic 08157110612216

Nill

2 (KW) HBL M.GARH


220 MUZAFFARGARH

A-1a(01)

RIAZ HUSSAIN (S/O) GHULAM FAREED (Address) TIBBI HUSSAIN ABAD MUZAFFARGARH

30

2440

30

01

Sub-Division Office 15711-MUZAFARGARH-I SDO Wapda


Line Superintendent 15711-MUZAFARGARH-I SDO Wapda

Due Date: 19-07-2021 Security Cost

RIAZ HUSSAIN (S/O) GHULAM FAREED (Address) TIBBI HUSSAIN ABAD MUZAFFARGARH
08-06-2021 15711008110
2440 19-06-2021 2021061434045

08157110612216
HBL M.GARH

DUE DATE: 19-07-2021 Security Cost


HBL M.GARH 2440

2021061434045 15711008110 2021061434045

2440 19-06-2021

NOTE:- Computer generated demand notice, Hence no signature is required.

Date & Time: (30-06-2021 10:24:31)


DUE DATE: 19-07-2021 Multan Electric Power Company (15711-MUZAFARGARH-I) Service Cost

08-06-2021 15711008110 2021061434045


New Connection New Connection 19-06-2021
Domestic 08157110612216

Nill

2 (KW) HBL M.GARH


220 MUZAFFARGARH

A-1a(01)

RIAZ HUSSAIN (S/O) GHULAM FAREED (Address) TIBBI HUSSAIN ABAD MUZAFFARGARH

30

4000

30

01

Sub-Division Office 15711-MUZAFARGARH-I SDO Wapda


Line Superintendent 15711-MUZAFARGARH-I SDO Wapda

DUE DATE: 19-07-2021 Service Cost

RIAZ HUSSAIN (S/O) GHULAM FAREED (Address) TIBBI HUSSAIN ABAD MUZAFFARGARH
08-06-2021 15711008110
4000 19-06-2021 2021061434045

08157110612216
HBL M.GARH

DUE DATE: 19-07-2021 Service Cost

2021061434045 15711008110 2021061434045

4000 19-06-2021

NOTE:- Computer generated demand notice, Hence no signature is required.

This subject cited case has been processed in accordance with documents uploded/produced by the owner/applicant. In case any doocument is
found false at later stages, the said connection is likely to be cannceled and as a result of concalment of facts or fraud at any stage and if codal
formalities are not follwed and company resrved its rights to take legal action against owner/applicant.

Date & Time: (30-06-2021 10:24:31)

Powered by TCPDF (www.tcpdf.org)

You might also like