0% found this document useful (0 votes)
141 views1 page

#104 Dalumpinas RD., Lingsat, San Fernando, La Union

Fabro Construction, a construction company based in La Union, sent a letter to the City Engineer of Dagupan City requesting the release of the final billing for the completed development of an open-air auditorium and open grounds in Tondaligan Blue Beach, Bunoan District, Dagupan City. The letter references their contract for the project and confirms its 100% completion, allowing for the final payment to be processed.

Uploaded by

Claire Fabro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
141 views1 page

#104 Dalumpinas RD., Lingsat, San Fernando, La Union

Fabro Construction, a construction company based in La Union, sent a letter to the City Engineer of Dagupan City requesting the release of the final billing for the completed development of an open-air auditorium and open grounds in Tondaligan Blue Beach, Bunoan District, Dagupan City. The letter references their contract for the project and confirms its 100% completion, allowing for the final payment to be processed.

Uploaded by

Claire Fabro
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 1

FABRO CONSTRUCTION

#104 Dalumpinas Rd., Lingsat, San Fernando, La Union


PCAB NO. 36506

June 29, 2021

ENGR. NESTOR DE VERA


CITY ENGINEER
CITY ENGUNEERING’S OFFICE, DAGUPAN CITY

SUBJECT : REQUEST RELEASE OF FINAL BILLING


DEVELOPMENT OF OPEN-AIR, AUDITORIUM OPEN GROUNDS TONDALIGAN
BLUE BEACH BUNOAN GUESET, DAGUPAN CITY.

SIR,

With reference to our contract in connection with, “DEVELOPMENT OF OPEN-AIR,


AUDITORIUM OPEN GROUNDS TONDALIGAN BLUE BEACH BUNOAN GUESET, DAGUPAN CITY”. May
we request your good office for the release of Final Billing, exclusively for the 100% Completion of the
above mentioned project.

Your Kindness attention on this matter will be highly appreciated.

Very Truly Yours,

MYRA CLAIRE FABRO


FABRO CONSTRUCTION

You might also like