This document is an inspection checklist for an engine generator set located at facility LPU2. It contains sections for collecting customer and equipment data, performing a visual and mechanical inspection, and conducting various electrical tests, including insulation resistance, polarization index, and load tests at percentages of the generator's rating. The inspection and tests are intended to verify that the generator set is in good working condition and meets manufacturers' specifications.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
222 views
Engine Generator Set Inspection Checklist
This document is an inspection checklist for an engine generator set located at facility LPU2. It contains sections for collecting customer and equipment data, performing a visual and mechanical inspection, and conducting various electrical tests, including insulation resistance, polarization index, and load tests at percentages of the generator's rating. The inspection and tests are intended to verify that the generator set is in good working condition and meets manufacturers' specifications.
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3
ENGINE GENERATOR SET INSPECTION CHECKLIST
SECTION A – CUSTOMER DATA
1. FACILITY: 2. LOCATION: 3. JOB NUMBER: LPU2 GIFT NA 4. EQUIPMENT: 5. CIRCUIT DESIGNATION: 6. DATE: 15 Feb. 2021 7. TEST EQUIPMENT TYPE/BRAND AND CALIBRATION DATE 8. TESTED BY: KARAR HAIDER SECTION B – EQUIPMENT DATA 9. MANUFACTURER: 10. STYLES/S.O. 11. VOLTAGE RATING 12. KW RATING 13. CIRCUIT BREAKER SIZE/INTERRUPTING RATING 14. WET BULB TEMP. 15. DRY BULB TEMP. SECTION C – VISUAL AND ELECTRICAL/MECHANICAL INSPECTION 16. CHECK POINT COND* NOTES CHECK POINT COND* NOTES EXTERIOR OF EQUIPMENT EQUIPMENT IDENTIFICATION COMPLETENESS OF ASSEMBLY BRACING EQUIPMENT ROTATION PROPER PHASE CONNECTIONS CHECK OIL LEVEL REFERENCE DRAWING CHECK FUEL LEVEL WORKING CLEARANCE PROPER EQUIPMENT ANCHORAGE GROUNDING CHECK METERS/GAUGES ALL FILTERS AND VENTS CLEAR TIGHTNESS OF BOLTED CHECK EQUIPMENT CONNECTIONS ENVIRONMENTAL CLASSIFICATION VERIFY GOVERNOR AND CHECK FOR PROVISIONS OF REGULATOR SPILL CONTAINER CHECK VIBRATION CONTROL SYSTEM CHECK BATTERIES CHECK FUEL FILTER CHECK RADIATOR FLUID CHECK ALARM INDICATORS: PROPER COLOR FOR EACH FUNCTION PROPER SYSTEM GROUND SECTION D – ELECTRICAL TESTS A-GRD B-GRD C-GRD A-B B-C C-A 17. INSULATION RESISTANCE POLARIZATION INDEX RATIO = 10 MIN. /1 MIN. DC OVERPOTENTIAL TEST 18. NOTES: 1- PERFORM 5 MEASUREMENTS AT ONE-MINUTE INTERVALS. 2- DC HIPOT MEASUREMENTS SHOULD BEGIN AT 20% OF MAXIMUM TEST VOLTAGE AND INCREASE IN EQUAL INTERVALS. MAX DC TEST VOLTAGE = R (2X NAMEPLATE RATING) X 1.6 WHERE R = .8 FOR DC TEST ON INSULATION WHERE R = .6 FOR DC TEST AFTER SERVICE (TEST MEASUREMENTS SHOULD NOT EXCEED MANUFACTURER’S RECOMMENDATION) 19. MEASUREMENT DESCRIPTION VOLTAGE CURRENT** A-N B-N C-N A-B B-C C-A A B C N G
21. LOAD TESTS AS PERCENTAGE OF GENERATOR RATING
A-N NO LOAD 25 % 75% 100% 110% (PRIME ENGINE ONLY) B-N C-N A-B B-C C-A A B C N G 22. NOTES: 1- VOLTAGE MEASUREMENT TO BE MADE AFTER GENERATOR IS STARTED AND CONNECTED TO LOAD (CAN USE LOAD BANK). 2- DURING COMMISSIONING OF GENERATOR SETS OR ANY EQUIPMENT, A REPRESENTATIVE OF THE MANUFACTURING COMPANY OR SUPPLIER MUST BE PRESENT TO WITNESS AND/OR PERFORM THE TESTS. 3- ENGINE GENERATOR TESTING IS A VERY INTENSIVE PROCESS AND REQUIRES 10-TO-14-HOUR DAY DEPENDING ON THE EQUIPMENT BEING COMMISSIONED. SUPPLIER/MANUFACTURER NORMALLY SUPPLY GENERATOR TESTING LOAD REQUIREMENTS. 4- VERIFY ALL SYSTEM CHECK POINTS DURING LOAD CHANGE AND RECORD PER SPECIFIED REQUIREMENTS AND/OR EQUIPMENT MANUFACTURER. 5- PERFORM AND RECORD ENGINE MANUFACTURER’S RECOMMENDED CHECKS AND INSPECTIONS. *CONDITION: A=ACCEPTABLE; R=NEEDS REPAIR, REPLACEMENT OR ADJUSTMENT; C=CORRECTED; NA NOT APPLICABLE. **NOTE VALUE AND PHASING