Cement Book / Visualization Exercises: Exercise 1

The document provides 9 exercises calculating cementing parameters for various casing and hole configurations. For each exercise, the trainee is asked to calculate values for variables like V&H factors, casing capacity, hydrostatic factors, water requirements, and slurry yields based on information provided about the hole geometry, casing properties, mud and cement densities, and cement placement heights. The goal is to practice using a "Cement Book" to look up information and calculate the necessary parameters for cementing jobs.

Uploaded by

Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
96 views6 pages

Cement Book / Visualization Exercises: Exercise 1

The document provides 9 exercises calculating cementing parameters for various casing and hole configurations. For each exercise, the trainee is asked to calculate values for variables like V&H factors, casing capacity, hydrostatic factors, water requirements, and slurry yields based on information provided about the hole geometry, casing properties, mud and cement densities, and cement placement heights. The goal is to practice using a "Cement Book" to look up information and calculate the necessary parameters for cementing jobs.

Uploaded by

Tariq
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 6

Cement Book / Visualization Exercises

Use your CementBook to find the information required to calculate the job. For V&H Factors &
Capacity Factor, give BOTH ft3/ft and bbl/ft.

Exercise 1
Hole: 26 inch; TD 305 ft
Casing: 20inch, 94 lb/ft
Float Shoe: 300 ft
Mud: 8.6 lb/gal
Lead cement 13.2 lb/gal
Tail cement: 15.8 lb/gal
Top of tail cement = 180 ft
Lead cement to surface

ft3/ft bbl/ft

V&H factor: __________________ _________________


Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
Water requirement: _____________________
Slurry yield: _____________________
Tail cement:
Hydrostatic factor cement: ___________________
_____________________
_____________________

Exercise 2
12 ¼” OH drilled to 815 ft
Casing: 9 5/8inch, 47 lb/ft
Float collar: 771 ft
Float shoe: 813 ft
Mud: 9.1 lb/gal
Lead cement: , 14.0 lb/gal
Tail cement: 16.4 lb/gal
Height of tail cement = 250 ft
Lead cement to surface
ft3/ft bbl/ft

V&H factor: __________________ _________________


Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________
Exercise 3
Casing: 13 3/8 inch, 68 lb/ft
Set at 485 ft
Hole: 11 7/8 inch TD at 1250 ft
Casing: 10 ¾ inch, 45.5 lb/ft J-55
Float collar: 1125 ft
42 ft shoe joint
Mud: 9.9 lb/gal
Lead cement:, 11.7 lb/gal
Tail cement: 15.8 lb/gal
Lead cement to surface
Height of lead cement = 677 ft
ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________

Exercise 4
Hole: 22 ¾ inch, at 930 ft
Casing: 18 5/8 inch 106 lb/ft
Float collar: 896 ft
Float shoe: 926 ft
Mud: 8.6 lb/gal
Lead cemen, 13.2 lb/gal
Tail cement: 16.4 lb/gal
Top of tail cement – 651 ft
Lead cement to surface
ft3/ft bbl/ft

V&H Factor Casing & Open Hole: __________________ _________________


Casing Capacity: __________________ _________________
Hydrostatic Factor Mud: _____________________
Lead Cement:
Hydrostatic Factor:

_____________________
Tail Cement:
Hydrostatic Factor Cement: _____________________
_____________________
_____________________
Exercise 5
Casing: 10 ¾ inch, 60.7 lb/ft
Set at 5001 ft
9 inch OH drilled to 9055 ft
Casing: 7 inch, 35 lb/ft
Float collar: 8966 ft
Float shoe: 9026 Ft
Mud: 12.6 lb/gal
Lead cement: Class H + 6% Bentonite, 14.1 lb/gal
Tail cement: Class H + 35% SSA 2, 16.0 lb/gal
Height of tail cement – 1500 ft
Height of lead cement = 3525 ft
ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
Water requirement: _____________________
Slurry yield: _____________________
Tail cement:
Hydrostatic factor cement: _____________________
Water requirement cement: _____________________
Slurry yield: _____________________

Exercise 6
Casing: 7 5/8 inch 39 lb/ft
Set at 6567 ft
9” OH TD at 11720 ft
Casing: 4 ½ inch, 13.5 lb/ft
30 ft shoe joint
Float shoe: 11699 ft
Mud: 10.2 lb/gal
Lead cement:, 14.1 lb/gal
Tail cement: 16.5 lb/gal
Top of lead cement = 5550 ft
Top of tail cement = 10499 ft

ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________:
_____________________
_____________________
Exercise 7
Casing: 34 inch, 222.78 lb/ft
Set at 128 ft
Hole: 28 inch drilled to 720 ft
Casing: 18 5/8 inch, 117.5 lb/ft
Float shoe: 655 ft
Mud: 10.2 lb/gal
Lead cement: , 13.2 lb/gal
Tail cement: 15.8 lb/gal
Tail cement = 200 ft annular fill
Lead cement to surface
ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________

Exercise 8
Casing: 9 5/8 inch, 53.5 lb/ft
Set at 7876 Ft
Hole: 9” TD at 10850 ft
Casing: 4 ½ inch, 13.5 lb/ft
Float collar: 10800 Ft
Casing shoe: 10840 Ft
Mud: 10.2 lb/gal
Lead cement:, 14.1 lb/gal
Tail cement: 16.5 lb/gal
Bring tail cement back to 8340 ft
6500 ft annular fill of lead cement

ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________
Exercise 9
Casing: 34 inch, 394.99 lb/ft
Set at 176 ft
Hole: 23 ¾ inch drilled to 842 ft
Casing: 14 inch, 50 lb/ft
Float Shoe: 840 ft
Mud: 10.5 lb/gal
Lead cement: 13.1 lb/gal
Tail cement: 15.6 lb/gal
275 ft tail cement
Circulate lead cement to surface
ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Lead cement:
Hydrostatic factor: _____________________
_____________________
_____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________

Exercise 10
Casing: 4 ½ inch 11.6 lb/ft
Set at 10567 Ft
9 inch OH drilled to 13765 ft
2 7/8 inch, 6.5 lb/ft Tubing
Float collar: 13760 ft
Shoe joint = 40 ft
Mud: 17.8 lb/gal
Tail cement:, 17.5 lb/gal
Bring top of cement to 9500 ft

ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Tubing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________
Exercise 11
Casing: 20 inch, 94 lb/ft
Set at 1567 Ft
Hole: 18.25 inch, drilled to 2576 ft
Casing: 16 inch, 84 lb/ft
Float collar: 2507 ft
60 ft shoe joint
Mud: 12.8 lb/gal
Tail cement: 13.4 lb/gal
Bring top of cement back to 1200 ft
ft3/ft bbl/ft

V&H factor casing & casing: __________________ _________________


V&H factor casing & open hole: __________________ _________________
Casing capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________

Exercise 12 – (Extra Credit)


13.375 inch, 72 lb/ft casing set at 6580 ft
7 inch 26 lb/ft liner from 6330 ft to 7080 ft (previously cemented)
5 ½” 15.5 lb/ft liner run on 3 ½ inch 13.3 lb/ft drill pipe
Liner TD is 7605 ft
Liner tally is 1775 ft
80 shoe joint
6 ¼ inch OH drilled to 7610 ft
13.2 lb/gal mud
14.8 lb/gal Tuned Spacer
Class “G” 16.7 lb/gal
220 ft liner Cap Cement with the DP out

ft3/ft bbl/ft

V&H factor Liner & OH: __________________ _________________


V&H factor Liner & 7: casing: __________________ _________________
V&H factor Liner & 13 3/8 inch: __________________ _________________
V&H factor DP & casing: __________________ _________________
Liner capacity: __________________ _________________
DP capacity: __________________ _________________
Hydrostatic factor mud: _____________________
Hydrostatic factor spacer: _____________________
Tail cement:
Hydrostatic factor cement: _____________________
_____________________
_____________________

*** Extra, Extra Credit ***


What additional factor do you need to complete the calculations for this job?

You might also like