Cement Book / Visualization Exercises: Exercise 1
Cement Book / Visualization Exercises: Exercise 1
Use your CementBook to find the information required to calculate the job. For V&H Factors &
Capacity Factor, give BOTH ft3/ft and bbl/ft.
Exercise 1
Hole: 26 inch; TD 305 ft
Casing: 20inch, 94 lb/ft
Float Shoe: 300 ft
Mud: 8.6 lb/gal
Lead cement 13.2 lb/gal
Tail cement: 15.8 lb/gal
Top of tail cement = 180 ft
Lead cement to surface
ft3/ft bbl/ft
Exercise 2
12 ¼” OH drilled to 815 ft
Casing: 9 5/8inch, 47 lb/ft
Float collar: 771 ft
Float shoe: 813 ft
Mud: 9.1 lb/gal
Lead cement: , 14.0 lb/gal
Tail cement: 16.4 lb/gal
Height of tail cement = 250 ft
Lead cement to surface
ft3/ft bbl/ft
Exercise 4
Hole: 22 ¾ inch, at 930 ft
Casing: 18 5/8 inch 106 lb/ft
Float collar: 896 ft
Float shoe: 926 ft
Mud: 8.6 lb/gal
Lead cemen, 13.2 lb/gal
Tail cement: 16.4 lb/gal
Top of tail cement – 651 ft
Lead cement to surface
ft3/ft bbl/ft
_____________________
Tail Cement:
Hydrostatic Factor Cement: _____________________
_____________________
_____________________
Exercise 5
Casing: 10 ¾ inch, 60.7 lb/ft
Set at 5001 ft
9 inch OH drilled to 9055 ft
Casing: 7 inch, 35 lb/ft
Float collar: 8966 ft
Float shoe: 9026 Ft
Mud: 12.6 lb/gal
Lead cement: Class H + 6% Bentonite, 14.1 lb/gal
Tail cement: Class H + 35% SSA 2, 16.0 lb/gal
Height of tail cement – 1500 ft
Height of lead cement = 3525 ft
ft3/ft bbl/ft
Exercise 6
Casing: 7 5/8 inch 39 lb/ft
Set at 6567 ft
9” OH TD at 11720 ft
Casing: 4 ½ inch, 13.5 lb/ft
30 ft shoe joint
Float shoe: 11699 ft
Mud: 10.2 lb/gal
Lead cement:, 14.1 lb/gal
Tail cement: 16.5 lb/gal
Top of lead cement = 5550 ft
Top of tail cement = 10499 ft
ft3/ft bbl/ft
Exercise 8
Casing: 9 5/8 inch, 53.5 lb/ft
Set at 7876 Ft
Hole: 9” TD at 10850 ft
Casing: 4 ½ inch, 13.5 lb/ft
Float collar: 10800 Ft
Casing shoe: 10840 Ft
Mud: 10.2 lb/gal
Lead cement:, 14.1 lb/gal
Tail cement: 16.5 lb/gal
Bring tail cement back to 8340 ft
6500 ft annular fill of lead cement
ft3/ft bbl/ft
Exercise 10
Casing: 4 ½ inch 11.6 lb/ft
Set at 10567 Ft
9 inch OH drilled to 13765 ft
2 7/8 inch, 6.5 lb/ft Tubing
Float collar: 13760 ft
Shoe joint = 40 ft
Mud: 17.8 lb/gal
Tail cement:, 17.5 lb/gal
Bring top of cement to 9500 ft
ft3/ft bbl/ft
ft3/ft bbl/ft