Rework Record For Heat Treated Parts: Original Production Details

This document records the rework details for heat treated parts, including the original production details, rework details, rework processes, process parameters, and rework results. It provides information such as dates, shift, furnace numbers, heat codes, materials, batch codes, fixture IDs, quantities, reasons for rework, required vs achieved hardness and microstructure results, and disposition of parts not meeting requirements. The document aims to track and approve rework processes for heat treated parts.

Uploaded by

Balram Ji
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
100% found this document useful (2 votes)
1K views

Rework Record For Heat Treated Parts: Original Production Details

This document records the rework details for heat treated parts, including the original production details, rework details, rework processes, process parameters, and rework results. It provides information such as dates, shift, furnace numbers, heat codes, materials, batch codes, fixture IDs, quantities, reasons for rework, required vs achieved hardness and microstructure results, and disposition of parts not meeting requirements. The document aims to track and approve rework processes for heat treated parts.

Uploaded by

Balram Ji
Copyright
© © All Rights Reserved
Available Formats
Download as XLS, PDF, TXT or read online on Scribd
You are on page 1/ 1

Format No.

:
REWORK RECORD FOR Rev No. : 00
HEAT TREATED PARTS DATE-

ORIGINAL PRODUCTION DETAILS


DATE : SHIFT : FURNACE NO (s). :
CUSTOMER : HEAT CODE :
COMPONENT : MATERIAL :
PART NO/DRAWING NO: BATCH CODE :
QUANTITY AFFECTED: FIXTURE ID(s) :
NO. OF FIXTURES :
REASON OF REWORK :

REWORK DETAILS
DATE : SHIFT : FURNACE NO (s). :
REWORK BATCH CODE: QUANTITY REWORKED:
NO. OF FIXTURES : FIXTURE ID(s) :

REWORK PROCESSES TO BE DONE: TEMPERING ONLY / HARDENING & TEMPERING / _______________


PROCESS PARAMETERS:
PARAMETER DESCRIPTION PARAMETER DESCRIPTION
LOADING
LOADING QTY. LOADING PATTERN
HARDENING
F/C TEMPERATURE SOAKING TIME
TOTAL TIME PER BATCH QUENCHING BATH TEMPERATURE
PRE-HEATING TIME TIME IN QUENCHING TANK
TEMPERING
SOAKING. TEMP. (°C) COOLING MEDIA
SOAKING. TIME (MINUTES) COOLING TIME (MINUTES)
REWORK RESULTS :
REQUIRED ACHIEVED OK PARTS (QTY.) NOT OK PARTS (QTY.)
1 HARDNESS (Min./Max. Range)

2 MICROSTRUCTURE
3 OTHER _________________

NOTE : ATTACH SEPARATE HARDNESS, MICROSTRUCTURE OR ANY OTHER REPORT AS EVIDENCE

DISPOSITION ACTION FOR NOT OK PARTS :

VERIFIED BY APPROVED BY