CHB Connection Details: 1.0 General Notes

The document provides construction notes for reinforced concrete structures. It specifies that vertical rebar in CMU walls must be spliced at the top of wall beams with a minimum splice length of 600mm. It also notes that beam rebars should rest on top of girder rebars, and that rebar splices must be located at compression zones of flexural members. Formwork must be provided for all concrete work and removed in a manner that prevents damage to the concrete.

Uploaded by

Sabling Dritzc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views

CHB Connection Details: 1.0 General Notes

The document provides construction notes for reinforced concrete structures. It specifies that vertical rebar in CMU walls must be spliced at the top of wall beams with a minimum splice length of 600mm. It also notes that beam rebars should rest on top of girder rebars, and that rebar splices must be located at compression zones of flexural members. Formwork must be provided for all concrete work and removed in a manner that prevents damage to the concrete.

Uploaded by

Sabling Dritzc
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

1- 16 mm DIAM.

VERTICAL BAR
1.0 GENERAL NOTES:
C. CHB WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL BEAM, OR BEAMS, SPLICE LENGTHS SHALL BE 600 mm MINIMUM

1.1 THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS AND CONDITIONS AT THE SITE, AND SHALL NOTIFY THE ENGINEER OF DISCREPANCIES BETWEEN 2.2.7 UNLESS INDICATED OTHERWISE ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE TOP AND BOTTOM BARS EXTENDING TO THE FAR FACE OF THE
ACTUAL CONDITIONS AND INFORMATIONS SHOWN ON THE DRAWINGS BEFORE PROCEEDING WITH THE WORK. THIS SHALL INCLUDE THE LOCATION AND COLUMN, TERMINATING IN A STANDARD 90° HOOK LENGTH OF ANCHORAGE NOT LESS THAN 600 mm.
DIMENSIONS OF GROOVES, SLEEVES, CURBS, OPENINGS, EMBEDDED OR ATTACHED ITEMS.

2.2.8 SHOP DRAWINS FOR BENDING AND CUTTING OF REINFORCEMENT SHALL BE SUBMITTED FOR APPROVAL TO THE ENGINEER ON SITE.
1.2 ALL DIMENSIONS SHALL TAKE PRECEDENCE OVER SCALE SHOWN ON PLANS, SECTIONS OR DETAILS. NOTES AND DETAILS ON DRAWINGS SHALL TAKE
PRECEDENCE OVER GENERAL NOTES AND TYPICAL DETAILS.
2.2.9 RE-BAR SPLICES SHALL BE AT POINT OF COMPRESSION ZONE OF ANY FLEXURAL MEMBER.

1.3 THE STRUCTURAL DRAWINGS AND SPECIFICATIONS REPRESENT THE FINISHED STRUCTURES. THEY DO NOT INDICATE THE METHODS CONSTRUCTION UNLESS SO
12 mm THK EXPANSION JOINT WITH STATED. THE CONTRACTOR SHALL PROVIDE ALL NECESSARY MEASURES TO PROTECT THE STRUCTURES, ADJACENT PROPERTIES, WORKMEN AND OTHER PERSONS 2.2.10 BEAM RE-BARS SHOULD REST ON TOP OF GIRDER RE-BARS.
MASTIC FILLER DURING ALL PHASES OF CONSTRUCTION. THE CONTRACTOR SHALL IMMEDIATELY NOTIFY THE OWNER AND/OR THE ENGINEER OF ANY CONDITION WHICH IN HIS
OPINION MIGHT ENDANGER THE STABILITY OF THE STRUCTURES OR CAUSE DISTRESS IN THE STRUCTURES.
2.3 FORMWORKS

1.4 CONSTRUCTION MATERIALS SHALL NOT BE STORED ON POURED FLOORS. IT IS THE GENERAL CONTRACTOR'S RESPONSIBILTY TO ENSURE THAT THE 2.3.1 FORMS SHALL BE PROVIDED FOR ALL CONCRETE NOT INDICATED OR SPECIFIED OTEHRWISE. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE
SUB-CONTRACTOR ARE INFORMED AND DO NOT VIOLATE THIS IMPORTANT REQUIREMENT. ADEQUACY OF FORMS AND FORM SUPPORTS. ALL FORMWORKS SHALL BE PROVIDED WITH ADEQUATE CLWAN-OUT OPENINGS TO PERMIT INSPECTION
AND EASY CLEANING AFTER ALL REINFORCEMENT HAS BEEN PLACED. ALL FORMS SHALL BE CONSTRUCTED SO THAT THEY CAN BE REMOVED
WITHOUT DAMAGING THE CONCRETE.
1.5 THE CONTRACTOR SHALL PROVIDE TEMPORARY ERECTION BRACINGS AND SHORING FOR ALL THE STRUCTURAL MEMBERS AS REQUIRES FOR STRUCTURE
FOR SIZE AND SPACING OF HORIZONTAL AND STABILITY DURING ALL PHASES OF CONSTRUCTION.
2.3.2 FORMS SHALL BE REMOVED IN A MANNER WHICH WILL PREVENT DAMAGE TO THE CONCRETE. FORMS SHALL NOT BE REMOVED, WITHOUT APPROVAL
VERTICAL BARS (SEE CONSTRUCTION NOTES) OF THE ENGINEER, OR BEFORE EXPIRATION OF THE MINIMUM PANELS SPECIFIED HEREIN:
1.6 THE CONTRACTOR SHALL TAKE ALL STEPS NECESSARY TO ENSURE THE PROPER ALIGNMENT OF THE STRUCTURES AFTER THE INSTALLATION OF ALL STRUCTURAL
AND FINISH MATERIALS.
CHB WALL DAYS AFTER PLACING
SIDEFORMS ON BEAMS, GIRDERS
DESIGN CRITERIA AND COLUMNS (LIFTS, 4.5 m AND UNDER) 1
2.0 REINFORCED CONCRETE
FORMS FOR COLUMNS
(LIFTS OVER 4.5 m) 2
2.1 NORMAL WEIGHT CONCRETE:
CHB WALL
SUPPORTING FORMS FOR SLABS, BEAMS, GIRDERS 14
2.1.1 CONCRETE USED IN THIS WORK SHALL HAVE MINIMUM COMPRESSIVE STRENGTH @ 28 DAYS AS FOLLOWS:
SUFFICIENT SHORING TO SUPPORT THE DEAD LOAD PLUS CONSTRUCTION LOADS ON BEAMS, GIRDERS AND SLABS SHALL BE PROVIDED FOR A PERIOD OF 14
RC TANK STRUCTURES 21.O Mpa (4000 Psi) DAYS IN ADDITION TO THE 14 DAYS SPECIFIED HEREIN, PROVIDED ALL CONCRETE TEST RESULTS HAS SHOWN SUFFICIENT STRENGTH FOR 28 DAYS.
FOOTING-TIE-BEAMS, BEAMS, GIRDERS
1- 16mm DIAM. VERTICAL BAR AND SUSPENDED SLAB FOR BUILDINGS 21.0 Mpa (4000 Psi)
COLUMNS FOR BUILDINGS 21.0 Mpa (4000 Psi) 3.0 STRUCTURAL STEEL/ ANCHOR BOLTS/BOLTS WELDS AND WELDMENTS
ISOLATED FOOTINGS, PILE CAP 21.0 Mpa (4000 Psi)
SLAB ON FILL FOR BUILDINGS 21.0 Mpa (4000 Psi)
3.1 ALL STRUCTURAL STEEL SHALL HAVE A MINIMUM YIELD STRENGTH, Fy= 248 MPa (36000 PSI) AND SHALL CONFORM TO ASTM A 36 SPECIFICATIONS.

2.1.2 ALL CONCRETE SHALL BE DEPOSITED, VIBRATED AND CURED IN ACCORDANCE WITH ACI STANDARD 318-95.
3.2 ALL STRUCTURAL STEEL SHALL BE FABRICATED AND ERECTED IN ACCORDANCE WITH THE AISC SPECIFICATIONS AND CODE OF STANDARD PRACTICE AS
2.1.3 MINIMUM CINCRETE COVER FOR REINFORCING BARS SHALL BE AS FOLLOWS: AMENDED TO DATE.

A. FOOTINGS AND BOTTOM OF FOOTING TIE BEAMS 75 mm (CAST AGAINST EARTH) 3.3 ALL COLD FORMED STEEL SHALL HAVE A MINIMUM YIELD STRENGTH, Fy= 227 MPa (36000 PSI)
B. SIDES OF FOOTING TIE BEAMS= 50 mm (CAST AGAINST FORMS)
C. BEAMS, COLUMNS = 40 mm (TO STIRUUPS AND TIES)
D. SLAB= 20 mm (CAST AGAINST FORMS) 3.4 NO STEEL SHALL BE FABRICATED OR ERECTED UNLESS SHOP DRAWINGS HAVE BEEN APPROVED BY THE STRUCTURAL ENGINEER.
E. WALLS= 50 mm
12 mm THK. EXPANSION JOINT
FILLER MASTIC 3.5 ALL SHOP AN FIELD WELDING SHALL BE IN ACCORDANCE WITH AWS D.1.1 AND PERFORMED BY QUALIFIED WELDERS.
2.1.4 BEFORE CONCRETE IS POURED, CHECK WITH ALL TRADES TO ENSURE PROPER PLACEMENT OF ALL OPENINGS, SLEEVES, CURBS, CONDUITS, ETC. RELATIVE TO THE
WORK.
3.6 UNLESS INDICATED OTHERWISE, WELDING ELECTRODES SHALL BE E70XX, MINIMUM THICKNESS OF WELD SHALL BE 3 mm.

2.1.5 BEAMS AND GIRDER GREATER THAN FOUR METER OF ITS CLEAR SPAN, SHALL BE CAMBERED TO AT LEAST 1.5mm PER METER OF ITS SPAN.
FOR SIZE AND SPACING OF HORIZONTAL AND 3.7 UNLESS OTHERWISE INDICATED ALL ANCHOR BOLTS SHALL CONFORM TO ASTM - A307 SPECIFICATIONS.
VERTICAL BARS ( SEE CONSTRUCTION NOTES) 2.1.6 CONSTRUCTION JOINTS FOR BEAMS, GIRDERS AND SLABS SHALL BE LOCATED AT POINTS OF ZERO SHEAR.
4.0 MASONRY WORKS

2.1.7 ALL CONSTRUCTION JOINTS OF ALL CONCRETE TANKS SHALL BE PROVIDED WITH WATER STOPS. 4.1 CHB USED IN THESE WORKS SHALL HAVE A MINIMUM ULTIMATE COMPRESSIVE STRENGTH @ 28 DAYS AS FOLLOWS:

2.2. REINFORCING BARS: 100 mm THICK NON-LOAD BEARING CHB, f'm= 2.41 MPa (350 PSI)
150 mm THICK NON-LOAD BEARING CHB, f'm= 2.41 MPa (350 PSI)
CHB CONNECTION DETAILS 2.2.1 UNLESS OTHERWISE SPECIFIED ON PLANS, ALL REINFORCING BARS SHALL BE DEFORMED WITH A MINIMUM YIELD STRENTGH,
AS FOLLOWS: 4.2 ALL CELLS SHALL BE SOLIDLY FILLED WITH GROUT. CONCRETE SHALL HAVE A MINIMUM COMPRESSIVE STRENGTH OF 17.20 MPa (2500 PSI) @ 28 DAYS.
SCALE NTS Ø16 mm OR GREATER 414 Mpa (60000 Psi)
Ø10 mm TO Ø12 mm 275 Mpa (40000 Psi)
4.3 UNLESS INDICATED OTHERWISE, REINFORCEMENT SHALL BE 10 mm DIAM. HORIZONTAL BARS @ 400 AND 12 mm DIAM. VERTICAL BARS @ 600 mm.

2.2.2 ALL REINFORCING BARS SHALL BE CLEANED OF RUST, GREASE OR OTHER MATERIALS WHICH TEND TO IMPAIR BOND.
4.4 UNLESS OTHERWISE INDICATED, PROVIDE CHB COLUMN AT EVERY THREE TO SIX METERS SPACING. AS SHOWN BELOW:

2.2.3 ALL REINFORCING BARS SHALL BE ACCURATELY AND SECURELY PLACED BEFORE POURING CONCRETE OR APPLYING MORTAR OR GROUT 400

2.2.4 LAPPED SPLICES SHALL BE STAGGERED AS POSSIBLE. 6- 12 mm DIAM. RE-BAR WITH 10 mm DIAM.
TIES @ EVERY 200 mm SPACING
CONCRETE SLAB
2.2.5 UNLESS INDICATED OTHERWISE, SPLICING OF REINFORCEMENT SHALL BE IN ACCORDANCE WITH ACI- 318M- 95.
NATURAL GRADE LINE 3- D12 CONT. BARS
4.5 PROVIDE EXPANSION JOINT CONTROL JOINT TO ALL MASONRY COLUMN AND GIRDER CONNECTION.
D12- REBARS SPACED 2.2.6 UNLESS HOWN OTHERWISE ON PLANS, SPLICES SHALL BE AS FOLLOWS:
@ 300mm O.C.
VERIFY HEIGHT

5.0 FOUNDATIONS:
A. BEAMS AND FOOTING TIE BEAS: TOP AND BOTTOM BARS SHALL NOT BE SPLICED WITHIN THE COLUMN OR WITHIN A DISTANCE OF TWICE THE MEMBER DEPTH
FROM THE FACE OF THE COLUMN; AT LEAST TWO EXTRA STIRRUP- TIES SHALL BE PROVIDED AT ALL SPLICES.
5.1 FOOTINGS AND TANKS, MAT FOUNDATIONS WERE DESIGNED USING A GROSS ALLOWABLE SOIL BEARING CAPACITY AS INDICATED ON THE GEOTECHNICAL
REPORT. CONFIRMATION OF ACTUAL SOIL BEARING CAPACITY SHALL BE DONE PRIOR TO CONSTRUCTION OF FOUNDATION. INCREASE IN FOUNDATION
B. COLUMNS: SPLICES WHEN PERMITTED SHALL BE MADE WITHIN THE CENTER BAR DIAMTERS. THE USE OF APPROVED MECHANICAL DEVICES MAY BE SPLICED SIZE AND DEPTH SHALL BE DONE WHEN THE ACTUAL SOIL BEARING CAPACITY CONFIRMED DURING EXCAVATION WARRANTS REVISION OF FOUNDATION
AT ANY LEVEL AND THE MINIMUM VERTICAL DISTANCE BETWEEN TWO ADACENT BAR SPLICES SHALL BE 600 mm. SIZES.
D12 HORIZONTAL AND
VERTICAL BARS SPACED
@ 600 mm O.C. BOTHWAYS C. CHB WALLS: VERTICAL BARS SHALL BE SPLICED AT THE TOP OF WALL BEAM, OR BEAMS, SPLICE LENGTHS SHALL BE 600 mm MINIMUM 5.2 STRICTLY NO FOUNDATION SHALL REST ON FILL UNLESS INDICATED ON PLANS.
D12- CONT. BARS 2.2.7 UNLESS INDICATED OTHERWISE ALL BEAMS TERMINATING AT THE COLUMN SHALL HAVE TOP AND BOTOOM BARS EXTENDING THE FAR FACE OF THE COLUMN,
200

TERMINATING IN A STANDARD 90° HOOK LENGTH OF ANCHORAGE NOT LESS THAN 600 mm. 5.3 BACKFILL SHALL BE PLACED IN 200 mm LAYERS AND EACH LAYER SHALL BE COMPACTED TO 95 PERCENT MAXIMUM DRY DENSITY BEFORE SUBSEQUENT
150 mm THK CHB LAYERS ARE TO BE LAID.
1OO mm THK.
GRAVEL BEDDING
2.2.8 SHOP DRAWINGS FOR BENDING AND CUTTING OF REINFORCEMENT SHALLL BE SUBMITTED FOR APPROVAL TO THE ENGINEER ON SITE.
5.4 ANY DISCREPANCIES, REGARDING THE SOIL TYPE ENCOUNTERED DURING EXCAVATION SHALL BE REPORTED TO THE GEOTECHNICAL ENGINEER.

WF-1 2.2.9 RE-BAR SPLICES SHALL BE AT POINT OF COMPRESSION ZONE OF ANY FLEXURAL MEMBER.
5.5 ALL FOUNDATION SHALL BE TREATED WITH SOIL POISONING SOLUTION.

WALL FOOTING DETAILS 2.2.10 BEAM RE-BARS SHOULD REST ON TOP OF GIRDER RE-BARS.

SCALE NTS

STRUCTURAL DETAIL(TYPICAL)
S 5 SCALE NTS

ARCHITECT: ALLIED ENGINEERS: OWNER/ APPROVED: PROJECT TITLE: SHEET CONTENTS: DATE REVISIONS: RA 9266, SEC 33. SCALE: AS SHOWN PROJECT I.D. NO.

CADD:
STRUCTURAL DETAIL
MR. AND MRS KIDO 2 STOREY WITH BASEMENT RESIDENTIAL BUILDING GENERAL NOTES
CHECKED: SHEET NO. TOTAL SHEET
DESIGN CRITERIA
PRC LIC. NO.: PTR NO.: PRC LIC. NO.: PTR NO.:
S
11
DATE:
DATE ISSUED: TIN NO.: DATE ISSUED: TIN NO.:

PLACE ISSUED: IAPOA NO.: PLACE ISSUED: ADDRESS: CAMP 7, BAGUIO CITY LOCATION: ENGINEERS HILL,BAGUIO CITY INFO BID PERMIT CONSTRUCTION FILE: 5