NCC Spherical Bearing Method Statement Draft
NCC Spherical Bearing Method Statement Draft
CONSTRUCTION WORK
PROCEDURE FOR
Document No:
Works at
Stations Depots Viaduct Casting yard
√
Discipline
Civil Mechanical Electrical General
√
NCC LIMITED Quality Assurance Plan
NAGPUR METRO RAIL
PROJECT (VIADUCT) Page 2 of 15 ( Rev- 01)
Construction work procedure for Installation of Spherical Bearings
CONTENTS
01 Scope 3
02 Function 3
03 Reference 3
04 Staff Responsibility 3
05 Purpose 3
06 Materials 4
07 Manpower 4
09 Sequence of activities 5
11 Weather limitations 7
12 Inspection plan 7
1. Scope:
This Method statement covers the material used in manufacturing of Spherical Bearing & Its
Installation.
2. Function:
This bearing only takes care of vertical load and horizontal force due to sliding friction. The
bearing will permit uniaxial translatory movement along longitudinal axis of the bridge and rotation
along all axes.
3. Reference :
4. STAFF RESPONSIBILITIES:-
The responsibility for correct and safe execution of the works falls within the Project in-charge with
delegated responsibility to the Section Manager. The section Manager further delegate
responsibility to engineer & Supervisor.
The entire operation shall be carried out under supervision of well trained and experience personal
S. Name Designation
n
o
1 Launching Engineer
2 Supervisor/Foreman
3 Rigger:
4 Mechanic:
5 Surveyor:
5.PURPOSE:-
The purpose of this procedure is to describe the installation of the Spherical bearing supporting the
standard spans and the horizontal adjustment of these spans which will be erected by launching
gantry using the span by span method.
S. Conforms
Name Brand / Source Remarks
N to
o. Conbextra
GP2,or any
Non Shrinkable equivalent ASTM
1
Grout Approved Source C1107
IRC 83
2 Spherical Bearing
Approved Source part IV
As per
Plywood Shutters Drawing
6 -
7. MAN POWER:
9. SEQUENCE OF WORK:
Delivery Inspection & Storage of Spherical Bearing on Site after Surface preparation.
Educating team about Construction Work Procedure (CWP).
Cleaning of all-round the pier &pier cap top and bearing pedestal top.
Cleaning of all sleeve holes.
Measurement of sleeve holes depth.
Corrective measures if any variation in sleeve depth.
Packing of Jack.
Alignment of span by surveyor.
Before placing of the bearing check the Markings around the bearing as per IRC-83 Part IV(Page
33,clause no 7.8)
Placing of bearing over pedestal.
Fixing of bearing with segment bottom.
Fixing of bearing with pedestal Top.
Grouting of bearing at bottom and top including sleeve holes and in-between gaps.
De-shuttering.
Curing.
The construction team shall be educated about the approved Construction Work Procedure
(CWP) by Construction manager.
The factory made Spherical bearings duly approved, tested and inspected by third consultant for
use shall be delivered to site. Each Spherical bearing shall be clearly labeled and marked. The
Bearing shall be wrapped in a cover. They shall be packed in crates with suitable arrangement to
prevent movement and to protect corners and edges. Care shall be taken to avoid any damage,
contamination with oil, grease, dirt, and undue exposure to sunlight and weather.
The concrete surface of the Pedestal in contact with Spherical bearing shall be cleaned and
smoothened before installation of Spherical bearing. It shall be cleaned to remove any loosely
adherent material, grease & oil so as to form a proper bonding between the concrete and Spherical
bearing. Soak the grouting concrete area with fresh potable water 4 hours before grouting and
remove the free water before grouting starts, using sponge.
Before starting the permanent bearings installation and span adjustment check.
The spherical bearing has been checked and approved by client.
That the horizontal surface of the elastomeric bearing is cleaned of grease/dust/sand.
Installation of multiple bearing one behind the other on a single line of support should have same
dimension .
Bearing placed between true horizontal surfaces (Max. Tolerance 0.2 % perpendicular to the load)
and at true plan position of their control line marked on receiving surface (Max. Tolerance +/-3
mm).
Concrete surfaces shall be free from local irregularities (Max. Tolerance +/-3 mm in height).
Design shall be checked for the actual inclination in seating if accuracy deviated more than
specified limit.
Cast in place formwork around the bearings shall be soft enough for its easy removal. From shall
also fit the bearings snugly and prevent any leakage of mortar grout. Mortar contaminating the
bearing during concreting shall be completely removed before setting.
If the bearing are to be installed on pre-cast concrete or steel super structure elements, epoxy resin
adhesive may be applied on interface, after proper surface preparation.
Installation of multiple bearing one behind the other on single line of support should have some
Dimensions.
Bearing placed between the horizontal surface (Max tolerance 0.2% perpendicular to land and the
true plan position of their control line marked on receiving surface (Max. Tolerance +/-3mm)
D-If correction is more than 25 mm the existing pedestal shall be broken from top up to the
Reinforcement level and it shall be re-casted with micro concrete up to desired level. Before
application of micro concrete over old existing concrete the existing surface shall be kept moist
and coat of NITOBOND EP shall be applied to from a firm bond between both old and new
Concrete.
D-If pedestal level is more than required the grinding of concrete surface shall be done for 6-8 mm
Design shall be checked for the actual inclination in seating if accuracy deviated more the specified
limit.
For fixing of bearing on down gradient and up gradient, the bearing shall be glued to down stand
With rubber solution adhesive or with clamping arrangement of bearing giving bottom support.
The span shall be then the lifted to required level and the gap be filled with EP-75 or with GP2 as
Applicable and stated above. Final load to given only after 24 hours for EP-75 and 24 hours for
GP2.
If the bearing is to be installed precast concrete or steel superstructure elements, epoxy resin
Adhesive may be applied on interface after proper surface preparation.
8. Check the survey and adjust the span transverse position and longitudinal position.
The Spherical bearing shall be positioned and placed on the Concrete Pedestal as per drawing. The
bearing shall be aligned to the line and level approximately to final requirement.
10.7 Curing
Immediately after De shuttering is completed, the bearing grout shall be cured with Hessian cloth or
for seven days.
M
an
Ac T
uf
ce e
act R
pt st
ur e Exte
an in
Mat er’ vi nt of
Si.n Ite ce g
erial s e Insp Remarks
ms St F
s Qu w ecti
an a
ali b on
da ci
ty y
rd lit
Co
s y
nt
rol
Verification of raw material test certificates
a)Ro Bot IS: On In In Rev The MTC
lled to 20 e d s iew shall be
Stee m/ 62 sa e p of furnished
l call - m p e Int during
ote 20 pl e ct ern Inspectio
/To 11 e n in al n,
p ,Gr for d g Doc However,
Plat :E M e A um in
e/G 35 ec nt ut ent absence
uid 0 h. L h s of MTC
e BR & a o ,Laborato
Bar Ch b ri ry test
/Bo e o ty certificate
tto m. ra s shall be
m Te to furnished
Lug st r for
/To ( If y review.
p M (
Anc TC If
hor is M
Plat no T
e/B t C
ott av is
om ail n
Anc ab ot
hor le) a
Plat v
e/B ai
ott la
om bl
Upl e)
ift
Cla
w/
To
p
Up
lift
Cla
w
IS:
20
62
b)R -
olle 20
d Key 11
Stee ,Gr
l :E
35
0
BR
c) AI
Stai Slid SI:
nles ing 31
s Plat 6/
Stee e 31
l 6L
Bo
lt:
IS
O
40
14
,Cl
:8.
8
(H
Bol DG
d)
t& )
Fast
Nut &
ener
s Nu
t
:IS
O
40
32
,cl:
10
(H
DG
)
Ty
pe
ET -
e) Slid
A- 3.
Rob ing
08 2 N
o Mat
/0 Ce A
Slid eria
11 rti
e l
5 fic
at
e
Si.n Activity Ac M T W Ext Remarks
o ce an e it ent
n
e
uf ss
act e
st
ur d
pt in
er’ / of
an g
s R Ins
ce F
Qu e pec
Cri a
ali vi tio
ter ci
ty e n
ia lit
Co w
y
nt e
rol d
b
y
Physical checking of the steel component
a) Plan Dimension As 10 M In Rev Internal
b) Individual Thk. pe 0 a s iew Report
Of the r % g p of shall be
Component Ap (In e e Int furnished
c)Dia of Robo pr ter b ct ern for
Slide ov na a in al review.
ed l) B g Doc However,
Dr ri A um randomly
aw d ut ent may be
in g h and checked
g e o dim in
& P ri ens presence
IR r ty ion of
d)Radius of
C- o che Inspectin
Curvature for
83 d ck g
Convex Surface
(P u Authority
art ct
- s
IV P
) vt
Lt
d.
M
a
n
T
uf
e
ac
s
tu
t
re
i Witn
r’
Accept n essed Exten
s
Si.n ance g / t of Rema
Activity Q
Criteri F Revie Inspe rks
u
a a wed ction
al
c by
it
il
y
i
C
t
o
y
nt
ro
l
Checking after Assembly of the Bearing:
a) Overall M
Height a
g
e
b Re
Howeve
a vie
r, test
B w
test may
r of
be
i Int
carried
1 d er
out in
0 g nal
presenc
0 e Do
Acc. to e of
% P Inspe cu
approv Inspecti
(I r cting me
ed ng
nt o Auth nt
b) Tilting Gap Drawin Authorit
er d ority an
g y. The
n u d
test
al c di
frequen
) t me
cy is
s nsi
shown
P on
in the
v ch
above
t ec
Table.
L k
t
d
.
.
M
a
n
T
uf
e
ac
s
tu
t
re
i Witn
r’
Accept n essed Exten
s
Si.n ance g / t of Rema
Activity Q
Criteri F Revie Inspe rks
u
a a wed ction
al
c by
it
il
y
i
C
t
o
y
nt
ro
l
Checking after Assembly of the Bearing:
a) Vertical Load IRC-83 Fi M Inspe Wi Howeve
Test @1.1 ( Part- n a cting tn r, test
times design IV),Cl:7 al g Auth es test may
SLS Load .5 T e ority sin be
( for all types es b g carried
of bearing) t a tes out in
c) Coefficient of o B t presenc
friction n r an e of
@design SLS th i d Inspecti
load ( for free e d re ng
and Guided
bearing)
d) Combined
Load test
@1.1times
SLS load(for
Guided
bearing)
as g vie Authorit
se e w y. The
e) Rotation test
m P of test
@ design SLS
bl r do frequen
load (for all
e o cu cy is
types of
d d me shown
bearing)
b u nt in the
e c above
ar t Table.
in s
gs P
d v
u t
ri L
n t
g d
In .
s .
p
NCC LIMITED Quality Assurance Plan
NAGPUR METRO RAIL
PROJECT (VIADUCT) Page 11 of 15 ( Rev- 01)
Construction work procedure for Installation of Spherical Bearings
a. Daily safety pep talk shall be given by Construction Manager to the staff and workmen.
b. Before commencement of the work, Construction work Procedure shall be explained to the staffs.
Sl.
Format / Check List no. Format / Check list description
no
Safety System
Quality System