0% found this document useful (0 votes)
363 views

21FB0082 Boq

This document is a bill of quantities for a construction project to build a flood mitigation system along the Taysan River in Legazpi City, Albay, Philippines. It outlines various items, quantities, units, and costs for earthworks, bank and slope protection works, and drainage works. These include clearing and grubbing 1,005 square meters, placing 3,182 cubic meters of excavated soil, installing 4,222 cubic meters of grouted riprap, and putting in 16 linear meters of pipe culverts. The total amount for the project is calculated at the bottom.

Uploaded by

CelsoRapi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
363 views

21FB0082 Boq

This document is a bill of quantities for a construction project to build a flood mitigation system along the Taysan River in Legazpi City, Albay, Philippines. It outlines various items, quantities, units, and costs for earthworks, bank and slope protection works, and drainage works. These include clearing and grubbing 1,005 square meters, placing 3,182 cubic meters of excavated soil, installing 4,222 cubic meters of grouted riprap, and putting in 16 linear meters of pipe culverts. The total amount for the project is calculated at the bottom.

Uploaded by

CelsoRapi
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Page 1 of 2

Republic of the Philippines


Department of Public Works and Highways
Albay 2nd District Engineering Office
RES V Compound, Airport Site, Legazpi City

002-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems


Construction of Flood Mitigation System along Taysan River (Sitio Pulot -
Malangka Section), Legazpi City, Albay

BILL OF QUANTITIES

ItemNo. Description Quantity Unit Unit Cost Total

PART I FACILITIES FOR THE ENGINEER


Provision of Field Office for the Engineers (Rental
Basis) at
A.1.1(8) ____________________________________________ 6.00 mo.
____________________________________________
_______________________ per mo.
PART II OTHER GENERAL REQUIREMENTS

Project Billboard / Signboard at


____________________________________________
B.5 2.00 each
____________________________________________
_______________________ per each

Project Billboard / Signboard at


____________________________________________
B.7(2) 1.00 l.s.
____________________________________________
_______________________ per l.s.

Mobilization / Demobilization at
____________________________________________
B.9 1.00 l.s.
____________________________________________
_______________________ per l.s.

TOTAL OF PART II
PART H MISCELLANEOUS STRUCTURES

Trees Furnishing and Transplanting at


____________________________________________
611(1) 300.00 ea
____________________________________________
_______________________ per ea

TOTAL OF PART H

PART J FLOOD CONTROL AND DRAINAGE

PART I-A EARTHWORKS

Removal of Structures and Obstruction, Concrete at


____________________________________________
801(6) 38.00 cu.m.
____________________________________________
_______________________ per cu.m.

Clearing & Grubbing at


____________________________________________
1700(1) 1,005.00 sq.m.
____________________________________________
_______________________ per sq.m.

Individual Removal of Trees, 301-500mm dia. at


____________________________________________
1700(3)a2 3.00 ea.
____________________________________________
_______________________ per ea.

Surplus Common Excavation at


____________________________________________
1701(2) 3,182.00 cu.m.
____________________________________________
_______________________ per cu.m.

Structure Excavation at
____________________________________________
1702(1)a 670.00 cu.m.
____________________________________________
_______________________ per cu.m.

Embankment from Roadway/Structure Excavation at


____________________________________________
104(1)a 536.00 cu.m.
____________________________________________
_______________________ per cu.m.

TOTAL OF PART I-A

PART I-B BANK AND SLOPE PROTECTION WORKS

Grouted Riprap, Class A at


____________________________________________
1710(2)a 4,222.00 cu.m.
____________________________________________
_______________________ per cu.m.
Page 2 of 2
Republic of the Philippines
Department of Public Works and Highways
Albay 2nd District Engineering Office
RES V Compound, Airport Site, Legazpi City

002-Construction/ Maintenance of Flood Mitigation Structures and Drainage Systems


Construction of Flood Mitigation System along Taysan River (Sitio Pulot -
Malangka Section), Legazpi City, Albay

BILL OF QUANTITIES

ItemNo. Description Quantity Unit Unit Cost Total

Bed Course Granular Material at


____________________________________________
1712(1) 504.00 cu.m.
____________________________________________
_______________________ per cu.m.

Concrete Slope Protection at


____________________________________________
1712(2) 575.00 cu.m.
____________________________________________
_______________________ per cu.m.

Sheet Pile, Steel, Slope Protection at


____________________________________________
1717(2)a1 6,700.00 l.m.
____________________________________________
_______________________ per l.m.

Sheet Pile, Steel, Cofferdamming at


____________________________________________
1717(2)a2 672.00 l.m.
____________________________________________
_______________________ per l.m.

TOTAL OF PART I-B

PART I-C DRAINAGE WORKS

Pipe Culverts at
____________________________________________
1718(1) 16.00 l.m.
____________________________________________
_______________________ per l.m.

Railings at
____________________________________________
1722(2) 14.00 l.m.
____________________________________________
_______________________ per l.m.

TOTAL OF PART I-C

Total Amount in Figures


Total Amount in Words

Contractor
Signature

You might also like