21FB0082 Boq
21FB0082 Boq
BILL OF QUANTITIES
Mobilization / Demobilization at
____________________________________________
B.9 1.00 l.s.
____________________________________________
_______________________ per l.s.
TOTAL OF PART II
PART H MISCELLANEOUS STRUCTURES
TOTAL OF PART H
Structure Excavation at
____________________________________________
1702(1)a 670.00 cu.m.
____________________________________________
_______________________ per cu.m.
BILL OF QUANTITIES
Pipe Culverts at
____________________________________________
1718(1) 16.00 l.m.
____________________________________________
_______________________ per l.m.
Railings at
____________________________________________
1722(2) 14.00 l.m.
____________________________________________
_______________________ per l.m.
Contractor
Signature