79% found this document useful (19 votes)
37K views

PDF Agile E0 Key With Answers PDF

1) Design Thinking is about finding the right solutions and Agile is about building the right solutions. 2) The team must collectively agree on the Sprint length based on business need and technical ability, up to a maximum of one month. 3) Kris should upskill in Agile roles and practices to help TCS adopt Agile.

Uploaded by

tarantula_22
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
79% found this document useful (19 votes)
37K views

PDF Agile E0 Key With Answers PDF

1) Design Thinking is about finding the right solutions and Agile is about building the right solutions. 2) The team must collectively agree on the Sprint length based on business need and technical ability, up to a maximum of one month. 3) Kris should upskill in Agile roles and practices to help TCS adopt Agile.

Uploaded by

tarantula_22
Copyright
© © All Rights Reserved
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 12

S.

No Questions PLEASE USE THE ANSWERS MARKED IN GREEN Correction First set
1 Which of the following statements are correct  Agile
 Agile and Design
Design Thinking
Thinking are same
same
Design Thinking is about Product Devopment Agile Manifesto is about Software
Devopment ok
 Design Thinking is finding the right things and Agile is about building the right
things
 Design Thinking is building the right things and Agile is about finding the right
things

Sprints must be 30 days always


Which of the following BEST describes the Product Owner unilaterally decides the duration of Sprint
2 approach for determining the Sprint length in Sprints must be two weeks always
Scrum? The team must collectively agree on the length of the Sprint based on business
need and technical team's ability; subject to a maximum of one month
There is no rule on Sprint duration

team. He has acquired knowledge by reading Scrum Master Accredited Certificate (SMAC)
3 multiple sources. After practicing Scrum for a while SAFe Agilist (SA)
on the job, he is looking for a certification to Professional Scrum Master I (PS/VI I) ok

Test Driven Development


Extreme Reviews First
4 Which one of these is NOT an XP practice? Pair Programming
Continuous Integration
Refactoring

Has no control over the prioritization of Product Backlog Items


Has the final authority over the prioritization of Product Backlog Items
Collaborates with the developers over prioritization of Product Backlog Items, but
5 The Product Owner in a Scrum project … the developers have the final say
Collaborates with the developers over prioritization of Product Backlog Items, but
Product Owner has the final say
Creates the Product Backlog Items but leaves prioritization to Business Analyst

Proactively up-skill with skills needed to work in Agile Roles

Kris is an experienced Project Manager with a No need to do anything as he can continue to be the Project Manager 
customer project where he commands the teams
and micro manages the team members at task level.
6 How can he help the TCS Agile vision? Wait till his current customer adopts Agile
TRUE
7 aily Scrum is NOT recommended for collocated team
FALSE

Lee joins a project team that attempts to build a


consumer device with embedded software_ The
team is adopting 2-week sprint Lee notices that the  Apply design thinking first for initial phase and then bring in Agile later 
project must produce an outcome that will be highly
adoptable by the users to become successful. After 
More practices from Extreme Programming
every Sprint Review, the Product Owner keeps
changing the Product vision and makes
contradictory statements about user needs. What
8 can be suggested for this environment?  Apply waterfall and have the Product Owner sign-off on the requirements

The Scrum Master manages the people so they can complete the work
The team manages the work by self-organization
9 Who manages the team's work during a Sprint?
The Product Owner manages the work
The Delivery Manager manages the work

• 4,10
• 6, 12
10 Agile Manifesto has ... Values and ..... Principles
• 4.12
• 4.4

Agile Teams need to comply by the Agile Values and TRUE


11 Principles but have flexibility to choose appropriate
value-adding practices
FALSE

It allows the team to take a necessary break from work


It gives management information to use in team members' performance reviews
Provides an opportunity for the Scrum Team to inspect itself and create a plan for 
12 he reason for holding regular Sprint Retrospective is improvements to be enacted during the next
Sprint.
 Retrospectives are optional
Provides an opportunity for stakeholders to look at what the team is building

Feedback
'
  oors crum eam a a great pr nt ev ew o a
new feature with their Product Owner. Product
Owner was happy with new feature, and wanted to
release the feature to user_ But, the Scrum Team
cannot do it themselves because production
13
environment is owned the company's IT operations
team_ Scrum Team was directed to create a ticket
with IT operations for production release_ and wait
Flow First
a week for an Ops engineer to manually Work on the
ticket What is missing in this environment?
Continuous Improvement

Small but have enough members to create the Product Increment


Collaborate with each other to self-organize their work
14 What BEST describes a Scrum Team? Team members must be specialists
Cross Functional
Reports to Product Owner 

.
Agile vision. he was recommended to attain EID Martin is right. Agile principles are not useful outside software development
15 competency in Agile. Martin Was thinking that Agile XP and DevOps can help in Robotic Process Automation ok
was only for software. How could Agile knowledge  Agile principles can help in continuously improving BPS processes First

The team must discuss the problems encountered in the earlier project

Team chooses the Product Backlog Items to work in the Sprint and crals a Sprint
A team is having the first Sprint Planning meeting_ 
Goal. First
16 What are the activities that the team must perform
Team must draw up the Release Plan for the final product
during the meeting?
Each team member should come prepared with their version of the plan
The team must look at the project plan prepared by the Product Owner and
understand their tasks

For last few years, there is a double digit increment in number of Agile projects
(per PMS) year on year 
Increasing number of TCS customers are moving to In 90% of executive conversations, customers bring in Agile as a topic of 
17 the Agile way of working. Why is this a true conversation Ok
statement? For all new engagements. TCS mandates Agile
This is not a true statement
Both 1 and 2

TRUE ok
18 Sprint itself is an event in Scrum
FALSE
a Scrum Team where the Scrum Master is Magneto. Be prepared to face such anti patterns and work together with the team to
Contrary to his expectation of Scrum Master as a continuously improve and eliminate anti-patterns First
coach, he finds that Magneto acts like a traditional Correct his understanding of Scrum and accept that Scrum Master is the Team's
19
manager_ Magneto controls the team heavily by manager 
individually assigning tasks and leading the Daily Protest about this at the earliest possible team meeting and let others know he is
Scrum meetings to collect the percentage of task more knowledgeable about Scrum

Scrum Master 
Product Owner 
20 Who owns quality in a Scrum Team? Scrum Team First
Testers
External QA team

Planning is a continuous activity done jointly by Scrum Master and Product Owner 
Detailed planning is done upfront and not revisited
Which of the following BEST represent the Scrum Whole team together does just enough upfront planning followed by continuous
21
approach to planning? planning throughout the project First
Only planning in Scrum is the Sprint Planning
Scrum is one of the planning events

 Agile Ready Partnership Review Not sure


 All get Agile Certified
Which of these are the needed actions to realize
22  Agile Ready Workforce
TCS vision of "0-4-2.?
Top-to-bottom Enterprise Agile Company ourselves
 Agile Ready Workplace

Inventory
Providing additional f eature without clear 
We do it all the time It is not a waste.
23 understanding of the business need - What is this
category of waste? Over Production ok
Defects
Over Processing

In traditional way of software development, once the requirements are base lined,
further changes should undergo heavy change control process Review
Changes are acceptable till design but once development starts, any further 
Which of the following statements about changing change should be rejected
requirements in software development, are correct? In traditional way of software development, once the requirements are base lined,
further changes can be easily accepted with light process.
Organizations must adapt to rapidly changing market conditions to stay relevant
in First

Scrum
Which framework prescribes User Story as the FDD
25
format for backlog items? Crystal 0 Extreme Programming
DSDM

consumer device with embedded software. The  Apply design thinking first for initial phase and then bring in Agile later 
team is adopting 2-week sprint. Lee notices that the
More practices from Extreme Programming
project must produce an outcome that will be highly
26 adoptable by the users to become successful. After 
every Sprint Review, the Product Owner keeps  Apply waterfall and have the Product Owner sign-off on the requirements
changing the Product vision and makes
contradictory statements about user needs. What

Unit testing is not fun anyway. As a self-organized team, choose to ignore the unit
A Scrum Team works on a 4 weeks Sprint. After new testing
Sprints, the team finds that they spend more effort
27 on unit testing, as the code base size has  Adopt practices like test automation from other frameworks like XP
increased. What can be BEST recommended for this Increase the duration of the sprint from 4 weeks to 6 weeks
team?  Add two more temporary testers
Form a separate Testing team

3-5-3
5-3-3
28 Scrum defines roles events and artifacts
3-3-5
5-5-3

Two minutes per person


15 minutes First
29 The time box for a Daily Scrum is …
2 ms
No time box 0 30 minutes

On the last day of the Sprint, a Scrum Team named


Almostflone is ready to show their work but requires Extend the Splint by two days so that the team can complete the work
30
 just 2 more days to complete the testing. What
should the Scrum Master recommend? Close the sprint on time First

,
ToyZon and Team Zan. Team ToyZon follows Team ToyZon
31 traditional way and Team Zon follows Agile way of 
Team Zon
working. Which team has the higher chance to
First

Kent Beck Alistair Cockburn, Ken Schwaber and Jeff


Match the framework to its author(s) in the order of 
Ken Schwaber and Jeff Sutherland; Kent Beck; Alistair Cockburn
32 listing:
Scrum; Crystal; Extreme programming Ken Schwaber and Jeff Sutherland; Alistair Cockburn; Kent
 Alistair Cockburn Ken Schwaber and Jeff Sutherland Kent
Takeuchi and klonaka: Alistair Cockburn; Kent

Jerald is a leader of a TCS Customer Account. He


learnt that the company's aspiration on Agile is to
become 100% Agile by 2020. He gathered his Agile TRUE
33 Experts within the account and asked t hem for a
plan to transition from current way of working to
100% Agile way of working as defined in the text ok
book. Jerald correctly understood TCS aspiration. FALSE

John, a team member, has completed EO -Agile for   Account Leadership


Beginners. He wants to contribute to TCS Agile
34
Vision. He wants to find out what is planned for his
account. Whom should he contact for details? Customer Leadership
HR Manager 

Product Owner can show the progress to the stakeholders and get the approval
to release the work to the production
To assess the team's productivity and possibly record the assessment score
against the performance
35 What is the purpose of Sprint Review'? To inspect the working software with the key stakeholders and take the insights
from the feedback to next
So that the Scrum Team can reorganize for the next
Stakeholders and team discuss the Sprint Backlog for next

 All in team must have the same level of technical


The team is self-organizing First
36 ood Agile team should exhibit the following qualities The team should only take up tasks assigned by Product
The team must be hierarchical with a strict chain of
The team is cross-functional

For large transformation projects, Design Thinking is required before


company project that involved working with
 Agile is based on trust and collaboration so that consensus can be arrived at
multiple business unit leaders to build enterprise
quickly. This scenario did not have that
wide platform. Impressed by the success of small
projects in Agile: company leadership enforced
37 Agile in this transformation project. Shortly after few
Sprints, teams witnessed that The Product Owner   Agile doesn't require any pre-requisites. It works very well in all context. In this
was not able to build consensus among the scenario: the Product Owner doesn't seem to be competent
business unit leaders on requirements. There were
several political aspects behind the collaboration.
What went wron ?

Two minutes per person


15 minutes
38 The time box for a Daily Scrum is 2 hrs
No time box
30 minutes

Waterfall method
….. improves the flow of business idea through its
39 DevOps practices First
development and release to users.
Beta release
Change Control Board (CCB)

The team must discuss the problems encountered in the earlier project

Team chooses the Product Backlog Items to work in the Sprint and crafts a Sprint
A team is having the first Sprint Planning meeting.
Goal.
40 What are the activities that the team must perform
Team must draw up the Release Plan for the final product
during the meeting?
Each team member should come prepared with their version of the plan
The team must look at the project plan prepared by the Product Owner and
understand their tasks

Full Upfront Estimates


Planning Poker  First
41 Which of these are Agile estimation techniques? Work Breakdown Structure
T Shirt sizing
Random Distribution

Products produced by an Agile approach are cheaper than those produced by


any other approach
 Agile increases the chances of delivering early business value to the market and
Which of the following statements BEST describe
42 quickly incorporate the feedback from the market usage First
why Agile is winning?
Products have faster time to market but may not meet immediate customer needs
Products are expensive when compared with products produced by other 
approaches, but are of top quality.

The team self-organizes itself to create value

What is MOST likely to happen if the Product Owner  The Business Analyst helps the team until the Product Owner returns
43
is not available during a Sprint? The Sprint deliverables may not be of desired value
The Scrum Master plays the role of Product Owner  First
Scrum Master terminates the Sprint and waits for the Product Owner to return

Scrum Team
Product Owner  First
44 Who owns the Product backlog? Scrum Master 
Business Analyst
Technical Lea d

Processes and tools over individuals and interactions


Working software over comprehensive documentation
45 What does NOT match with Agile Manifesto?
Responding to change over following a plan
Contract negotiation over customer collaboration

The Scrum Master must assign tasks to individuals


Team members must volunteer for tasks appropriate to their skills

46 should work be allocated to the team in a Scrum proj The complex tasks must be allocated by the Scrum Master 
Tasks must be allocated to team members by the Product Owner 
While senior team members volunteer for tasks, juniors must be assigned tasks
by the Scrum Master 

consumer device with embedded software. The  Apply design thinking first for initial phase and then bring in Agile later 
team is adopting 2-week sprint. Lee notices that the More practices from Extreme Programming
project must produce an outcome that will be highly
47 adoptable by the users to become successful. After 
every Sprint Review, the Product Owner keeps  Apply waterfall and have the Product Owner sign-off on the requirements
changing the Product vision and makes
contradictory statements about user needs. What

Scrum Master and Development team


Product Owner and Development team First
Only these people are allowed to attend Sprint Scrum Master and Product Owner 
48 Retrospective Scrum Team

Munnabhai knows the four values of Agile


Manifesto by heart. However, he was confused  Agile Principles
when a customer spoke with him highlighting Agile
49 characteristics of short software development
ok
cycles or iterations. He could not recollect anything
about short iterations in Agile Manifesto. What did  Agile Guidelines
he miss to learn about?  Agile Methods
 Agile Phases

Reduced Risk
Faster time to market First
50 Which of these is a benefit of Agile?  Ability to respond to changing requirements
Improved collaboration between business and technical team
 All of these

TCS to be regarded by the market and our customers as 100% right partner/
advisor for Agile Transformations Review
Every project in TCS must follow all practices of Extreme Programming
51 TCS Agile vision ‘100% Agile by 2020’ means 100% of TCS associates must be at least at Agile E3 competency
TCS to be regarded as 100% Enterprise Agile company
There should not be any Agile related non-compliance in the project audits

So that the place can be named as Daily Scrum Hub


The consistency reduces complexity and overhead First
52 is the Daily Scrum held at the same time and same pl The Product Owner demands it
Rooms are hard to book and this helps in advance booking
There is no such rule
To produce working software of high business value and of the right quality, early
and incrementally
To produce working software only after requirements documentation has been
53 The Agile way is: signed off by the Product Owner 
To produce simple prototypes early, and release all only at the end of the project
Each developer to sit with business every day, code as they mutually discuss, and
move to production when the business seems

It is used to measure utilization of the development team


It is used to measure defects introduced during the Sprint
54 What is the purpose of Sprint burndown chart?
It is used to measure how much work is yet to be done to reach Sprint goal
It is used to measure how fast the Product Owner turns around on the queries

Programmers as one Scrum Team and Testers as another Scrum Team


Scrum Master as a servant leader 
55 Which of these are Scrum anti patterns? Scrum Team with 20 members First
Cross Functional team
Sprint duration of 6 weeks

Rexx
Jenkins
56 one is a popular tool used in Agile software develop
MS PowerPoint
Tally

 A list of activities banned by the team


The set of Can Have requirements
57 What is a Kanban board?
 A visible chart depicting the work to be done, work in progress and work done First
Board that captures the details of the entire project for audit purpose

Number of items to be worked on by the team


Percentage completion
The Scrum team Is using the Kanban board to make
Tasks move from left to right
worK visually available to all What CANNOT be Interred
58 from the board? LImit work in progress

Do no documentation because it is a waste of lane


Do just enough documentation to support the development and use
of the product
DO Sufficient documentation to prove you have done a good Job
The Agile approach to documentation is
Do more documentation than usual because Agile Is risky
59 Agile Manifesto mandates zero documentation

Waterfall is not a lightweight process


The practitioners did not like to work in a formal system and
Why were the practitioners of alternative
hence did not like any methodology at all
software development methods not satisfied
 with the traditional waterfall method? Waterfall experience did not add value to their resume
Waterfall model failed to meet the demand for speed and was not
60 friendly toward changing business needs and priorities
Ok
an s-on w crum an acqu re cer ca on SAFe Program Consultant (SPC
already The customer may soon move to a large scale
Certified Scrum Master (CSM) First
 Agile Which other certification may be beneficial for Eric
61 so he can be prepared to help the customer? Professional Scrum Master ii (PSM ii)

 Agile principles can be only used for software TRUE


62 development FALSE First

project leader 
 Agile practitioner 
project manager 
 Agile for Beginners course is intended towards
motivating you to learn more about agile so that you can certified manager 
63 become None of the above

Move the entire ODC to Pune, India

Juaraz is a TCS Delivery Partner for the account ABC


running in Agile. Operating out of Mexico He has to
ramp up the team based on customer need, and he is
not getting right skilled people in Mexico He is acing at Understand the TCS Point of View on Distributed Agile and see how to apply at
setting up another ODC at Pune. india where his skill work ok First
requirements are met for an effective Distributed Agile  Ask Agile coach to study other accounts and put together a model for Distributed
64 set up, what is recommended?  Agile

TRUE
65 Design Thinking is other name for Agile Manifesto FALSE First
Product Owner can change me sprint Backlog any day

During the Sprint Planning. Development team has all the


authority to choose any Product Backlog item to work on First
Product Owner writes lightweight Change Requests for quick
How is the Agile value responding to change over  approvals
blowing a plan addressed In Scrum Product Owner can change the plan for next Sprint based on
latest market conditions and feedback from last Sprint
66 Product Owner can change the Product Backlog any time

These features were developed based on initial assumptions about


the user requirements but assumption turned out to be wrong
Industry survey show that in traditional approach. users
do not use near1 60% of the features delivered What do Ok First
you think ere the probable causes By the time the features were delivered the market and user
requirements had changed
67 The marketing team did not advertise the product features

68 Product Owner and Scrum Master can be same person TRUE


FALSE

You might also like