0% found this document useful (0 votes)
127 views

Er. Animesh Pathak - Assistant Manager-Project Management in Power Sector, 7+years Exp

Animesh Pathak has over 7 years of experience in project management in the power sector. He has held several roles including Assistant Manager, EPC Engineer, Senior Engineer, and Site Engineer. His experience includes project monitoring, supervision, tender evaluation, business development, and maintenance of electrical equipment. He has strong skills in AutoCAD, simulations, team management, client relationships, and project management.

Uploaded by

swadeshi cables
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
127 views

Er. Animesh Pathak - Assistant Manager-Project Management in Power Sector, 7+years Exp

Animesh Pathak has over 7 years of experience in project management in the power sector. He has held several roles including Assistant Manager, EPC Engineer, Senior Engineer, and Site Engineer. His experience includes project monitoring, supervision, tender evaluation, business development, and maintenance of electrical equipment. He has strong skills in AutoCAD, simulations, team management, client relationships, and project management.

Uploaded by

swadeshi cables
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 4

Er.

Animesh Pathak –Assistant Manager- Project Management in Power Sector, 7+Years Exp
 : [email protected]  : +91-7800841970
Career Synopsis

Dedicated Electrical Engineer (B. Tech) with 7+years of experience in developing electrical
systems and managing all aspects of projects’ life cycle, offering competencies to
Correspondence Address:
Infrastructure, Project Monitoring, Supervision, Process Stabilization, Project Management,
Troubleshooting & Best Practices to achieve process excellence across Infrastructure &
House no. 1060 kanwal consultancy Service in power sector.
Singh Yadav, Dayanand
Colony, Sector-5 Gurgaon. Key Skills

 Auto CAD | Simulations


 Advance Excel
Personal Data:  Team Management
 Public dealing
DOB : 4th Sep 1991  Client Relationship
 Project Management
 Business Development
Sex : Male
 Tender work in Electrical EPC field

Marital status : Married Professional Experience:

Linguistic Proficiency:
Job Profile # 1
English & Hindi

Interests and Activities: Worked as Assistant manager in IMP Powers Ltd. since June 2019-

Playing & watching Cricket,


Roles & Responsibilities –
Cooking Fusion Food.
 Tender Bid Evaluation of Prequalifying Criterion, Strategize and Preparation of PQRs
documents according to SBD.
 To introduce Visit to prospective customers /present product range.
 Follow ups with customer for Techno-commercial discussion and closing the deal.
 Coordination with Quality Deptt., arranging IS, BIS, IEC, ASTM, ANSI and other
quality journal as per their requirement.
 Conducting joint inspection at sub vendor’s plant.
 Taking care of all commercial activities from Regional office.
 Taking Vendor approval from various Utilities.

Job Profile-

 Business Development by exploring new client segment in market.


 Preparing invoices and Payment follow up
 Arranging material from supplier.
 Ensuring timely delivery to customers as per contract.
 Doing cost negotiations, commercial negotiations and order confirmations with the
clients
Job Profile # 2

Worked as EPC Engineer in KEI Industries Ltd. for Feeder Separation Project (FSP) in
DDUGJY project of Govt. Of India since Aug 2016 to May 2019.
Working on Deen Dayal Upadhyay Gram Jyoti Yojna (DDUGJY) as EPC
Engineer under Pashchimanchal Vidyut Vitran Nigam Ltd. (PVVNL),
Meeurt-UP.

Roles & Responsibilities in FSP:-


 Performed maintenance of all Existing Distribution Transformer, HT Lines, and LT Lines &
Service Lines by making their SLD (Single Line Diagram) first, through survey responsible for
total Feeder handling in terms of execution.
 Performed erection drawing and proposed drawing along with working in GPS, solid drawing
for distribution Line.
 Prepared new 11 KV Line with Distribution Transformer, Replace all existing LT Line’s
conductor & Cables with New AB Cable as per load.
 Completion of target in time by making all the planning’s needed.
 To co-ordinate with Electrical Contractor for Electrification, Execution, Erection &
Commissioning.
 Timely execution and completion of all the activities related to project
 Loss calculation of the network
 Erection of new 11 kv feeder line under feeder separation program
 Detailed project report preparation for the reduction of the losses.
 Daily monitoring the erection report with the completion of proposed target.
 Planning coordination with utilities members & contractors
 Develop policies ensure safety of worker & environment during execution of projects.

 Inspection of quality of erected material, contractors work & assessing delay
 Handling & Preparation of Contractors work billing process.
 Preparing Billing of Supply & Erection of project.
 Handing Over/Taking Over data submission to client.

Roles & Responsibilities in FSP:-

 Installation, commissioning and maintenance of electrical equipments.


 Responsibility to complete the Site work under time duration.
 Excellent knowledge erection of Distribution Transformer.
 Excellent knowledge erection of L.T and H.T Lines and Erected of Poles.
 Commissioning and testing of Distribution Transformer.
 Preparation of BOQ, project cost estimate and Reconciliation of material etc
 Directed workflow, supervised and trained field staff to perform in a systematic &
disciplined manner.
 Erection of distribution transformer substation and LT Line.
 Erection of supports, insulators, stay sets, stinging of conductors etc for completion of lines
work.
Job Profile # 3

Senior Engineer at Medhaj Techno Concept Pvt. Ltd. (MTCPL). Worked on UPPCL project in
MVVNL as PMC, from July 2014 to Aug 2016.
Working on Restructured Accelerated Power Development and Reform Program
(R-APDRP-B) as Project Management Agency (PMA) under Madhyanchal Vidyut
Vitran Nigam Ltd. (MVVNL), Lucknow-UP.

Roles & Responsibilities in R-APDRP-B (Tendering):-


 Tender Bid Evaluation of Prequalifying Criterion, Strategize and Preparation of PQRs
documents according to SBD.
 Preparation on Tender Bid opening & get evaluate according to participated Bidders &
Prepare Bids Evaluation (Part I & II) report for final submission to DISCOM.
 Study Tender specifications, drawings, data & commercial/contractual T & C.
 Preparation on NIT and Corrigendum issue by client for new Tender/Re-tender.
 Liaison with client for finalizing the Tender.
 GTP Verification of all materials.

Main Roles & Responsibilities in R-APDRP-B :-


 The supervision & inspection of quality of work.
 Pre Delivery Inspection of materials for R-APDRP-B project.
 Physical verification of material received/installed & erected in electrification works
 Liaison with UPPCL, MVVNL officials (Client) – from MD to SE level.
 Survey of 33KV, 11KV and LT lines, distribution transformer substation and LT single phase
service consumers
 Procurement, pre-dispatch inspection & supplying required materials to site/site stores.
 Quality of materials & equipment
 Photographs of deficiencies & defects requiring rectification in the work
 Successful completion of the scheme including its closure.
 Develop policies ensure safety of worker & environment during execution of projects.
 Inspection of quality of supplied material, contractors work & assessing delay.
 Preparing & checking the actual progress report of the work executed through TKCs.
 Submission of final technical specifications drawing, GTPs & other related documents
handover data to client.
 Interaction with UPPCL & MVVNL officials – from SE to JE level.
 Monitoring of all project sites like 220/33KV -132/33KV substation, 33 & 11 KV HT line, LT
line etc.
 Regular inspection of equipments like transformer, Pole, and Cables etc.
Job Profile # 4
Worked as Site Engineer in Leo air and Power Solutions Pvt. Ltd. at HVAC and Electrical
Maintenance department since Aug 2013 to June 2014.
Working on Maintenance department as Site Engineer, Delhi

Roles & Responsibilities :-

 Maintenance of plant
 Maintenance of DG
 Maintenance of cooling tower
 Maintenance of machine and its panels.
 Troubleshooting of machine and device.
 Knowledge about connection using Relay, Contactor, NO, NC, etc.
 Co-ordination among maintenance team, as well as other trades

Academic Details:
B. Tech in (Electrical and Electronics Engineering) from Anand Engineering College, Agra with 68.9% in
2013.

Professional & Technical Qualification:


 Certified on AutoCAD 2D from CADD Centre Training Services.
 Good Knowledge of Microsoft Office.

STRENGTH:

 Positive Attitude
 Team Spirit and Leadership

References
Will provide on request