NOTICE INVITING ELECTRONIC QUOTATION No: WBPWD/EE/KED/NIT-17/2020-21 of E.E. KOLKATA EAST DIVISION,
P.W.D
The Executive Engineer, Kolkata East Division, P.W.D invites e-tender on item rate basis (submission of Online Bid) for the works
detailed in the table below.
Sl Name of the Work Earnest Price of W.B. Price per set of Time of Eligibility of Contractor Name of Sub-
N Money Form other document Completion Division
o (Rs.) No.2911 (ii) (Rs.)
(Rs.)
1. Supply & Installation of 20,000.00 Free of Cost. vide G.O No- 199- 30(Thirty) Bonafide agencies with Kolkata
CRC/2M-10/2012 days for having credential in similar
Water Cooler cum East Sub
dt. 21/12/2012 supply & nature of work of at least
reverse osmosis water intending Installation 40% of estimated value of Division-I.
purifier ( 150 ltrs. quotationers shall and one year work done in single works
Capacity) at Ground not have to pay for during last 5 years OR
the cost of maintenance. 2(Two) nos similar nature
Floor to 5-th floor of
quotation of work, each of the
A.P.School, 21 Haji Md. documents for minimum value of 30% of
Mohasin Square, participating in e- the estimated amount put
Kolkata - 700016. quotationing to tender in any Govt.
semi-Govt., Quasi-Govt.
dept. OR one single
running similar nature of
work, minimum value of
80% of the estimated
amount put to tender in
this Division from the date
of issue of the tender
notice. (As per vide
notification no. 03-
A/PW/O/10C-02/14
dt.12.03.2015 of Public
Works Department,
Accounts Branch)
2. Day to day operation 10,000.00 Free of Cost. -DO- 1(One) year -DO- Kolkata
and maintenance of East Sub
submersible set (1 no) Division-
and monoblock pump III.
motor set ( 2 set) at
State Central Library
Building at 1/17, C.I.T
Scheme VII(M), V.I.P.
Road, Kolkata – 54 in 2
(two) shift (Period for
one year).
1|Page
3. Day to day operation 10,000.00 Free of Cost. -DO- 1(One) year -DO- Kolkata
and maintenance of East Sub
submersible set (1 no) Division- II.
and monoblock pump
motor set ( 1 no) at
Moulana Azad College
at 8, Rafi Ahmed
Kidwai Road, Kolkata –
700013 in 2 (two)
shift (Period for one
year).
1. In the event of e-Filing intending bidder may download the quotation document from the website directly by
the help of Digital Signature Certificate.
2. The process of deposit of earnest money through offline instruments like Bank Draft, Pay Order etc. will be
stopped for e–tender procurement of this Division wef. 01.10.2015. Necessary Earnest Money will be
deposited by the bidder electronically: online – through his net banking enabled bank account, maintained at
any bank or: offline – through any bank by generating NEFT/ RTGS challan from the e–tendering portal.
Intending Bidder will get the Beneficiary details from e– tender portal with the help of Digital Signature
Certificate and may transfer the EMD from their respective Bank as per the Beneficiary Name & Account No.,
Amount, Beneficiary Bank name (ICICI Bank) & IFSC Code and e–Proc Ref No. Intending bidder who wants to
transfer EMD through NEFT/RTGS must read the instruction of the Challan generated from E–Procurement
site.
3. For SL. NO. 02 & 03 Should be maintain the following rate :- i) MINIMUM WAGES FOR Workers (Semi-
Skilled) SHOULD BE CALCULATED IN FOLLOWING MANNERS AS PER ORDER CIRCULAR NO.
79/Stat/2RW/32/94/LCS/JLC DATED 25.06.2020 OF LABOUR COMMISSIONER, STATISTIC SECTION,
GOVERNMENT OF WEST BENGAL.
Current EPF = ESI=3.25% in Rs. BONUS = Basic Total SERVICE GST @ Total per head
monthly 13.00% in 8.33% in Rs. in Rs. CHARGES in 18.00% on per month in Rs.
minimum Rs. Rs. ( up to (13,521.06
wages effect 10.00% on + A) in Rs.
from Rs.10853.10
01.07.2020 in
Rs.
10853.10 1410.90 353.00 904.06 13,521.06 A B (13,521.06+A
+ B)
2|Page
viii) A prospective bidder shall be allowed to participate in any Job either in the capacity of individual
or as a partner of a firm.
ix) The partnership firm shall furnish the registered partnership deed and the company shall furnish the
Article of Association and Memorandum. [Non Statutory Documents]
x) In case of open quotation, the prospective bidders shall have satisfactorily completed as a prime
agency during the last 5(Five) years from the date of issue of this Notice at least one work of
similar nature under authority of State/ Central Govt. undertaking/statutory bodies constituted under
the statue of the central /State Govt. and having magnitude of 40(Forty) percent of the amount put
to quotation( Non statutory documents) as per G.O No-102-CRC/2M-50/2009.
xi) Rates should be quoted including all taxes.
xii) Catalog with specifications as mentioned in BOQ Sl. Item no. 1 & 2 should be attached in Non-statuatory
cover.
xiii) For Sl. No. 02 & 03 - Current Valid Trade License. Man- Power deployed should be paid minimum
rates of wages under the Minimum Wages act, 1948 as applicable for Security as declared by the
Labour Commissioner, Govt. of West Bengal from time to time. They should be paid the benefit as
per EPF/ EFPF Act, ESI Act. Etc. Agency shall be wholly and exclusively responsible for due
performance for the entire obligation under Contract Labour (Regulation and Abolition) Act, 1970
and Department shall not in any way be responsible for the breach or Violation of any of provision
under the said Act and Rules there under.
5.The executing agency (successful bidder) may not get a running payment unless the fund is received for this
particular purpose. Provisions in Clause(s) 7, 8, & 9 contained in W.B. Form No. 2911 (ii) so far as they relate to
quantum and frequencies of payment are to be treated as superseded.
6.Constructional Labour Welfare Cess @ 1(one) % of cost of construction will be deducted from every Bill of the
selected agency, Vat, Royalty & all other Statutory levy/ Cess will have to be borne by the contractor & the rate in
the schedule of rates is inclusive of all the taxes & Cess stated above.
8.Bids shall remain valid for a period not less than 120 days (One Hundred Twenty) from the last date of opening
of Financial Bid / Sealed Bid. If the bidder withdraws the bid during the period of bid validity the earnest money
as deposited will be forfeited forthwith without assigning any reason thereof.
9.IMPORTANT INFORMATION
A. Current Schedule of Rates for Bldg. works materials and labour (PWD) Govt. of W.B. effective from 01.07.2014
and current schedule of rates of Road, Bridge and culvert works and carriage etc. Govt. of W.B.P.W. (Roads) .
with latest agenda & corrigenda are applicable.
4 Bid submission starting date (On line) 24/11/2020 from 6.55 P.M
5 Bid Submission closing date (On line) 11/12/2020 upto 02:00 P.M.
7 Date & Place for Opening of Bid (online) 14/12/2020 at 2:00 P.M
At O/O the Executive
Engineer, PWD,KED, Kol-87
3|Page
10. Location of Critical Events
Bid Opening: At O/O the Executive Engineer, PWD,KED, Kol-87. Interested bidder may be present at At O/O the
Executive Engineer, PWD,KED, Kol-87during opening of Bid. Executive Engineer, Kolkata East Division, PWD may call
open bid/sealed bid after opening of the said bid to obtain the suitable rate further, if it is required. No objection in this
respect will be entertained if raised by any bidder present or absent during opening of quotation.
11. There shall be no provision of Arbitration. Hence Cl. 25 of 2911 (ii) is omitted vide notification no. 558/SPW dt. 13.12.11
of Secretary, to the Govt. of West Bengal
12. Earnest Money: The Earnest Money, in the shape of Bank Draft of any Nationalized Bank (to be documented through e-
filling) and copy of which has to be submitted physically to the office of the Executive Engineer, Kolkata Construction
Division, P.W.D. under sealed cover before 24 hours of the date & time of opening of quotation.
13. The intending Bidders shall clearly understand that whatever may be the outcome of the present invitation of Bids, no
cost of Bidding shall be reimbursed by the Department. The Executive Engineer, Kolkata East Division, P.W.D., reserves
the right to reject Bid documents and to accept or reject any offer without assigning any reason whatsoever and is not
liable for any cost that might have incurred by any Bidder at the stage of Bidding.
14. In case of requirement of quotation inviting Authority at any stage of quotation process or execution of work, necessary
registered irrevocable power of attorney is to be produced without any question..
15. All intending bidders are requested to be present in the chamber of the Executive Engineer, Kolkata East Division, P.W.D.,
during opening of the Quotation, to observe the quotation opening procedure.
16. NO CONDITIONAL/ INCOMPLETE QUOTATION will be accepted under any circumstances. Original documents in support of
own possession arrange through lease hold agreement of the aforesaid machineries is to be furnished.
Where there is a discrepancy between the unit rate & the line item total resulting from multiplying the unit rate by the
quantity, the unit rate quoted shall govern.
17. Prevailing safety norms has to be followed so that LTI (Loss of time due to injury) is zero.
i)In the event of acceptance of lowest quotationed rate no multiple lowest rate will be considered by the Department.
18. The Executive Engineer, Kolkata East Division, P.W.D., Reserves the right to cancel the N.I.Q. due to unavoidable
circumstances and no claim in this respect will be entertained.
19. During scrutiny, if it is come to the notice to quotation inviting authority that the credential or any other papers found
incorrect/manufactured/fabricated, that quotationer will not be allowed to participate in the quotation and that
application will be out rightly rejected without any prejudice with forfeiture of earnest money forthwith.
20.Before issuance of the work order, the quotation inviting authority will verify the credential & other documents of the
lowest quotationer. After verification, if it is found that such documents submitted by the lowest quotationer is either
manufactured or false in that case, work order will not be issued in favour of the quotationer under any circumstances.
21. All Agencies are requested to submit the following documents in support of their Credential (Non-statuary Documents)
i) Work order and working schedule.
ii) Completion certificate showing date of completion.
iii) Payment certificate with the application in support of their credentials.
22. i) Conditional quotation will not be accepted in any case.
ii) The accepting authority reserves the right to accept or reject the quotation without assigning any reasons what so
over. iii) The applicant/Bidder must inspect the site of work and get acquainted with site conditions, facilities available
and problems to be faced during work and take into account all such factors before quoting rate.
23. Deduction of tax shall be as per provision of section 40 of the W.B. Vat Act, 2003 with effect from 01.08.2006 as follows:-
i) For payment to contractors who are declared registered under W.B. VAT Act, 2003-2% rate
24.i)If any contractor fails to start the work wither 15 (Fifteen) days from issuing date of work order/ Formal Quotation the
Work Order will be treated as cancelled and relevant classes of the contract shall deemed to have executed by the
quotationing authority. No litigation to this effect shall be entertained by the quotation inviting authority, this is
incorporated to deliver time bound Public Works.
4|Page
iii)Agencies shall have to arrange land for erection of Plant & Machineries, storing of materials, labour
shed, laboratory etc. at their own cost and responsibilityif necessary.
iv)Issuance of work order as well as payment will depend on availability of fund and no claim whatsoever
will be entertained for delay of issuance of work order as well as payment, if any. Intending quotationers
may consider this criteria while quoting their rates.
v)Payment of staff under the agency should be made within 10th of each month. Otherwise action will be
taken as per norms.
25.Bids shall remain valid for a period not less than 120 (One hundred twenty) days after the dead line date for
FinancialBid submission.
26.i)Quotation inviting authority reserves this right to issue corrigendum towards the estimated amount and eligibility of
contractors in case of any revision.
27.In the event of non availability of fund, all quotation will be cancelled in case of deposit work.
28. Clause 17 of condition of contract of the printed Quotation Form No.2911 (ii) shall be substituted vide order no.177-CRC/
2M-57/2008 dt.12.07.2012.
29. G.O No- 198-CRC/2M-10/2012 dt 21.12.2012 of Secretary, PWD will be followed in case of Re-quotation.
30. G.O No- 4814/CE/PWD dt.26.12.2013 of Chief Engineer, PWD will be followed for deposit the EMD.
31. No exemption of Earnest Money Deposit will be entertained for any Bidder and/or any case.
INSTRUCTION TO BIDDERS
SECTION – A
General guidance for e-Quotationing
Instructions/ Guidelines for quotations for electronic submission of the quotations have been annexed for assisting
the contractors to participate in e-Quotationing.
Registration of Contractor
Any contractor willing to take part in the process of e-Quotationing will have to be enrolled & registered with the
Government e-Procurement system, through logging on to https://equotation.wb.nic.in (the web portal of public
works department) the contractor is to click on the link for e-Quotationing site as given on the web portal.
Digital Signature certificate (DSC)
Each contractor is required to obtain a class-II or Class-III Digital Signature Certificate(DSC) for submission of
quotations, from the approved service provider of the National Information’s Centre(NIC) on payment of requisite
amount, details are available at the Web Site stated in Clause 2 of Guideline to Quotationer DSC is given as a USB e-
Token.
The contractor can search & download NIT & Quotation Documents electronically from computer once he logs
on to the website mentioned in Clause 2 using the Digital Signature Certificate. This is the only mode of collection of
Quotation Documents.
Submission of Quotations.
General process of submission - Quotations are to be submitted through online to the website stated in Cl. 2 in two
folders at a time for each work, one in Technical Proposal & the other is Financial Proposal before the prescribed date
&time using the Digital Signature Certificate (DSC).The documents are to be uploaded virus scanned copy duly
Digitally Signed. The documents will get encrypted (transformed into non readable formats).
Technical proposal
The Technical proposal should contain scanned copies of the following further two covers (folders).
A-1. Statutory Cover Containing:-
i)Prequalification Application (Sec-B, Form – I)
ii) As per G.O No- 199-CRC/2M-10/2012 dt.21/12/ 2012 intending quotationers shall not have to pay the cost of quotation
documents for the purpose of participating in e-quotationing. Demand Draft/ bankers Cheque towards earnest money
(EMD) as prescribed in the NIQ against each of the serial of work deposit in favour of the Executive Engineer, Kolkata
East Division, P.W.D.
5|Page
iii) Tender form No. 2911(ii) & NIT with all agenda & corrigendum (download & upload the same Digitally Signed,
quoting rate will only encrypted in the B.O.Q. under Financial Bid. In case quoting any rate in 2911(ii), the quotation is
liable to be summarily rejected).
vi) Special Terms, condition & specification of works.
Click the check boxes beside the necessary documents in the My Document list and then click the tab
“Submit Non Statutory Documents’ to send the selected documents to Non-Statutory folder.
Next Click the tab “Click to Encrypt and upload” and then click the “Technical” Folder to upload the Technical
Documents.
6|Page
i. Screening committee is constituted under the Order No. 3330-ENC/2012 dated 19.3.2012 of
Engineer-In- Chief & Ex officio Secretary, P.W & P.W (Roads) Department. It will function as
screening committee for determination of technical qualification of contractors.
ii. Opening & evaluation of quotation :-
If any bidder is exempted from payment of EMD, copy of relevant Government order needs to be
furnished (applicable in case of Registered Labour Co-Operative Society and bidder who passes
Fixed Security Deposit under Public Works Department).Opening of Technical proposal :-
Technical proposals will be opened by the Executive Engineer, Kolkata East Division, P.W.D.
ii. Only downloaded copies of the above documents are to be uploaded which is virus scanned &
Digitally Signed by the contractor.
2. REJECTION OF BID
The Employer (quotation accepting authority) reserves the right to accept or reject any Bid and to cancel the
Bidding process and reject all Bids at any time prior to award of Contract without incurring any liability to the
affected Bidder or Bidders. There will be no obligation from the part of employer/Quotation accepting
authority to inform the affected Bidder or Bidders the reasons for such action.
The Bidder whose Bid has been accepted will be notified by the Quotation Inviting / Accepting Authority
through Letter of Acceptance
3. The Letter of Acceptance will constitute the formation of the Contract.
4. The Agreement in W.B.F.No.-2911(ii) will incorporate all necessary documents e.g. N.I.Q., all addenda-
corrigendum, special terms & condition (Section –C), specification of works (Section –D), different filled-up
forms (Section –B), B.O.Q. and the same will be constituted between the Quotation Accepting Authority and
the successful Bidder.
5. Royalty as per Govt. rules will be deducted upon failure of production of such documents that it has already
been said.
7|Page
Memo No. 1390/1(18) Date: 24.11.2020
Copy forwarded for information and giving wide publication through the Notice Board to the:-
1. The Chief Engineer(South Zone), PWD, Govt. of West Bengal, Writers' Buildings, Kol – 700001.
2. The Superintending Engineer, PWD, Bidhannagar Circle.
3. The Commissioner of Commercial tax. West Bengal 14, Beliaghata Road, Kol -15.
4. Executive Engineer, PWD, Alipore Division/ City Division/ Kolkata South
Division/Kolkata North Division/Howrah Division/Kolkata Central Division.
5. The Assistant Engineer, PWD, Kolkata East Sub-Division-I/II/III/IV.
6. The Excise Commissioner, Commercial Taxes, West Bengal 14, Beliaghata Road, Kol -15.
7. Notice Board/Accounts Branch/Estimating branch of this Division.
8. Secretary, W.B.Contractors' Welfare Association, East Kulia Road, Kol -10.
8|Page
SECTION – B
FORM –I
PRE-QUALIFICATION APPLICATION
To
The Executive Engineer, P.W.D
Kolkata East Division ,
Having examined the Statutory, Non statutory & NIT documents, I /we hereby submit all the necessary information and
relevant documents for evaluation.
order.
The necessary evidence admissible by law in respect of authority assigned to us on behalf of the group of firms for
Application and for completion of the contract documents is attached herewith.
We are interested in bidding for the work(s) given in Enclosure to this letter.
We understand that:
(a) Quotation Inviting & Accepting Authority/Engineer-in-Charge can amend the scope & value of the contract bid
under this project.
(b) Quotation Inviting & Accepting Authority/Engineer-in-Charge reserve the right to reject any application without
assigning any reason.