This document outlines the process for upgrading flange joint boxes for a DHDT/MSQ system. It describes 3 stages of the flange joints - those under hydrotest, not under hydrotest, and those opened during pre-commissioning. Requirements are listed for boxing up the joints, including torque and tensioning values, sketches, protection methods, and confirmation of anti-galling compounds. The personnel involved from L&T and DIC are identified for execution and quality control. Inspection records must include a format and sketch for each flange joint number in the test packs.

Uploaded by

JR Mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
1K views1 page

Flange Joint Box-Up

This document outlines the process for upgrading flange joint boxes for a DHDT/MSQ system. It describes 3 stages of the flange joints - those under hydrotest, not under hydrotest, and those opened during pre-commissioning. Requirements are listed for boxing up the joints, including torque and tensioning values, sketches, protection methods, and confirmation of anti-galling compounds. The personnel involved from L&T and DIC are identified for execution and quality control. Inspection records must include a format and sketch for each flange joint number in the test packs.

Uploaded by

JR Mohan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOC, PDF, TXT or read online on Scribd
You are on page 1/ 1

DHDT/MSQ UPGRADATION

FLANGE JOINT BOX UP

A) Stages:

1. Flange joint coming under Hydrotest.


2. Flange joint not Hydrotest.
3. Flange joint opened during pre-commissioning.

B) Requirement for Box Up:

1. Information from piping/ Test team for stage 1, 2 & Commissioning Team for stage 3.
2. Torque & Tensioning values. (By Mr. S.H. Baek).
3. a) Sketch showing joint no.
b) Application of Molykote
c) Protection for extended portion, etc.
4. Confirmation for any SS Bolts which required anti galling compound.
5. Orifice Flange inside Grinding & Record.

C) Person to be Involved:

L&T DIC
Execution HGU
Execution DHDT
QC HGU Abhijit Bhattacharya
QC DHDT Manas Nayak

D) Inspection Records to be attached:


Format & Sketch for Flange Joint No. in each Test Pack.