100% found this document useful (1 vote)
525 views34 pages

Summary of Bill of Quantities Guest House

This document provides a bill of quantities for excavation and earthworks, concrete works, and masonry works for the substructure of a guest house project. It includes 17 line items for excavation and earthworks totaling 1,528,630.96 Birr. It also includes 5 line items for concrete works like lean concrete and reinforced concrete footing totaling 574,502.80 Birr. Masonry works includes block work and stone masonry totaling 111,268.78 Birr. The total for substructure works (Section A) is 2,214,402.54 Birr.

Uploaded by

Beza Getachew
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
525 views34 pages

Summary of Bill of Quantities Guest House

This document provides a bill of quantities for excavation and earthworks, concrete works, and masonry works for the substructure of a guest house project. It includes 17 line items for excavation and earthworks totaling 1,528,630.96 Birr. It also includes 5 line items for concrete works like lean concrete and reinforced concrete footing totaling 574,502.80 Birr. Masonry works includes block work and stone masonry totaling 111,268.78 Birr. The total for substructure works (Section A) is 2,214,402.54 Birr.

Uploaded by

Beza Getachew
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 34

SUMMARY OF BILL OF QUANTITIES

Guest House
A. SUB STRUCTURE

1 Excavation and earth work.............................................................


Birr 1,528,630.96
2 Concrete work.............................................................................
Birr 574,502.80
3 Masonry work .............................................................................
Birr 111,268.78
Total A........................ Birr 2,214,402.54

B. SUPER STRUCTURE
1 Concrete work..........................................................................
Birr 2,395,704.50
2 Block work................................................................................
Birr 1,330,919.80
3 Aluminum Work............................................................................
Birr 1,185,041.78
4 Plastering ................................................................................
Birr 1,203,764.72
5 Floor & Wall Finishing ...............................................................
Birr 1,690,641.39
6 Painting ...................................................................................
Birr 250,207.54
7 Electrical Installation,...............................................................
Birr 1,489,964.00
8 Sanitary Installation.....................................................................
Birr 777,525.00

Total B .......................... Birr 10,323,768.74

Total A + B ......................... Birr 12,538,171.28

VAT 15% .......................... Birr 1,880,725.69

CONTINGENCY 10% .......................... Birr 1,253,817.13

GRAND SUMMARY .......................... Birr 15,672,714.10


ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
A. SUB-STRUCTURE
1. EXCAVATION & EARTH WORK
1.1 Site clearing to remove the top soil to an
average depth of 20 cm for ordinary soil. m2 350.02 24.57 8,599.99
1.2 Bulk excavation in ordinary soil to a depth not
exceeding 1500mm from reduced level. m3 139.88 208.50 29,163.94
1.3 Ditto item No. 1.2, but in soft rock . m3 69.94 438.00 30,632.63
1.4 Ditto item No. 1.2, but in boulder rock . m3 41.96 761.40 31,950.25
1.5 Ditto item No. 1.2, but in hardrock . m3 27.98 1,326.38 37,105.48
1.6 Ditto as item No.1.2 but over 1500mm not
exceeding 3000mm. m3 139.88 260.63 36,455.62
1.7 Ditto item No. 1.6, but in soft rock . m3 69.94 527.95 36,923.50
1.8 Ditto item No. 1.6, but in boulder rock . m3 41.96 1,019.73 42,790.42
1.9 Ditto item No. 1.6, but in hardrock . m3 27.98 1,657.97 46,381.71
1.10 Ditto as item No.1.2 but over 3000mm not
exceeding 4500mm. m3 139.88 312.75 43,745.91
1.11 Ditto item No. 1.10, but in soft rock . m3 69.94 671.93 46,993.10
1.12 Ditto item No. 1.10, but in boulder rock . m3 41.96 1,189.69 49,922.37
1.13 Ditto item No. 1.10, but in hardrock . m3 27.98 2,210.63 61,842.37
1.14 Excavation for pit to depth not exceeding
1500mm m3 95.24 144.52 13,763.36
1.15 Ditto item No. 1.14, but in soft rock . m3 47.62 567.00 26,999.12
1.16 Ditto item No. 1.14, but in boulder rock . m3 28.57 878.54 25,100.33
1.17 Ditto item No. 1.14, but in hardrock . m3 19.05 1,312.88 25,006.43
1.18 Excavation for pit to depth over 1500mm but
not exceeding 3000mm m3 95.24 288.69 27,493.39
1.19 Ditto item No. 1.18, but in soft rock . m3
47.62 671.82 31,990.39
1.2 Ditto item No. 1.18, but in boulder rock . m3 28.57 1,142.10 32,630.37
1.21 Ditto item No. 1.18, but in hardrock . m3 19.05 1,500.43 28,578.69
1.22 Excavation for continous trench to a depth not
exceeding 1500mm.starting from reduced
ground level. m3 42.21 234.56 9,899.60
1.23 Ditto item No. 1.22, but in soft rock . m3 21.10 671.82 14,177.08
1.24 Ditto item No. 1.22, but in boulder rock . m3 12.66 761.40 9,640.47
1.25 Ditto item No. 1.22, but in hardrock . m3 8.44 1,500.43 12,665.13
1.26 Back fill around isolated footing and masonry
wall foundation column with non-expansive
selected material from quarry and compact in
layers not exceeding 200mm thick by sprinkling
water to insure the requrment of AASHTO dry
density .
m3 391.15 442.82 173,209.49
1.27 Ditto as item No. 1.26, but from Site m3 195.58 392.30 76,724.27
1.28 Back fill under hard core with non-expansive
selected material from quarry and compact in
layers not exceeding 200mm thick by sprinkling
water to insure the requrment of AASHTO dry
density.
m3 214.48 442.82 94,973.82
1.29 Ditto as item No.1.28, but but from Site m3 107.24 392.30 42,069.27
1.30 Cart away surplus excaveted material and
disposite at a distance not exceeding
10km.from site as per the Engineers Direction.m3 1,374.60 257.85 354,441.64
1.31 25cm thick basaltic or equivalent stone
hardcore well rolled,consolidated and blinded
with crushed stone. m2 162.66 164.52 26,760.82
TOTAL CARRIED TO SUMMARY 1,528,630.96

Page 2
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
2.CONCRETE WORKS
Particular attention !!! must be given to the
following notes along with the Technical
Specification and Method of Measurement
prepared by BaTCoDA.
Constituents of concrete:
The quality of ingredients of concrete must fulfill
the requirements, concrete trial mixes shall be
done and certified & confirmed by laboratory
test results before casting of structural
elements & Cement shall be use OPC for
Structure above C-25 Mpa of Compresive
strength. During concrete casting samples
should be taken for laboratory tests.

Concrete :
The specified concrete strength must be
confirmed by laboratory test.
Reinforcement bar :
The specified yield strength and other related
properties of reinforcement bar must be
certified both in manufacturer's
catalogue/manual and by laboratory test.
Form Work
Formwork shall be constructed to the exact
sizes, shapes lines and dimensions shown and
as required to obtain accurate alignment,
location grade, level and plumb work in finished
structures. Provision shall be made for
openings, offset, sinking, keyways, recesses,
moldings, reglets, chamfers, blockings, screeds
bullheads, anchorages, inserts and other
features as required.

2.1 5cm thick lean concrete class C-5, 150kg of


cement /m3 under:
a) Footing pads m2 90.02 88.34 7,951.92
b) Basement Floor beam m2 26.55 88.34 2,345.30
c) Stone masonary wall m2 33.76 88.34 2,982.19
2.2 Reinforced concrete class C-25,360kg of
cement/ m3 filled into form work and vibrated
around reinforcement bar.Reinforcement bar
and formwork measured separately.

a) Footing pads m3 41.46 2,693.52 111,673.34


b) Basement Floor beam m3 14.80 2,693.52 39,864.10
c) Ground floor beam m3 13.73 2,693.52 36,982.03
d) 10 cm thick Basement floor slab. m2 175.36 269.35 47,233.57
e) 15 cm thick Ground floor slab. m2 166.79 404.03 67,387.83
f) enterance concrete steps m3 3.06 2,693.52 8,242.17
2.3 Reinforced concrete class C-30,400kg of
cement/ m3 filled into form work and vibrated
around reinforcement bar.Reinforcement bar
and formwork measured separately.
a) Foundation column m3 4.04 2,833.92 11,449.04
b) Retaining Wall m3 18.42 2,833.92 52,200.81

Page 3
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
2.4 Provide, cut and fix in position sawn seasoned
timber or wrought iron form work made up of
minimum 3mm thick sheet metal & folded
thickness of 50mm whichever is appropriate;
Contractor to submit formwork design;

a) Footing pads m2 80.16 223.98 17,954.24


b) Foundation column m2 51.88 248.01 12,866.76
c) Retaining Wall m2 184.19 248.01 45,680.96
d) Basement Floor beam m2 98.80 248.01 24,503.39
e) Ground floor beam m2 91.56 265.50 24,309.18
f) 15 cm thick Ground floor slab. m2 166.79 251.02 41,867.63
g) enterance concrete steps m2 33.40 248.01 8,283.53
2.5 Steel reinforcement for use in Sub Structure
Concrete works with a minimum yield strength
Fyk of 300MPa for reinforcement bar of dia.
less than and equal to 10 mm & Fyk of 400MPa
for reinforcement bar of dia. greater than and
equal to 12 mm. Reinforcement shall be
according to Structural Drawings and Technical
Specifications. Price includes cutting, bending,
placing in position and tying wires.

a) Dia 8mm deformed bar kg 25.91 39.00 1,010.57


b) Dia10mm deformed bar kg - 39.00 0.00
c) Dia 12mm deformed bar kg - 39.00 0.00
d) Dia 14mm deformed bar kg - 39.00 0.00
e) Dia16mm deformed bar kg - 39.00 0.00
f) Dia 20mm deformed bar kg - 39.00 0.00
g) Dia 24mm deformed bar kg - 39.00 0.00
Expansion joints
2.6 Supply and fix 10mm thick and 10cm high
Styrofoam for the expansion joint in between
the basement floor beam and the basement
floor slab.
ml 173.469 56.00 9,714.26
TOTAL CARRIED TO SUMMARY 574,502.80
3. MASONRY WORKS
3.1 Construct 50cm thick trachitic or equivalent
stone masonry foundation wall bedded in
cement sand mortar ratio 1:3
A. Below Natural Ground Floor Level (BNGL) m3 22.51 1,560.41 35,124.83
B. Above Natural Ground Floor Level (ANGL) m3
19.69 1,662.67 32,737.97
3.2
Construct 60mm thick single brick bedded on
cement mortar 1:3 mix (as vertical laying) to
protect damp proofing course on retaining wall
& cores. m2 126.41 343.38 43,405.98
TOTAL CARRIED TO SUMMARY 111,268.78

Page 4
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
B. SUPER-STRUCTURE
1. CONCRETE WORK
Particular attention !!! must be given to the
following notes along with the Technical
Specification and Method of Measurement
prepared by BaTCoDA.
Constituents of concrete:
The quality of ingredients of concrete must fulfill
the requirements, concrete trial mixes shall be
done and certified & confirmed by laboratory
test results before casting of structural
elements & Cement shall be use OPC for
Structure above C-25 Mpa of Compresive
strength. During concrete casting samples
should be taken for laboratory tests.

Concrete :
The specified concrete strength must be
confirmed by laboratory test.
Reinforcement bar :
The specified yield strength and other related
properties of reinforcement bar must be
certified either by manufacturer's
catalogue/manual or/and by laboratory test.
Form Work
Formwork shall be constructed to the exact
sizes, shapes lines and dimensions shown and
as required to obtain accurate alignment,
location grade, level and plumb work in finished
structures. Provision shall be made for
openings, offset, sinking, keyways, recesses,
moldings, reglets, chamfers, blockings, screeds
bullheads, anchorages, inserts and other
features as required.

1.1 Reinforced concrete class C-25,360kg of


cement / m3 filled into form work and vibrated
around reinforcement bar.Reinforcement bar
and formwork measured separately.

a) Floor Beams m3 54.92 2,915.21 160,103.33


b) Roof Beam m3 16.24 2,915.21 47,343.01
c) 15 cm thick Suspended Floor solid slab m2 749.40 437.28 327,698.76
d) 15 cm thick Suspended Roof solid slab m2 206.22 437.28 90,176.19
e) Stair case m3 33.10 2,915.21 96,493.45
1.2 Reinforced concrete class C-30,400kg of
cement/ m3 filled into form work and vibrated
around reinforcement bar.Reinforcement bar
and formwork measured separately.
a) Elevation column m3 29.94 3,055.61 91,484.96
1.3 Provide, cut and fix in position sawn seasoned
timber or wrought iron form work made up of
minimum 3mm thick sheet metal & folded
thickness of 50mm whichever is appropriate;
Contractor to submit formwork design;

a) Elevation column m2 383.12 283.22 108,507.25


b) Floor Beams m2 366.10 283.22 103,686.84
c) Roof Beam m2 108.36 283.22 30,689.72
d) 15 cm thick Suspended Floor solid slab m2 749.40 251.02 188,114.39
e) 15 cm thick Suspended Roof solid slab m2 206.22 251.02 51,765.34
f) Stair case m2 171.77 308.38 52,970.43

Page 5
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
1.4 Steel reinforcement for use in Super Structure
Concrete works with a minimum yield strength
Fyk of 300MPa for reinforcement bar of dia.
less than and equal to 10 mm & Fyk of 400MPa
for reinforcement bar of dia. greater than and
equal to 12 mm. Reinforcement shall be
according to Structural Drawings and Technical
Specifications. Price includes cutting bending,
placing in position and tying wires.

a) Dia 8mm deformed bar kg 10,188.15 39.00 397,337.93


b) Dia 10mm deformed bar kg 2,885.52 39.00 112,535.41
c) Dia12mm deformed bar kg - 39.00 0.00
d) Dia 14mm deformed bar kg 1,944.00 39.00 75,815.98
e) Dia 16mm deformed bar kg 11,820.04 39.00 460,981.51
f) Dia 20mm deformed bar kg - 39.00 0.00
g) Dia 24mm deformed bar kg - 39.00 0.00
h) Dia 32mm deformed bar kg - 39.00 0.00
TOTAL CARRIED TO SUMMARY 2,395,704.50
2. BLOCK WORK
2.1 Construct class 'B' 200x200x400mm HCB wall
with cement mortar 1:3 mix ratio. Both faces left
for plaster. m2 650.00 509.99 331,493.50
2.2 Ditto as item 2.1, but 15cm thick HCB m2 847.00 488.26 413,556.22
2.3 Ditto as item 2.1, but 10cm thick HCB m2 128.00 452.11 57,870.08
2.4 Construct 40cm thick fine Dressed ambo or
Equivalent stone type it should lay horizontaly
left for 12mm.wide straight pointing and
vertically fix or inter loacked to be look as a
single ston wall bedded in cement sand mortar
ratio 1:3 as per the drawing and inspection of
the Engineer. m2 220.00 2,400.00 528,000.00
TOTAL CARRIED TO SUMMARY 1,330,919.80

Page 6
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
3. ALUMINUM WORK
Supply and fix Doors & Windows made of
Aluminum tubular profile frames ALLCO-5 or
equivalent, 2mm thick average weight
1000gm/ml, door kick plate 1500gm/ml, partly
covered with aluminum sheet according to the
detail drawing and window door schedule .
Complete work includes all the necessary iron
mongery and ASSA or equivalent type of
cylindrical lock. All aluminum windows and
doors type shall be approved by the Engineer.
Price includes 4mm thick non - reflective tinted
clear glass.

3.1 Windows:
a) Type W1 ,150 x 150cm. No 40.00 8,005.77 320,230.80
b) Type W2 , 60 x150cm. No 36.00 3,202.31 115,283.09
c) Type TW1, 80 x 40cm. No 20.00 1,138.60 22,771.97
d) Type TW1, 40 x 40cm. No 25.00 569.30 14,232.48
3.2 Doors:
a)Type D-1', 135x 210cm. No 1.00 10,087.27 10,087.27
b)Type D-1, 135 x 210cm. No 16.00 10,087.27 161,396.32
c)Type D-2, 90 x 210cm. No 15.00 6,724.85 100,872.70
d)Type D-3, 80 x 210cm. No 36.00 5,977.64 215,195.10
e)Type D-4, 100 x 210cm. No 1.00 7,472.05 7,472.05
3.3 Staircase:
Aluminum hand rail & baluster consists of .

a)
Dia.50/3mm CHS Hand rail top Horizontal
baluster
ml 37.00 1,900.00 70,300.00
3.4 Glased Aluminum Wall
Supply and fix curtain wall made of concealed
Aluminum frames ( Two studded structurally
Glazed curtain wall) , glazing consists
externally 5mm thick non reflective
glass.Complete all works as per the drawing,
standard specification and as per the engineers
approval . Works shall include glazing, all
accessories including trims and flashings and
best quality iron mongery and supply and fixing
b)30x30x2mm
of the curtain wall which RHS to
shall be subject
Vertical baluster at c/c 100cm anchored
approval of shop drawings from the or fixed
to sides of steps Height = 90cm. Complete
manufacturer.
work all according to drawing and technical
specification m2 32.00 4,600.00 147,200.00
TOTAL CARRIED TO SUMMARY 1,185,041.78
4. PLASTERING & Pointing
Finishing work shall include all surface pre-
cleaning, preparation and application of
finishing and cleaning at the end of finishing
work
4.1 Apply two coats of plaster in cement sand
mortar mix [1:3] in Internal wall surfaces. m2 2,600.00 110.58 287,508.00
4.2 Ditto as item 7.1 but for all Internal structural
elements like soffits, beams & columns
surfaces. m2 1,984.97 179.55 356,401.36
4.3 Ditto as item 7.1 but for External wall surfaces. m2
650.00 110.58 71,877.00
4.4 Apply smooth and standard type of Gypsum as
third coat over the plastered internal wall
surfaces. m2 2,600.00 106.43 276,718.00

Page 7
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
4.5 Ditto as item 7.4 but for all Internal structural
elements like soffits, beams & columns
surfaces. m2 1,984.97 106.43 211,260.36
4.6 Apply pointing in cement mortar mix(1:2) to fine
massonery wall as where shown on the
Architectural drawing.Price shall include pre-
cleaning and preparation of the surface.
m2 220.00 44.22 9,728.40
TOTAL CARRIED TO SUMMARY 1,203,764.72
5. FLOOR & WALL FINISHING
5.1 Apply 48mm thick rough cement sand screed
on concrete slab in cement mortar. m2 889.00 158.99 141,342.11
5.2
10mm thickness Supply and fix
600mmx600mm non Slippery ceramic tile
flooring bedded in cement sand ratio (1:3)
including mortar bedding,Price shall include
30mm thick cement mortar bedding. Color and
pattern of tile shall be approved by the
engineer. m2 139.00 812.72 112,968.08
5.3 Supply and fix approved 200x300x6mm glazed
Ceramic wall tiles stuck to wall with cement
mortar mix (1:2) backing and 2 mm joints to be
grouted in white cement. m2 585.2 449.67 263,146.88
5.4 8mm thickness(600*600)mm. Porcelain Floor
Tile bedded on & including cement sand mortar
mix 1:3 and joints grouted in cement mortar.
Price shall include 30mm thick cement mortar
bedding.
m2 102.00 532.16 54,280.32
5.5 Supply and fix 100mm high 10mm thick
porcelain skirting to wall. ml 93.34 106.43 9,934.36
5.6 25mm thickness(500*500)mm. polished granite
Floor Tile bedded on & including cement sand
mortar mix 1:3 and joints grouted in cement
mortar. Price shall include 30mm thick cement
mortar bedding coloure shall be approve as per
the inspection of the engineer.
m2 106.00 4,580.00 485,480.00
5.7 Supply and apply approved type 3mm thick
Epoxy paint over leveled,cured and hardened
cement,sand & gravel screed with mix ratio of
(1:2:3). Price includes standard painting,
primer,cement-sand-gravel screed & polishing.
Application shall be as per the Manufacturer's
catalog & the Engineer's inspection.
m2 154.00 893.00 137,522.00
5.8 100mm high 2mm thick PVC skirting. Price
shall include adhesive or glue to fix with the
wall. ml 21.95 94.16 2,066.81
5.9 Supply and fix 2cm thick wooden parquet floor
finish. Complete all works as per AR drawing
and engineers approval. m2 374.00 449.67 168,176.58
5.10 Supply and fix white approved Marble bedded
& joined in cement and sand mortar mix
1:3.Price shall include cement sand mortar
bedding.
a) Marble Window sill 230mmx 20mm ml 113.65 560.05 63,649.68
thickness
b) Marble Treads 330mmx30mm thickness ml 96.00 1,204.50 115,632.00
c) Marble Risers 160mmx20mm thickness ml 108.00 389.60 42,076.80
d) Landing 30mm thickness m2 16.83 3,650.00 61,429.50

Page 8
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
5.11 Supply & fix 2cm thick White or Equivalent
marble bedded on and including 3cm thick
cement sand screed 1:3 ratio and joints grouted
in White or equivalent type of cement mortar
(1:2) ratio.all work prosidur shall inspect by the
engineer.
m2 14.00 2,352.59 32,936.26
TOTAL CARRIED TO SUMMARY 1,690,641.39
6. PAINTING
6.1 Apply two coats of plastic paint to plastered in
Internal wall surfaces. m2 2,600.00 45.23 117,598.00
6.2 Ditto as item 9.1 but for all Internal structural
elements like Soffits, beams & columns
surfaces. m2 1,984.97 48.60 96,469.54
6.3 Ditto as item 9.1 but for External wall surfaces. m2
650.00 55.60 36,140.00
TOTAL CARRIED TO SUMMARY 250,207.54
7.ELECTRICAL INSTALLATION
Supply and Install :-
7.1 Power & Tele Intakes
Manhole
7.1.1 Manhole in bricks and with concrete base
internally of 800x800x700mm including
concrete cover with lifting hole. No 1.00 5,500.00 5,500.00
Conduits & pipes
7.1.2 PVC conduit of 110mm diameter for main
power cable intake provision ml 10.00 155.00 1,550.00
7.1.3 PVC conduit of 50mm diameter for main Tel.
cable intake provision ml 20.00 120.00 2,400.00
7.2 Low Voltage System Earthing
7.2.1 20x3000mm earth rod No 1.00 1,000.00 1,000.00
7.2.2 Single core, 1x50 sq mm bare copper
earth/grounding conductor from MDB earth
terminal to earth rods in PVC pipe 25mm
diameter (measured elswhere). ml 13.00 310.00 4,030.00
7.3 Feeder Power Cables in Conduits
Multi-core power cable copper conductor,
insulated PVC sheathed, colour coded, type
SIEMENS NYM 0.3/0.5KV or equivalent, in
PVC conduits, connected and tested, including
mounting clips, all as specified and as shown
on drawings:-

7.3.1 Cables
7.3.1.1 5x2.5mm sq. from MDB to SDB-B ml 5.00 108.00 540.00
7.3.1.2 3x4mm sq. from MDB to SDB-G1 ml 17.00 95.00 1,615.00
7.3.1.3 3x4mm sq. from MDB to SDB-G2 ml 18.00 95.00 1,710.00
7.3.1.4 3x4mm sq. from MDB to SDB-G3 ml 15.00 95.00 1,425.00
7.3.1.5 5x4mm sq. from MDB to SDB-1A ml 21.00 138.00 2,898.00
7.3.1.6 5x4mm sq. from MDB to SDB-1B ml 21.00 138.00 2,898.00
7.3.1.7 5x4mm sq. from MDB to SDB-2A ml 26.00 138.00 3,588.00
7.3.1.8 5x4mm sq. from MDB to SDB-2B ml 26.00 138.00 3,588.00
7.3.1.9 5x10mm sq. from MDB to SDB-3A ml 32.00 315.00 10,080.00
7.3.1.10 5x10mm sq. from MDB to SDB-3B ml 30.00 315.00 9,450.00
7.3.1.11 5x10mm sq. from MDB to SDB-4A ml 37.00 315.00 11,655.00
7.3.1.12 5x10mm sq. from MDB to SDB-4B ml 35.00 315.00 11,025.00
7.3.1.13 3x95/50mm sq. from intake point to MDB ml 23.00 2,800.00 64,400.00
7.3.2 Conduits and Pipies
7.3.2.1 20mm diameter from MDB to SDB-B ml 5.00 26.00 130.00
7.3.2.2 25mm diameter from MDB to SDB-G1 ml 17.00 30.00 510.00
7.3.2.3 25mm diameter from MDB to SDB-G2 ml 18.00 30.00 540.00

Page 9
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
7.3.2.4 25mm diameter from MDB to SDB-G3 ml 15.00 30.00 450.00
7.3.2.5 25mm diameter from MDB to SDB-1A ml 21.00 30.00 630.00
7.3.2.6 25mm diameter from MDB to SDB-1B ml 21.00 30.00 630.00
7.3.2.7 25mm diameter from MDB to SDB-2A ml 26.00 30.00 780.00
7.3.2.8 25mm diameter from MDB to SDB-2B ml 26.00 30.00 780.00
7.3.2.9 32mm diameter from MDB to SDB-3A ml 32.00 65.00 2,080.00
7.3.2.10 32mm diameter from MDB to SDB-3B ml 30.00 65.00 1,950.00
7.3.2.11 32mm diameter from MDB to SDB-4A ml 37.00 65.00 2,405.00
7.3.2.12 32mm diameter from MDB to SDB-4B ml 35.00 65.00 2,275.00
7.3.2.13 110mm diameter from intake point to MDB ml 13.00 155.00 2,015.00
7.4 Distribution Boards

Supply, fix and connect flush mounted sheet


steel enclosure distribution board of Siemens,
Legrand, ABB or approved equal with the same
brand circuit breakers, lockable door and
corrosion resistant paint, phase, neutral and
earth bus bars of appropriate rating including,
earthing leads, connectors, cable terminals, top
bottom cable entry and all the necessary fixing
and connecting accessories complete,
consisting of :-
7.4.1 MDB flush mounted distribution board with
busbar of 250A and 3 ammeters with current
transformer, 3 voltage indicator lamps with
fuse, voltage selector switch and consisting of;

1 pc main 200A, MCCB,


3Phase

4 pcs 40A, MCB, 3Phase No 1.00 23,450.00 23,450.00


7.4.2 SDB-B4flush
pcs 20A, MCB,sub
mounted 3Phase
distribution board
3 pcs
with phasebar of 20A 16A,
and MCB, 3Phase
consisting of;
3 pcs
1 pc main 16A, 20A,3Phase
MCB, MCB,
1Phase Reserve pitches 2 pcs 16A, MCB,
1Phase 4 pcs
10A, MCB, 1Phase Reserve
pitches No 1.00 4,950.00 4,950.00
7.4.3 SDB-G1, SDB-G2, SDB-G3 flush mounted sub
distribution board with phasebar of 25A and
consisting of;
1 pc main 20A, MCB, 1Phase
1 pc 16A, MCB, 1Phase
1 pc 10A, MCB, 1Phase
Reserve pitches No 3.00 2,550.00 7,650.00
7.4.4 SDB-3A/3B/4A/4B flush mounted sub
distribution board with phasebar of 50A and
consisting of;
1 pc main 40A, MCB, 1Phase
3 pcs 25A, MCB, 1Phase
9 pcs 16A, MCB, 1Phase
2 pcs 10A, MCB,
1Phase Reserve pitches No 4.00 8,750.00 35,000.00
7.4.5 SDB-1B/2B/1A/2A flush mounted sub
distribution board with phasebar of 25A and
consisting of;

1 pc main 20A, MCB, 3Phase


1 pc 25A, MCB, 1Phase No 4.00 6,250.00 25,000.00
5 pcs

Page 10
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
7.5 Light Points
7.5.1 Flush mounted light points fed through PVC
insulated conductors of 3x2.5mm2 inside PVC
conduits of 16mm diameter, including junction
boxes with covers, screw type insulating caps,
all complete
No 250.00 309.00 77,250.00
7.6 Extra Over Light Points for Flush Mounted
Switches

Supply and fix Legrand Mosiac 45 or approved


equivalent 10/16A, 250V flush mounted light
switch, fed through PVC insulated conductor of
2 x 2.5mm² inside thermo plastic conduit of ø
16mm, connected and tested, complete with
plate and including appropriate wall boxes, all
complete as specified and/or shown on
drawings.
7.6.1 Single switch No 42.00 190.00 7,980.00
7.6.2 Double/two gang single switch No 48.00 217.00 10,416.00
7.6.3 Two way switch No 53.00 203.00 10,759.00
7.6.4 Two gang two way switch No 6.00 230.00 1,380.00
7.6.5 Intermidiate switch No 9.00 230.00 2,070.00
7.6.6 Dimmer switch No 40.00 210.00 8,400.00
7.7 Light Fittings/Fixtures With Lamps
Connected and tested lamps including wires,
flexible cables, conduits, boxes, mounting
materials and accessories complete, all as
specified or described in light fittings schedule
and as shown on the drawings.
7.7.1 Type 1: Philips TCS 098 TLD 2C36W IC-CL
OR EQUIVALENT FLUORESCENT LAMP,
2x36, Philips TCS 098 2x TL-D 36w , lamp
socket G13 with 2x36w flourescent lamp No 28.00 2700 75,600.00
7.7.2 Type 3: Philips TCS 098 4XTLD-A\18W IC C3
OR EQUIVALENT FLUORESCENT LAMP,
4x18, Philips TCS 398 4xTLD-18w , lamp
socket G13 with 4x18w flourescent lamp No - 2800 0.00
7.7.3 Type 4: Batten Fluorescent fitting with 2xTLD
18W lamp No 14.00 1320 18,480.00
7.7.4 Type 5: Incandescent ceiling fitting suitable for
toilet area, with 1xGLS 60W lamp. Massive
30148/55/10, lamp socket of G9 and 60w
Osram lamps No 24.00 1650 39,600.00
7.7.5 Type 6: Incandescent wall fitting suitable for
mirror lighting, with 1xGLS 60W lamp Massive
32010/11/10, lamp socket of E27 and 60w
Osram lamps No 24.00 1800 43,200.00
7.7.6 Type 7: Incandescent ceiling fitting with 1xGLS
60W lamp. No 24.00 1750 42,000.00
7.7.7 Type 8: Incandescent wall fitting with 1xGLS
60W lamp. No 40.00 1850 74,000.00
7.7.8 Type 9: Halogen Recessed down light fitting
with 1xQPAR20 50W lamp. No 32.00 850 27,200.00
7.7.9 Type 11: Incandescent pendant fitting suitable
for dining table lighting, with 1xGLS 60W lamp. No - 1700 0.00
7.7.10 Type 12: Crystal/Chandelier light suitable for
lobby/living room area, with 10xGLS 25W
lamps. No 4.00 4300 17,200.00
7.7.11 Type 13: Compact fluorescent wall fitting
suitable for outdoor area, with 1xCFL 18W
lamp No 6.00 950 5,700.00

Page 11
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
7.7.12 Type 14: Compact fluorescent ceiling fitting
suitable for outdoor area, with 1xCFL 18W
lamp No 54.00 950 51,300.00
7.7.13 Type 15
FLUORESCENT 2x18W LAMP, CEILING
FITTING EXIT LIGHT WITH PICTOGRAM,
Philips TCS 198 2x TL-D 18w , lamp socket
G13 with 2x18w flourescent lamp +3hrs
emergency kit
No 7.00 3800 26,600.00
7.7.14 Type 16
FLUORESCENT 2x18W LAMP, WALL
FITTING EXIT LIGHT WITH PICTOGRAM,
Philips TCS 198 2x TL-D 18w , lamp socket
G13 with 2x18w flourescent lamp +3hrs
emergency kit
No 7.00 3800 26,600.00
7.8 Flush Mounted Socket Outlet Points
7.8.1 10-16A/1P flush mounted socket outlet points
fed through PVC insulated conductors of
3x2.5mm2 inside PVC conduit of 16mm
diameter including junction boxes with covers,
screw type insulating caps and all complete.
No 193.00 370 71,410.00
7.8.3 25A/1P flush mounted socket outlet points fed
through PVC insulated conductors of 3x6 mm²
inside regid PVC conduits of 25mm diameter
including junction boxes with covers, and
insulating screw cap connectors all for flush
mounting
No 16.00 480 7,680.00
7.8.4 16A/3P flush mounted socket outlet points fed
through PVC insulated conductors of 5x2.5
mm² inside regid PVC conduits of 20mm
diameter including junction boxes with covers,
screw type insulating caps, and all complete.
No 2.00 610 1,220.00
7.9 Flush Mounted Socket Outlets with Earth
Contact
Type Legrand or Equivalent complete with
boxes, screw type plates and accessories.
7.9.1 Socket outlet of 10A/16A 1Phase No 157.00 110.00 17,270.00
7.9.2 Water Heater Socket outlet of 10A/16A 1Phase No 36.00 150.00 5,400.00
7.9.4 Socket outlet of 25A 1Phase No 16.00 190.00 3,040.00
7.9.5 Socket outlet of 16A/3P No 2.00 195.00 390.00
7.10 TV System
7.10.1 Supply and install sattelite dish 2.0m diameter
with universal LNB per sattelite station
including roof mounting bracket and SAT-IF
cable up to head end equipment.
No 1.00 3,000.00 3,000.00
7.10.2
TV point fed through RG6 75ohms broad band
Co-axial cable (47-2500MHz) suitable for
TV/FM/SAT signal distribution inside PVC
conduit of 20mm diameter, including junction
boxes with covers, insulating screw cap
connectors No 29.00 450.00 13,050.00
7.10.3 TV Terminal Box No 5.00 550.00 2,750.00
7.10.4 Flush mounting terminal SAT/TV/FM outlet. No 29.00 160.00 4,640.00
7.11 Telecom / Data

Page 12
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
7.11.1
Supply and install all server equipment such as
- switches, PABX, MDF, chords, cable
organizer, patch panels, UPS etc… inside rack
cabinate. Terminate incoming cables, test and
commission. Prepare shop drawings and agree
with the engineer before supply and install
products. Ls 5.00 16,294.00 81,470.00
7.11.2 Data/telephone points fed through 2x(twisted
pair category 6E UTP cable) inside PVC
conduit of 25mm diameter. No 36.00 380.00 13,680.00
7.11.3 Flush mounting RJ45 Data/telephone outlet
CAT5E type LEGRAND Suno, range with 8-
contacts complete with cover and clip on
support frame. No 36.00 182.00 6,552.00
7.12 Bell System
7.12.1 Suplly and install Bell call points fed through
PVC insulated conductor of 2 x 1.5mm2 inside
thermo plastic conduit of ø 16mm complete
with all connection and fixing accessories. No 8.00 295.00 2,360.00
7.12.2 Bell push button with bell sign for flush
mounting No 4.00 110.00 440.00
7.12.3 Bell/buzzer for bell call system No 4.00 450.00 1,800.00
7.13 Generator
7.13.1
Supply and install Generator that can operate
automatically (power/supply turned off),
Standby diesel generator: Smax=125kVA,
voltage=3 Phase, 380/220 Volt, 0.8 power
factor, 4 Wire + Earth, 50 Hz The generator
shall be equipped with: automatic voltage
regulator (AVR), automatic transfer switch
(ATS) No 1.00 437,500.00 437,500.00
TOTAL CARRIED TO SUMMARY 1,489,964.00
8.SANITARY INSTALLATION
All fixtures which specified below is subjected
to the consultant approval, based on
samples,catalogues and brochures presented
by the contractor.
8.1 Hand Wash Basin

Supply and fix Hand Wash Basin , made of


white vitreous China (BS3402) ,with pedestal.
The fixture shall conform to BS5506-3 or
equivalent institution. Size 700 x 405 mm. The
waste fittings, connecting pieces, fixing and
supporting element and other accessories
which complete the set shall comply with the
relevant clauses of BS standard or equivalent
institution. The tap ware shall comply to
BS2878:1980 for Diabled Hand Wash Basin
supply and fix all the necessary accessories
must be provided. No 36.00 3,700.00 133,200.00

Page 13
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
8.2 Water closet

Supply and fix water closet , of wash down


action, floor mounted , vertical outlet (floor
drainage), close coupled ,made of white
vitreous China (BS3402).The fixture shall
conform to BS5503-2 or equivalent institution.
The waste fittings, connecting pieces, fixing
and supporting element and other accessories
which completes the set shall comply with the
relevant clauses of BS standards or equivalent
institution. (For Disabled Water Closet supply
and fix all the necessary accessories must be
provided.) No 36.00 3,700.00 133,200.00
8.3 Urinals

Supply and fix approved quality wall


mountedconcealed steel hanger,concealed
flush pipes, built in p-trap 50cmx70cm,15mm
thick ceramics urinal partition wall complete
with all necessary accessories.Unit price shall
include all the necessary assistances to the
installation works. No 36.00 2,100.00 75,600.00
8.4 Supply
Toilet Paper
and fixHolder
toilet paper holder , made from
white vitreous china(BS3402)
,concealed/surface mounted of approved
quality complete with all the
necessaryaccessories. No 36.00 150.00 5,400.00
8.5 Crystal glass mirror

Supply and fix approved quality framless


crystal glass mirror ,back-silvered ,minimum
6mm thick Size 600mm x 500mmComplete with
thef tresistant concealed wall fastening fittings
and other accessories. No 36.00 760.00 27,360.00
8.6 Soap Holder
Supply and fix soap holder leassed type of
approved quality ,made of white vitreous
china , European standard or equivalent
institution, complete with all the necessary
accessories. No 36.00 500.00 18,000.00
8.7 Floor Drain

Supply and fix 50mm diameter enamelled cast


iron floor drain conform to ASME standardes,
A112.6.3(heavy duty) or equivalent institution
complete wit P-smel trap and all the necessary
accessories. No 17.00 277.00 4,709.00

Page 14
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
8.8 Shower Trey
Supply and fix Shower trays made from
vitreous enameled sheet steel, slip resistant
with adjustable shower head and all other
necessary accessories.The fixture shall
conform to BS6340-7:1983 or equivalent
institution. The waste fittings, connecting
pieces, fixing and supporting element shall
comply with the relevant clauses of BS
standards or equivalent institution.
Size:- 700 x 700
mm. No 20.00 2,300.00 46,000.00
8.9 Tower hanger
Supply and fix towel hanger 610 x 25 mm with
chrome plated tubular towel rail complete with
the necessary accessories. No 20.00 210.00 4,200.00
8.10 Kitchen Sink
Supply and fix double bowl stainless steel
kitchen sink with brass chrome plate trap. The
waste fittings, connecting pieces, fixing and
supporting element and otheraccessories which
complete the set sahll comply with BSEN
695;1997 or the relevant clauses of BS
standards or equivalent institution. The tap
ware shall comply to BS2878:1980
Size 1500 x 600
x 150mm (bowl depth) No 16.00 1,200.00 19,200.00
8.11 Eletric Water Heater

Supply and fix approved quality storage type


water heaters, complete with insulation,one
way valve and safety valve,including all fixing
accessories.The water heater shall also be :-
* made
from steel :-highly resistance to any
deformation caused by variation in temprature
and internal pressure. * With Glass lining
treatement:- The lining of the tank is subjected
to a treatement with titanium or equivalent
glass lining.
* With High performance
heating element:- Comes with high
performance copper heating element. * With
Dual thermostat :- For adjusting water
tempreture and automatic power cut off in the
event of over heating.Type: Ariston or
equivalent type Storage Capacity: 80 liters No 20.00 2,700.00 54,000.00

Page 15
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.
8.12 PPR-Pipes

POLYPROPYLENE RANDOM CO-POLYMER


(PP-R TYPE3)pressure pipes ,(PN20),for cold
and hot water supply system to sanitary
fixtures which comply with BS 6920:part 2&3 or
DIN 8078 and equivalent institution complete
with all the necessary connecting pieces such
as bends, Ys, Tees, reducers, nipples,teflon,
unions, threaded male or female with de-
zincication resistance (DZR)brass inserts
complying with BS 6920 or equivalent
institution, hangers(as per manufacturer's
recommendation) & supporters (if any) etc…
The installation shall be tested at a pressure of
10kg/cm2 or DIN 1988 part 2 or Supply, lay and
connect outer diameter 20mm BS 6700 . Unit
price shall include ,disinfection of the pipes with
Chlorine, painting all exposed PP-R pipes with
UV Reflexive oil paint, installation works any all
additional works there to . ml 70.00 70.00 4,900.00
8.13 Ditto Item No 12, but 25mm diameter ml 70.00 90.00 6,300.00
8.14 Ditto Item No 12, but 32mm diameter ml 40.00 115.00 4,600.00
8.15 Ditto Item No 12, but 40mm diameter ml 210.00 153.00 32,130.00
8.16
Supply and fix chrome plated service (angle)
valves of approved standard, before sink,
shower and other fixtures complete with unions,
elastic water proofing, hand wheels of normal
quality and with all other necessary
accessories.
Diameter:1/2''(20mm OD) No 256.00 135.00 34,560.00
8.17 Bronze Gate Valve

Supply and fix bronze gate valves (PN


16 ),diameter 32 mm of approved standards, on
internal branch water pipes , pipe inlet to
buildings at where shown on the drawing
complete with all the necessary accessories . No 9.00 93.00 837.00
8.18 Ditto Item No 17, but 40mm diameter No 12.00 143.00 1,716.00
uPVC Foul Water Pipe
8.19

Supply and lay 50mm(2'') diameter uPVC pipes


minimum wall thickness 2.0mm for foul water
collection and vent system.The pipes shall be
supported with galvanized clips screwed to
slab,beam columns ... etc at every joints,
bends and at 0.5meters interval in straight line.
All exposed pipes shall be painted with UV
reflective oil paint,similar to the
walls,slabs,beams…etc it is fixed on &
complete with all necessary fittings and clean
out. The pipes,to BS 5255 or Equivalent
Institution.Unit price shall include all the
necessary assistance to the installation works
there to. ml 70.00 93.00 6,510.00
8.20 Ditto Item No 19, but 110mm diameter ml 150.00 173.00 25,950.00
8.21 uPVC Down Pipe

Page 16
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.

Supply and fix Diameter 110mm uPVC Down


pipes, min. wall thickness 3.2mm ,with mass
concrete support at ground level & complete
with UV reflective oil painting, basket strainer at
inlet ,galvanized clips at every 1.0meters
interval and all accessories .The pipes
,accessories, fittings &method of welding shall
comply with the requirement of BS 4514or
equivalent Institution. Unit price shall include all
the necessary assistances to the installation
works there to. ml 124.00 125.00 15,500.00
Spout
8.22 Ditto Item No 21 but outer diameter 80mm with ml 1.00 67.00 67.00
8.23 Vent Cape

Supply and fix 110 mm uPVC vent pipe for


toilets,minimum wall thickness 3.2 mm, painted
with UV reflective oil paint. Unit price shall
include all the necessary assistance to the
installation work. No 7.00 93.00 651.00
8.24 Supply
Water Tankand fix 10m3 Fiber Glass Water Tank for
potable water ,internally smoothen and
externally well finished,which include :-
Inlet diameter-40mm;
Outlet
diameter-40mm,50mm;
Over flow diameter-32mm;
Drain diameter-
32mm;
Vent
pipe diameter-100mm;
Inspection manhole-600 x 600 mm;
Unit price shall include all
the necessary works there to. No 2.00 15,000.00 30,000.00
Necessary accessories for water tank
8.25 Supply and fix bronze gate valves (PN 16),
diameter 40mm,of approved standards for
outlet, No 3.00 970.00 2,910.00
8.26 Supply and fix bronze gate valves (PN 16),
diameter 40 mm,of approved standards for
inlet, No 2.00 650.00 1,300.00
8.27 Supply and fix bronze gate valves (PN 16),
diameter 50 mm(2''),of approved standards for
outlet, No 1.00 570.00 570.00
8.28 Diameter 100mm vent pipe with vent cap length
= 0.5 m; No 2.00 90.00 180.00
8.29 Diameter 32mm HDPE drain and over flow
pipe; No 2.00 115.00 230.00
8.30 Diameter 160mm stainless steel strainer; No 1.00 95.00 95.00
8.31 Galvanized Steel Pipes

Page 17
ITEM
DESCRIPTION UNIT QTY UNIT PRICE TOTAL PRICE
No.

Supply, lay , test and commision 110mm


(21/2'')GSP/ Galvanised Steel Pipe/,(PN16) for
Fire Fighting water supply as shown on the
drawing.The GS pipes shall be supplied
complete with all the necessary accessories
connecting pieces such as
bends,Tees,reducers,adaptors,sockets,unions
or standard approved type metallic clamps.The
installation shall be tested at a pressure of
16kg/cm2.The GS pipes,accessories,fittings &
method of connection shall comply with the
requirement BS 4991& BS6920 part 2 &3 or
equavalent institution. ml 35.00 470.00 16,450.00
8.32 Ditto Item No 31, but diameter 40mm ml 16.00 320.00 5,120.00
8.33 Ditto Item No 31, but diameter 20mm ml 5.00 150.00 750.00
8.34

Supply and fix BS ,NFPA or DIN standard


,surface mounted with full metal door model,
fire hose reel cabinet . Cabinet and door leaf
made of stainless steel 2mm thick sheets with
full 180 degree swinging action and painted
with electro--statics powder paint oven baked to
temperatures between 160-200 oc.Hose is
made of 100% synthetic Jacket ,the outer fabric
is made of circular woven SYNTHETIC FIBER
and root proof yarn, while inner layer is a
substrate of tropical rubber, with working
pressure 20 bar and bursting pressure 60 bar
with standard red color. Nozzle is made of
brass with Chrome plated with three way
control .Cabinet:-W=65cm,H=65cm and
D=19cm The installation shall be tested at a
pressure of 16kgf/cm2. The hose shall be
compatible to Galvanized Steel pipes,
accessories & fittings.GS pipe installation &
method of connection shall comply with the
requirement of BS 4991 & BS 6920 part 2 &3
or equivalent institution.Unit price shall include
all the necessary assistance to the installation
works No 5.00 13,000.00 65,000.00
8.35 Supply and fix bronze gate valves (PN16),
innerdiameter 20 mm(2''),for Air release Valve No 1.00 330.00 330.00
TOTAL CARRIED TO SUMMARY 777,525.00

Page 18
TAKE OFF SHEET

ST
Timizing Dimension Quantity Item Description
A.SUB-STRUCTURE
1.Excavation & earthwork
Site clearing
1 1 15.91
22.00 350.02 m²
350.02 m² total
Bulk excavation in ordinary soil to a depth not
exceeding 1500 mm from reduced level.
1 1 186.50
1.50 279.75 m³
279.75 m³ total
Bulk excavation in ordinary soil to a depth not
exceeding 3000 mm from reduced level.
1 1 186.50
1.50 279.75 m³
279.75 m³ total
Bulk excavation in ordinary soil to a depth not
exceeding 3000 mm from reduced level.
1 1 186.50
1.50 279.75 m³
279.75 m³ total
Pit excavation in ordinary soil to a depth not exceeding
1500 mm from reduced level.
1 6 2.20 F-1
2.20
1.50 43.56 m³
1 12 2.60 F-2
2.60
1.50 121.68 m³
1 2 2.90 F-3
2.90
1.50 25.23 m³
190.47 m³ Total
Pit excavation in ordinary soil to a depth not over 1500
mm but not exceeding 3000mm from reduced level.
1 6 2.20 F-1
2.20
1.50 43.56 m³
1 12 2.60 F-2
2.60
1.50 121.68 m³
1 2 2.90 F-3
2.90
1.50 25.23 m³
190.47 m³ Total
Trench to a depth not exceeding 1500mm.starting from
reduced ground level.
1 1 56.27
1.50
1.00 84.41 m³
84.41 m³ Total

19
Back fill around isolated footing foundation column,and
1.30 masonry wall with….
1 1 465.35
-74.20 391.15 m3
391.15 m3 Total

20
Ditto as item above , but under hard core
1 1 279.75 `
-65.28 214.48 m 3

214.48 m3 Total
Cart away surplus excaveted……

1,374.60
1,374.60 Total
1.37 25cm thick basaltic or equivalent stone hardcore
1 1 10.30
15.46 159.24
1 1 2.70
1.27 3.42
162.66 m total
5cm thick lean concrete class C-5, 150kg of cement
1.1 /m under:
3

a) Footing pads
1 6 1.80 F-1
1.80 19.44 m²
1 12 2.20 F-2
2.20 58.08 m²
1 2 2.50 F-3
2.50 12.50 m²
90.02 m² Total
b) Basement Floor Beam
1 1 10.52 BFB 3
0.40 4.21 m²
1 1 10.67 BFB 4
0.40 4.27 m²
1 1 10.87 BFB 5
0.40 4.35 m²
1 2 17.16 BFB 8
0.40 13.72 m²
26.55 m²
c) Stone masonary wall
1 1 56.27
0.60 33.76
33.76 Total
1.2 Reinforced concrete class C-25,360kg of cement
a) Footing pads
1 6 1.70 F-1
1.70
0.40 6.94 m³
1 12 2.10 F-2
2.10
0.50 26.46 m³
1 2 2.40 F-3
2.40
0.70 8.06 m³
41.46 m³ Total
b) Foundation column
1 14 2.15 C-1
0.30
0.30 2.71 m³
1 4 2.05 C-2
0.30
0.30 0.74 m³

21
1 2 1.85 C-3
0.40
0.40 0.59 m³
4.04 m³ Total
c) Basement Floor Beam
1 1 3.20 BFB 1
0.30
0.40 0.38 m³
1 1 10.32 BFB 2
0.30
0.40 1.24 m³
1 1 10.52 BFB 3
0.30
0.40 1.26 m³
1 1 10.67 BFB 4
0.30
0.40 1.28 m³
1 1 10.87 BFB 5
0.30
0.40 1.30 m³
1 1 11.10 BFB 6
0.30
0.40 1.33 m³
1 2 15.97 BFB 7
0.30
0.40 3.83 m³
1 2 17.43 BFB 8
0.30
0.40 4.18
14.80 m³
d) Retaining wall
1 1 48.47
0.20
1.90 18.42 m3
18.42 m3 total
e) Ground Floor Beam
1 1 3.72 GB 1
0.30
0.40 0.45 m³
1 1 3.70 GB 2
0.30
0.40 0.44 m³
1 1 10.52 GB 3
0.30
0.40 1.26 m³
1 1 10.67 GB 4
0.30
0.40 1.28 m³
1 1 10.87 GB 5
0.30
0.40 1.30 m³
1 1 11.10 GB 6
0.30
0.40 1.33 m³
1 4 15.97 GB 7
0.30
0.40 7.67 m³
13.73 m³
f) In 10cm thick Basement floor slab.
1 1 175.36
1.00 175.36

22
175.36 Total
e) In 15cm thick ground floor slab.
1 1 166.79
1.00 166.79
166.79 Total
f) enterance concrete steps
1 12 3.46 Steps Area=1/2*0.15*0.3 =0.0225
0.02 0.93
1 1 3.46 Soffit Area=2.3*0.15=0.615
0.615 2.13
3.06
Provide, cut and fix in position sawn wooden or steel
formwork which ever appropriate.
a) Footing pads
4 6 1.70 F-1
0.40 16.32 m²
4 12 2.10 F-2
0.50 50.40 m²
4 2 2.40 F-3
0.70 13.44 m²
80.16 m² Total
b) Foundation column
4 14 2.15 C-1
0.30 36.12 m²
4 4 2.05 C-2
0.30 9.84 m²
4 2 1.85 C-3
0.40 5.92 m²
51.88 m² Total
c) Basement Floor Beam
2 1 3.20 BFB 1
0.40 2.56 m²
2 1 10.32 BFB 2
0.40 8.26 m²
2 1 10.52 BFB 3
0.40 8.42 m²
2 1 10.67 BFB 4
0.40 8.54 m²
2 1 10.87 BFB 5
0.40 8.70 m²
2 1 11.10 BFB 6
0.40 8.88 m²
2 2 15.97 BFB 7
0.40 25.55 m²
2 2 17.43 BFB 8
0.40 27.89 m²
98.80 m²
d) Retaining wall
2 1 48.47
1.90 184.19
184.19 m2
e) Ground Floor Beam
2 1 3.72 GB 1
0.40
2.97 m²
2 1 3.70 GB 2
0.40
2.96 m²
2 1 10.52 GB 3
0.40
8.42 m²

23
2 1 GB 3

8.42 m²
2 1 10.67 GB 4
0.40
8.54 m²
2 1 10.87 GB 5
0.40
8.69 m²
2 1 11.10 GB 6
0.40
8.88 m²
2 4 15.97 GB 7
0.40
51.10 m²
91.56 m²
e) In 15cm thick ground floor slab.
1 1 166.79
1.00 166.79
166.79 Total
f) enterance concrete steps
1 12 3.46 Steps
0.30 12.46
1 13 3.46 Steps
0.15 6.75
1 1 3.46 soffit
4.10 14.19
33.40
MASONERY WALL
Below NGL
1 1 56.27
0.80
0.50 22.51 m3
22.51 m3 Total
Dito but above NGL
1 1 56.27
0.70
0.50 19.69 m3
19.69 m3 Total
B.SUPER-STRUCTURE
1.Concrete Works
1.1 Reinforced concrete work in c-25 with
a) Elevation Column

24
1 14 15.10 C-1
0.30
0.30 19.03 m³
1 4 16.90 C-2
0.30
0.30 6.08 m³
1 2 15.10 C-3
0.40
0.40 4.83 m³
29.94 m³ Total
b) floor Beam (1st - Roof)
4 1 3.72 FB-1
0.40
0.30 1.79 m³
4 1 3.70 FB-2
0.40
0.30 1.78 m³
4 1 10.52 FB-3
0.40
0.30 5.05 m³
4 1 10.67 FB-4
0.40
0.30 5.12 m³
4 1 10.86 FB-5
0.40
0.30 5.21 m³
4 1 11.10 FB-6
0.40
0.30 5.33 m³
4 4 15.96 FB-7
0.40
0.30 30.64 m³
54.92 m³ total
d) roof Beam
1 3 3.20 RB-1'
0.40
0.30 1.15 m³
1 2 5.71 RB-2'
0.40
0.30 1.37 m³
1 1 3.72 RB-1
0.40
0.30 0.45 m³
1 1 3.70 RB-2
0.40
0.30 0.44 m³
1 1 10.52 RB-3
0.40
0.30 1.26 m³
1 1 10.67 RB-4
0.40
0.30 1.28 m³
1 1 10.86 RB-5
0.40
0.30 1.30 m³
1 1 11.10 RB-6
0.40
0.30 1.33 m³
1 4 15.96 RB-7
0.40
0.30 7.66 m³

25
16.24 m³ total
e) Suspended Floor solid slab
1 4 187.35 1st - 4th floor slab
1.00 749.40 m²
749.40 m² total
f) Suspended roof solid slab
1 1 206.22 Roof slab
1.00 206.22 m²
206.22 m² total
g) Stair case-1
10 1 3.10 soffit
3.25
0.25 25.19 m³
5 1 3.25 landing
1.27
0.25 5.16 m³
5 18 1.20 Steps Area=1/2*0.15*0.3 =0.0255
0.03 2.75 m³
33.10 m³ total
Provide cut and Fix in position sawn zigba wood
formwork or equivalent.
a) Elevation Column
4 14 15.10 C-1
0.30
253.68 m³
4 4 16.90 C-2
0.30
81.12 m³
4 2 15.10 C-3
0.40
48.32 m³
383.12 m² Total

26
b) floor Beam (1st - 4th floor)
4 2 3.72 FB-1
0.40
11.90 m²
4 2 3.70 FB-2
0.40
11.84 m²
4 2 10.52 FB-3
0.40
33.66 m²
4 2 10.67 FB-4
0.40
34.14 m²
4 2 10.86 FB-5
0.40
34.75 m²
4 2 11.10 FB-6
0.40
35.52 m²
4 8 15.96 FB-7
0.40
204.29 m²
366.10 m2 total
d) roof Beam
2 3 3.20 RB-1'
0.40
7.68 m²
2 2 5.71 RB-2'
0.40
9.14 m²
2 1 3.72 RB-1
0.40
2.98 m²
2 1 3.70 RB-2
0.40
2.96 m²
2 1 10.52 RB-3
0.40
8.42 m²
2 1 10.67 RB-4
0.40
8.54 m²
2 1 10.86 RB-5
0.40
8.69 m²
2 1 11.10 RB-6
0.40
8.88 m²
2 4 15.96 RB-7
0.40
51.07 m²
108.36 m2 total
e) Suspended Floor solid slab
1 4 187.35 1st - 4th floor slab
1.00 749.40 m²
749.40 m² total
f) Suspended roof solid slab
1 1 206.22 Roof slab
1.00 206.22 m²
206.22 m² total

27
g) Stair case-1
10 1 3.10 soffit
3.25
100.75 m²
5 1 3.25 landing
1.27
20.62 m²
5 18 1.20 Steps
0.30 32.40 m²
5 20 1.20 Steps
0.15 18.00 m²
171.77 m² total

220 Masonry wall


1.00
220.00 m²
220.00

28
NO. OF
NO. OF TOTAL
DIA LENGTH BARS
LOCATION MEMBE NO . OF
(MM) (M) PER
R BARS 8.00 10.00 12.00 14.00 16.00 20.00 24.00
MEMBER
SUB STRUCTURE
Footing Pad
8 0.8 41 2 82 65.60

TOTAL LENGTH, M 65.60 0.00 0.00 0.00 0.00 0.00 0.00


UNIT WEIGHT , KG/ M 0.40 0.62 0.89 1.21 1.58 2.47 3.56
TOTAL WEIGHT,KG 25.91 - - - - - -
SUPER STRUCTURE
Elevation Column
C-1 16 14.60 8 14 112 1635.20
16 6.85 6 14 84 575.40
St-up 8 1.10 108 14 1512 1663.20
C-2 16 14.60 8 1 8 116.80
16 9.80 6 1 6 58.80
St-up 8 11.10 122 1 122 1354.20
C-3 16 3.65 10 3 30 109.50
16 17.90 8 3 24 429.60
St-up 8 1.50 108 3 324 486.00

1st Floor to Roof Beam


FB-1 16 4.37 6 5 30 130.95
16 1.595 2 5 10 15.95
St-up 8 1.20 28 5 140 168.00
FB-2 16 4.35 6 5 30 130.50
16 1.59 2 5 10 15.90
St-up 8 1.20 28 5 140 168.00
FB-3 16 11.12 6 5 30 333.60
16 1.60 2 5 10 15.95
16 2.205 1 5 5 11.03
16 2.20 1 5 5 11.00

29
NO. OF
NO. OF TOTAL
DIA LENGTH BARS
LOCATION MEMBE NO . OF
(MM) (M) PER
R BARS 8.00 10.00 12.00 14.00 16.00 20.00 24.00
MEMBER
St-up 8 1.20 87 5 435 522.00
FB-4 16 11.27 6 5 30 338.10
16 1.68 1 5 0.00
16 2.23 1 5 0.00
16 2.23 1 5 0.00
16 1.68 1 5 0.00
St-up 8 1.20 90 5 450 540.00
FB-5 16 11.47 6 5 30 343.95
16 1.71 3 5 15 25.65
16 2.26 2 5 10 22.60
16 3.50 2 5 10 35.00
St-up 10 1.20 69 5 345 414.00
FB-6 16 11.70 6 5 30 351.00
16 1.75 2 5 10 17.50
16 2.30 2 5 10 23.00
St-up 8 1.20 86 5 430 516.00
FB-7 16 17.26 6 20 120 2071.20
16 6.48 1 20 20 129.60
16 4.98 2 20 40 199.20
St-up 8 1.20 61 20 1220 1464.00
10 1.20 56 20 1120 1344.00
1 Floor to Roof Slab
st

1 8 6.11 14 5 70 427.70
2 8 5.98 14 5 70 418.25
3 8 5.03 13 5 65 326.63
4 8 3.25 91 5 455 1478.75
5 8 5.04 13 5 65 327.60
6 8 4.47 5 5 25 111.63
7 8 4.28 12 5 60 256.80
8 8 4.48 5 5 25 112.00

30
NO. OF
NO. OF TOTAL
DIA LENGTH BARS
LOCATION MEMBE NO . OF
(MM) (M) PER
R BARS 8.00 10.00 12.00 14.00 16.00 20.00 24.00
MEMBER
9 8 4.28 12 5 60 256.80
10 8 5.22 26 5 130 678.60
11 8 5.23 26 5 130 679.90
12 8 5.38 33 5 165 887.70
13 8 5.38 33 5 165 887.70
14 8 5.49 23 5 115 630.78
15 8 5.05 19 5 95 479.28
16 8 5.00 23 5 115 574.43
17 8 3.25 24 5 120 390.00
18 8 4.25 69 5 345 1466.25
19 8 6.32 26 5 130 820.95
19' 8 5.72 30 5 150 857.25
20 8 5.48 19 5 95 520.13
21 10 2.30 30 5 150 345.00
22 10 2.30 43 5 215 494.50
23 8 2.30 19 5 95 218.50
24 8 2.30 19 5 95 218.50
25 8 2.30 28 5 140 322.00
26 8 2.30 28 5 140 322.00
27 10 2.34 23 5 115 268.53
28 10 3.03 24 5 120 363.60
29 8 2.34 74 5 370 863.95
30 8 2.89 75 5 375 1083.75
31 10 2.24 21 5 105 235.20
32 10 2.21 20 5 100 220.50
33 10 2.48 36 5 180 446.40
Water tanker slab
1 8 5.12 36 1 36 184.32

31
NO. OF
NO. OF TOTAL
DIA LENGTH BARS
LOCATION MEMBE NO . OF
(MM) (M) PER
R BARS 8.00 10.00 12.00 14.00 16.00 20.00 24.00
MEMBER
2 8 7.64 19 4 76 580.26
3 10 2.93 19 2 38 111.15
RB-1 16 3.85 6 2 12 46.20
st-up 16 1.43 2 2 4 5.70
8 1.20 24 2 48 57.60
16 6.37 6 2 12 76.38
RB-1 16 3.28 1 2 2 6.55
16 1.76 1 2 2 3.52
st-up 8 1.20 45 2 90 108.00
Staircase
14 5.64 12.00 5.00 60 338.40
14 1.85 12.00 5.00 60 110.70
14 1.72 12.00 5.00 60 103.20
14 2.18 12.00 5.00 60 130.50
14 2.24 12.00 5.00 60 134.10
8 1.55 35.00 5.00 175 271.25
8 1.55 35.00 5.00 175 271.25
8 1.23 100.00 5.00 500 615.00
14 4.13 12.00 5.00 60 247.80
14 1.88 12.00 5.00 60 112.50
14 1.63 12.00 5.00 60 97.80
14 2.36 12.00 5.00 60 141.30
8 1.55 31.00 5.00 155 240.25
8 1.55 31.00 5.00 155 240.25
8 1.23 100.00 5.00 500 615.00
14 1.96 24.00 1.00 24 46.92
14 6.03 24.00 1.00 24 144.72
10 0.896 264.00 1.00 264 236.54
10 2.22 24.00 1.00 24 53.28
8 3.66 22.00 1.00 22 80.41
Landing Beam-1 16 3.85 7.00 5.00 35 134.75

32
NO. OF
NO. OF TOTAL
DIA LENGTH BARS
LOCATION MEMBE NO . OF
(MM) (M) PER
R BARS 8.00 10.00 12.00 14.00 16.00 20.00 24.00
MEMBER
10 1.20 24.00 5.00 120 144.00
Landing Beam-2 16 4.38 3.00 5.00 15 65.70
8 1.20 5.00 5.00 25 30.00
TOTAL LENGTH, M 25,792.79 4,676.70 - 1,607.94 7,485.78 - -
UNIT WEIGHT , KG/ M 0.40 0.62 0.89 1.21 1.58 2.47 3.56
TOTAL WEIGHT,KG 10,188.15 2,885.52 - 1,944.00 11,820.04 - -

33
0.00
6.31
-

34