The document contains notes for construction projects that are subject to approval from the DCCA and DEWA. It provides guidelines on excavation limits, landscaping restrictions, foundation types, and prohibited activities. All works must be conducted according to the geotechnical guidelines. Foundations can use isolated footings connected by beams or bored piles, but driven piles are not permitted. [END SUMMARY]

Uploaded by

muddather
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
94 views38 pages

DWG Amec 170928 Approved by Ppdc-Meraas

The document contains notes for construction projects that are subject to approval from the DCCA and DEWA. It provides guidelines on excavation limits, landscaping restrictions, foundation types, and prohibited activities. All works must be conducted according to the geotechnical guidelines. Foundations can use isolated footings connected by beams or bored piles, but driven piles are not permitted. [END SUMMARY]

Uploaded by

muddather
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 38

Note: Approved: 28Sep17

Subject to DCCA approval


Approved: 28Sep17
Approved: 28Sep17
Approved: 28Sep17
ER29
Approved: 28Sep17

ER 32R1

ER30

ER29
Note:
Subject to DCCA approval.
ER29

ER32R1
Approved: 28Sep17

ER29
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA & DEWA approval.
All works to be conducted in accordance with the
Geortechnical Guidelines.

ER29 Approved: 28Sep17

ER30 ER32R1

ER31

ER29
Note:
Subject to DCCA & DEWA approval.

ER29 Approved: 28Sep17

ER30
ER32R1
ER31

ER29
Note:
All excavations must be conducted in accordance with the geotechnical guidelines & restrictions.
All plots must be graded towards the beach side of the property to allow natural runoff of rain water.
The Setting Out Line is the position of the crest of the buried rock revetment as shown in Figure 12 of the Geotechnical Guidelines Report available on the FTP site.
Seaward of the Setting Out Line and 5m landward of the Setting Out Line is a ‘do not touch’ zone. This is the dynamic beach area, therefore no permanent facilities
can be placed in this zone. This includes boundary fences.
Between 5 and 10m from the Setting Out Line excavation is permitted down to +4.0mDMD .
From 10m landwards from the Setting Out Line there is no restriction on excavation.

ER29

ER32R1

Approved: 28Sep17

ER29

Note:
Trees, palms and large shrubs must only be planted in pits lined with root barriers.
Impermeable Root barrier (Terram Rootguard Plus or equivalent) to be provided
on the sides for all palm/tree pits, small trees and large shrubs and shrub beds.
The base of the tree pit must be laid with a permeable root barrier (Terram rootguard or
equivalent) over the drainage layer.
All trees and palms must be provided with root anchoring for adequate support.
Boring wells within or outside the plot limit to extract underground water for irrigation is
Prohibited.
Restricted Plants are:
Ficus sp., Bambusa sp., Conocarpus sp., Eucalyptus sp.
Approved: 28Sep17

Note:
Trees, palms and large shrubs must only be planted in pits lined with root barriers.
Impermeable Root barrier (Terram Rootguard Plus or equivalent) to be provided
on the sides for all palm/tree pits, small trees and large shrubs and shrub beds.
The base of the tree pit must be laid with a permeable root barrier (Terram rootguard or
equivalent) over the drainage layer.
All trees and palms must be provided with root anchoring for adequate support.
Boring wells within or outside the plot limit to extract underground water for irrigation is
Prohibited.
Restricted Plants are:
Ficus sp., Bambusa sp., Conocarpus sp., Eucalyptus sp.
Note:
Subject to DCCA approval.

Approved: 28Sep17

ER32R1
Note:
Subject to DCCA approval.

ER29
Approved: 28Sep17

ER29
Note:
Subject to DCCA & DEWA approval.

ER29 Approved: 28Sep17

ER32R1

ER29
Note:
Subject to DCCA approval.

Approved: 28Sep17

ER32R1
ER30
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17

ER31
Note:
Subject to DCCA approval.

ER31

ER31
ER30 Approved: 28Sep17

ER31

ER31
ER30
Note:
Subject to DCCA approval.
ER31

ER31
Approved: 28Sep17

ER31
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note: ER31
Subject to DCCA approval.

ER31

Approved: 28Sep17

ER29 ER29

ER31

ER31
ER30
Note: ER31
Subject to DCCA approval.

ER31

Approved: 28Sep17

ER31

ER31 ER30
Note:
Subject to DCCA approval. ER29

ER32R1
ER30

Approved: 28Sep17

ER29
Note:
Subject to DCCA & DEWA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA & DEWA approval.

Approved: 28Sep17
Note:
Subject to DCCA & DEWA approval.

Approved: 28Sep17
Note:
Subject to DCCA & DEWA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
Subject to DCCA approval.

Approved: 28Sep17
Note:
For Shallow Foundation (i.e., isolated footing), all shallow footings must be
connected by rigid ground beams.
Bored and cast in place concrete pile types can be used for deep foundation if
deemed required.
Driven piles are not allowed within the entire project area.
Approved: 28Sep17
Note:
For Shallow Foundation (i.e., isolated footing), all shallow footings must be
connected by rigid ground beams. Approved: 28Sep17
Bored and cast in place concrete pile types can be used for deep foundation if
deemed required.
Driven piles are not allowed within the entire project area.