Business Blue Print: TALLY/ Oracle SAP

This document outlines the key steps in a project to migrate a client's business processes from Tally/Oracle to SAP. It includes preparing requirements and current state documentation, designing future state processes, building the new configuration in SAP, testing, preparing the final migration, and go-live activities. The main phases are preparation, design, realization (building the configuration), testing, final preparation, and release management. Key activities include workshops to understand the current processes, developing AS-IS and TO-BE documentation, configuring SAP modules like FICO, and testing in multiple environments before final migration to production.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
49 views

Business Blue Print: TALLY/ Oracle SAP

This document outlines the key steps in a project to migrate a client's business processes from Tally/Oracle to SAP. It includes preparing requirements and current state documentation, designing future state processes, building the new configuration in SAP, testing, preparing the final migration, and go-live activities. The main phases are preparation, design, realization (building the configuration), testing, final preparation, and release management. Key activities include workshops to understand the current processes, developing AS-IS and TO-BE documentation, configuring SAP modules like FICO, and testing in multiple environments before final migration to production.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 4

Project preparation

BBP
Realization
Final preparation
Go-live

Business blue print


TALLY/ Oracle ============== SAP

Work Shop: Meeting (Client & IT team)

BPD’s (Business Process Development)

 We are going analysing Existing business process


 Before attending the workshop, Consulate will prepare RGQ (Requirement Gathering Questioner)
 Client will give the presentation their current business process ( As – Is Document)
 Core team (Client) will prepare the AS-IS Document ( Existing business process in TALLY / ORACLE/
SAP of Client)
 SAP FICO Consultant will prepare TO-BE Doc Based on AS-IS
 I have prepared FSD (Functional Specification Document)
 Before going the finalized FSD Preparation we Should check
 Whatever existing Bus.bussin process is not possible in SAP, Then we go for RICEFW
 Functional consultant will prepare FSD (Functional Specification Document) (logic of Reports, forms,
Enhancement, workflow, interface)
Design:
a) Design Document  only standard business process (80%)
b) Functional Design  only RECEFW related Document (20%)
c) Non SAP Design  prepare complete Master data & Transaction Data templated based on
Existing Software.

Realization phase
Note: Completely configuration part in SAP System.

Build Phase (Configuration phase)


o Build configuration:
Based design document consultant will do the Configuration SAP.
o Technical Build:
ABAPER will Development the RICEFW related configuration based FSD
 GST z report
 Payment advice print forms
 TDS z reports
Testing phase:
Before going to Testing we should Copy the TR from one Client (800) to Another Client
(810) t.code : SCC1
TR Checking /Realise : SE10/SE09
SE38 – Program activation
 UNIT Testing (Consulate will Do the all kind of Testing perfumed in Development
Sever)
 System Testing (individual module End user in QAS)
 Integration Testing (QAS system End User All modules )
 Regression testing (RICEFW Related Configuration Testing (QAS)
 Performance Testing (BASIS will testing in DEV & QAS)
 UAT testing (QAS System Super user)-Final testing
In UAT testing Client will give The confirmation and Signoff

Final preparation

Cutover Activates:
o Non SAP Build
 All master data move to PRD system though
LSMW/BDC/BAAPi/IDOC
Roles :
GL – (5 Emp)  FS00, FAGLL03, FAGLB03, F-02, FB50
AP - (FK01, FK02, FK03, FK10N, FBL1N, FB60,F-42,F-02,FAGLL03,FAGLB03)
AR -> FD01, FD02, FD03, FD10N, FBL5N, FB75, FB70
AA 
GST
(FK01, FK02, FK03, FK10N, FBL1N, FB60,F-42,F-02,FAGLL03,FAGLB03)
FD01, FD02, FD03, FD10N, FBL5N, FB75, FB70
Release Management:
List of TR’s
All TR’s Transfer form DEV & QAS --- PRD :
Maser data not move & Transaction data
Export to TR?
Note: at the time Tax code export, tax code will save not Rate.