0% found this document useful (0 votes)
45 views

Vmware Conversion Process

The document details the vmware conversion process from a physical machine to a virtual machine. It involves getting approval, notifying stakeholders, taking backups, converting the machine on a specified date, validating the conversion, and notifying everyone of the results.

Uploaded by

Srinivas Piratla
Copyright
© © All Rights Reserved
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
45 views

Vmware Conversion Process

The document details the vmware conversion process from a physical machine to a virtual machine. It involves getting approval, notifying stakeholders, taking backups, converting the machine on a specified date, validating the conversion, and notifying everyone of the results.

Uploaded by

Srinivas Piratla
Copyright
© © All Rights Reserved
Available Formats
Download as TXT, PDF, TXT or read online on Scribd
You are on page 1/ 4

Explain the vmware Conversion Process:

Physical Machine : Lab11r22k8


Application : Share Point

1.Management will give an Approval to Convert the Physical Machine.

Mail:
Hi Virtualization team, you are authorized to convert
Lab11r22k8 machine .
Please Migrate it by end of this Month

Thanks,
Shankar
InfraStructure Director,
CloudSoft

2.VMware Virtualization team manager will assign this task to respective Engineer
(say : Amarnath)

3.VMware Engineer Will Maill all the stake holders about the conversion date and
time.

Mail
TO : Vmware team Members,
Team manager,
Lab11r22k8 Machine owner,
Sharepoint Application Owner,
Backup Administrators,
Security team,
Wintel Team.

Hi EveryOne,
Lab11r22k8 Machine which is running in Lab11 rack2 will be
Migrated to vcenter on Jan22,2012
You may experience downtime between 8PM to 6AM
Please plan accordingly,
Thanks and Regards,
Amarnath

4. Vmware Engineer Mail to Backup Administrators.


Mail
TO: Backup Administrators,
CC : Team manager,Team Lead

Hi Team,

Lab11r222k8 Machine will migrated to vcenter (P2V) on Jan 22.


Please take a full backup of the machine on Jan21

Thanks and Regards,


Amarnath.

5.Vmware Engineer Mail to Security Team

Mail
To : Security team,
CC : Team Manager,Team Lead
Hi Team,
Lab11r222k8 Machine will migrated to vcenter (P2V) on Jan22.
As a part of Migration process, Some of the Security Software
Services will be stopped.

Please let me know in case of an issue

Thanks,
Amarnath.

6.VMware Engineer mail to Wintel team


Mail
To : Wintel team,
CC : Team Manager,Team Lead
Hi Team,
FYI
Lab11r222k8 Machine will migrated to vcenter (P2V) on Jan22.
Thanks,
Amarnath

7.Vmware Engineer to SharePoint Administrator

Mail
To : SharePoint Administrator,
CC : Team Manager,Team Lead
Hi Team,
FYI
Lab11r222k8 Machine will migrated to vcenter (P2V) on Jan22.
You may experience the downtime.
Please let me know if there is any business Impact

Thanks,
Amarnath

Pre-Migration Check List(update the excel sheet)

1. Lab11r22k8 Machine owner details


2.Sharepoint administrator details
3.Backup Administrators Contat details
4.Security team contact details
5.Wintel team Contact details

6.Lab11r22k8 Configuration details


a.Machine Hostname
b.IP address
c.Storge details
C drive Total space,Free Space
D drive Total space,Free Space
E drive Total space,Free Space
...
7.Screen Shots
i.MyComputer Properties
ii.ipconfig /all output
iii.services.msc
iv.C drive
v. d Drive
8.Dummy data

Add dummy folder with dummy file in C Drive


Add dummy folder with dummy file in D Drive
.
.
9.Stop all the services EXcept Windows and Vmware Services
10.Disable RDP.

_On Specific date and time Convert the machine

Post-Migration Check list


1.Before powering on Disconnect the network adapters
2.Power on the VM
3.Check the Hostname
4.Take Screen shots of previous areas
and check whether there are any changes
5.Check the dummyfolder in all the drives
6.Start all the services which were running previously
7.Power off the physical machine
8.Connect the network adapters of VM and power on
9.Enable RDP

Give the Machine for UAT (user acceptance testing)


Mail to Sharepoint Administrator:

TO SharePoint Administrator
CC: Team manager, Team Lead
Hi ,
Labb11r22k8 machine is converted to VM.
Please Do the UAT and send me the observations

Details to connect:
vcenter Hostname:
Username:

ResourcePool:
Machine Name:
Thanks and Regards,
Amarnath

Reply from Sharepoint Administrator.


TO Amarnath,
CC Team manager,Team Lead

Hi Amarnath,
UAT is fine,
Please go ahead with the remaining process
Thanks,
Sharepoint Administrator

10.Forward the Mail to all Stake holders


TO : Vmware team Members,
Team manager,
Lab11r22k8 Machine owner,
Sharepoint Application Owner,
Backup Administrators,
Security team,
Wintel Team.

Hi EveryOne,
Forwarding the UAT result done by Application Owner,
Hence we confirm that, Migration process is successful.
Please let us know in case of any problems

Thanks everyone for your cooperation

Thanks and Regards,


Amarnath

Once the migration is successful, Physical machine will be kept powered off for a
week and after that the physcal machine can be reused.