Ev05 - Safety Task Analysis Reduction - Star Card in Different Language

This document is a safety task analysis risk reduction card from Shannon Engineering Company in Doha, Qatar. It records the location and date of a work task, along with the supervisor's name, company name, and description of the specific work. The card includes a table to record the attendance of workers, with their names and signatures. At the bottom, there is a statement for the supervisor to sign confirming the hazards and controls were explained to the workers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
745 views3 pages

Ev05 - Safety Task Analysis Reduction - Star Card in Different Language

This document is a safety task analysis risk reduction card from Shannon Engineering Company in Doha, Qatar. It records the location and date of a work task, along with the supervisor's name, company name, and description of the specific work. The card includes a table to record the attendance of workers, with their names and signatures. At the bottom, there is a statement for the supervisor to sign confirming the hazards and controls were explained to the workers.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 3

‫‪SHANNON ENGINEERING COMPANY‬‬

‫‪DOHA, QATAR‬‬
‫‪AN INTEGRATED MANAGEMENT SYSTEM (IMS) COMPANY‬‬

‫‪SAFETY TASK ANALYSIS RISK REDUCTION CARD‬‬


‫ﺳﻼﻣﺔ ﻣﻬﻤﺔ ﺗﺤﻠﻴﻞ ﻣﺨﺎﻃﺮ اﻟﺤﺪ ﻣﻦ اﻟﻤﺨﺎﻃﺮ‬

‫‪  ‬مكﻧــﺎ‪  ‬اﻋلﻟــم‪ ‬‬ ‫__________________________________________ ‪:‬‬ ‫‪  ‬اﺗلرايخ‬ ‫__________________ ‪:‬‬


‫__________________ ‪ :‬أسم‪ ‬اش لركة _________________________________ ‪:‬أسم‪ ‬اف لن امرو‪ / ‬أسم‪ ‬اس لوبرفايرز‬
‫__________________________________________________________________ ‪ :‬وصف‪ ‬دي قق‪ ‬لمعل ل‬
‫_____________ ‪:‬ددع‪  ‬اﻗلھو‪ ‬ھﻠﻣــﺎﻋﻼ _________________________________________________‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬

‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬

‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫‪ ‬‬
‫الــض حروـــــ‬
‫رقم‬ ‫اس الم‪/ ‬رقم اب لاطقه‬ ‫ات لوي قع‬ ‫رقم‬ ‫اس الم‪/ ‬رقم اب لاطقه‬ ‫ات لوي قع‬ ‫رقم‬ ‫اس الم‪/ ‬رقم اب لاطقه‬ ‫ات لوي قع‬
‫‪1 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪8 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪15 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪2 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪9 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪16 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪3 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪10 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪17 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪4 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪11 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪18 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪5 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪12 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪19 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪6 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪13 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫‪: __________________________ ‬أسم‪ ‬اس لوبرفايرز‬
‫‪7 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬ ‫‪14 ‬‬ ‫‪ ‬‬ ‫‪ ‬‬
‫"ﻟﻘﺪ ﺷﺮﺣﺖ اﻟﻤﺨﺎﻃﺮ اﻟﻤﻬﻤﺔ وﺗﺪاﺑﻴﺮ اﻟﺮﻗﺎﺑﺔ ﻋﻠﻰ اﻟﻌﻤﺎل"‬ ‫‪: _________________ ‬توقيع‪ ‬لوؤس م‪ ‬ا الن م اوالس لھم‬
‫‪ ‬‬
‫‪  ‬أ‪  /‬ال ادئھﺮ‪ ‬رقم‪ 1 ‬رطﺎﺧﻣﻼ‪                          ‬ب‪ ./ ‬ال ادئھﺮ‪ ‬رق م‪ :2 ‬ت ادﻳبر‪  ‬الوق اية‬
‫‪ ‬‬

‫‪SECSF 30 – STARRT CARD Rev. 0 January 31, 2019‬‬


SHANNON ENGINEERING COMPANY
DOHA, QATAR
AN INTEGRATED MANAGEMENT SYSTEM (IMS) COMPANY

SAFETY TASK ANALYSIS RISK REDUCTION CARD


Work Location : ______________________________________ Date : __________________
Supervisor /Foreman Name: _________________________________ Company: __________________
Specific Description of Work: ____________________________________________________________
__________________________________________________________ Nos. Of Manpower: __________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
       

 
 
 
 
ATTENDANCE 
No.  Name/ID #  Sign  No.  Name/ID #  Sign  No.  Name/ID #  Sign 
1      8      15     
2      9      16     
3      10      17     
4      11      18     
5      12      19     
6      13     
Supervisor: __________________________ 
7      14     
HSE Signature: _______________________
“I have explained the task hazards and control measures to the workers" 
A. Circle No.1: Hazards           B. Circle No.2: Control Measures 
 

SECSF 30 – STARRT CARD Rev. 0 January 31, 2019


SHANNON ENGINEERING COMPANY
DOHA, QATAR
AN INTEGRATED MANAGEMENT SYSTEM (IMS) COMPANY

SAFETY TASK ANALYSIS RISK REDUCTION CARD


सुरक्षा टक िव लेषण जोिखम कम करने का कायर्
काम करने की जगह : ______________________________________ तारीख : __________________
पयर्वेक्षक / फोरमैन नाम: ___________________________________ कंपनी : __________________
कायर् का िविश ट वणर्न: ______________________________________________________________
_________________________________________________ जनशिक्त के नंबर: _________________
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 
 

 
 
       

 
 
 
उपि थित
नहीं। नाम / आईडी # संकेत नहीं। नाम / आईडी # संकेत नहीं। नाम / आईडी # संकेत
1      8           
2      9           
3      10           
4      11           
5      12           
6      13     
पयर्वेक्षक:_________________________
7      14     
"मने िमक को काम के खतर और िनयंत्रण उपाय की याख्या की है " एचएसई ह ताक्षर:____________________
ए सिकर्ल नंबर 1: खतर बी सकर्ल नंबर 2: िनयंत्रण उपाय
 

SECSF 30 – STARRT CARD Rev. 0 January 31, 2019