This document provides a job safety analysis for work involving a flare header at a refinery unit. It identifies four main activities: [1] Going up and down a scaffold, [2] Working on the scaffold platform, [3] Lifting materials, and [4] Opening a flange. For each activity, potential hazards are identified such as collapse of the scaffold, trips and falls, falling materials, and exposure to nitrogen or hydrocarbons. Recommended safety actions and control measures are provided to mitigate the hazards, such as using fall protection equipment, securing scaffolding, isolating and depressurizing lines, and having breathing apparatus available.

Uploaded by

Akash Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
187 views3 pages

JSA For Work at Height For Flare Job

This document provides a job safety analysis for work involving a flare header at a refinery unit. It identifies four main activities: [1] Going up and down a scaffold, [2] Working on the scaffold platform, [3] Lifting materials, and [4] Opening a flange. For each activity, potential hazards are identified such as collapse of the scaffold, trips and falls, falling materials, and exposure to nitrogen or hydrocarbons. Recommended safety actions and control measures are provided to mitigate the hazards, such as using fall protection equipment, securing scaffolding, isolating and depressurizing lines, and having breathing apparatus available.

Uploaded by

Akash Verma
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 3

GUJARAT REFINERY

JOB SAFETY ANALYSIS


PART-A : JSA No.:  Date: Page: 1 of ……..
Unit:ATF Merox Area:NORTH BLOCK Location:Flare header
Job Title:Flare header process scheme spool piece box-up JSA done by: Name & Designation:  Sign. with Date

Job to be Executed By :
Department Contractor
MM
 JSA Reviewed By:

Sl. No. Activities Hazards Recommended Actions /


Procedures& Control Measures

1. Ensure erection of Scaffold by skilled &


experienced scaffolders/ contracting agency.
2. Use only those scaffolds which are certified and
tagged as “Safe for use” (i.e having a Green ‘Ready
Going up & down a scaffold / Shifting of tools, to Use’ Tag).
1 tackles and equipment on the scaffold 3. Avoid loading the Scaffold platform with heavy
Collapse of Scaffold
platform material.
4. Check for nearby loose & heavy items which may
fall on scaffold.
5. Use of proper PPEs.
6. Barricade the floor area below the scaffold
location.
Trip/ Fall Hazard 7. Use of full body harness/ Safety belts while
working at height.
8. Use of Proper and recommended mandatory PPEs.
9. Check for slippery Grating/ Scaffold members
10. Ensure health check up of persons working at
height.
11. Ensure availability of ladder for climbing up or
descending down the scaffold. Else horizontal
members are sufficiently close for ease of
climbing.
1. Ensure scaffold platform is provided with securely
fastened Hand & Toe rail.
2. Ensure scaffold member/ clamps are not loose and
securely fastened.
3. Ensure Platform gratings are secured & there is no
Injury to working Personnel due to considerable gap in the platform.
Trip/ Fall Hazard 4. Use of full body harness.
5. Use of Proper and recommended mandatory PPEs.
6. Check for slippery Grating/ Scaffold members.
2 Working on Scaffold Platform 7. Ensure health check up of person.
8. Ensure additional precautions for the job as per
the relevant permit.
1. Avoid loading the Scaffold platform with heavy
items.
2. Check for nearby loose & heavy items which
Collapse of Scaffold while working may fall on scaffold.
3. Use only those scaffolds which are certified
and tagged as “Safe for use” (i.e having a
Green ‘Ready to Use’ Tag).
1. Use certified & Tested Lifting tools.
2. Use proper & correct tools.
3. Use mandatory PPEs
4. Do not drop material from height. Use correct
3 Lifting of materials Fall of materials lifting/lowering devices.
5. Prepare erection / dismantling plan before
carry out the job.
6. Ensure area below is barricaded
7. Ensure proper anchoring points for lifting
1. Ensure the line has been completely isolated,
purged and depressurised completely.
4 Flange opening N2 / HC exposure
2. Cross check with V09 PG
3. Keep BA set ready nearby if need arises

You might also like