COSTWATHORA

Cost Analysis

Uploaded by

Aafan Shahid
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 3

S.NO.

PARTICULAR QUANTITY RATE TOTAL


1 STEEL REINFORCEMENT
20MM 20
16MM 40
12MM 40
10MM 14
8MM 8
122 6500 800000
CONCRETE 150 CUM 7000 675000
SHUTTERING 300000
S.NO. PARTICULAR QUANTITY TOTAL (RS)
1 STEEL REINFORCEMENT 125 QUINTAL 800000
2 CONCRETE 150 CUM 1050000
3 SHUTTERING 300000
4 REINFORCEMENT BINDING 150000
5 BRICKWORK+MASON 340000
6 MUDMATE/FLOOR CONCRETING 26 CUM 140000
7 PLASTERING 8000 SFT 120000
8 DESIGN CHARGES 115000
9 CONTRACTOR CHARGES 10% 301500

TOTAL COST 3316500