Internship Project File PDF
Internship Project File PDF
ON
“Financial Decisions, Procedure & Strategies in UPPCL”
1|Page
STUDENT DECLARATION
I Rohit Kumar Gupta student of MBA – III Semester here by declared that the
research report entitled “Financial Decisions, Procedure & Strategies in
UPPCL” is completed and submitted under the guidance of Ms. MADHU
SHARMA , MIET Meerut is my original work. The imperial finding in this
report is based on the data collected by me. I have not submitted this project report
to Dr. APJ Abdul Kalam Technical University, Lucknow or any other
University for the purpose of compliance of any requirement of any examination or
degree.
Signature
2|Page
3|Page
4|Page
PREFACE
When it comes to the practical knowledge in Finance field‘, there are immense
areas to be specialized in, Specially financial decisions, procedures and the
strategies in the government company are very different from any other company.
5|Page
Getting the deep and practical knowledge of this field can be of great help to the
students who are interested in Finance. This kind of training and projects can help
the students to use their theoretical knowledge on the practical aspects of the field.
6|Page
ACKNOWLEDGEMENT
The internship opportunity I had with Uttar Pradesh Power Corporation Limited
was a great chance for learning and professional development. Therefore, I
consider myself as a very lucky individual as I was provided with an opportunity to
be a part of it. I am also grateful for having a chance to meet so many wonderful
people and professionals who led me though this internship period.
I express my deepest thanks to all for giving necessary advices and guidance and
for their careful and precious guidance which were extremely valuable for my
study both theoretically and practically.
7|Page
INDEX
INTERSHIP CRITEORIA 12
INTRODUCTION 14
OBJECTIVE OF STUDY 17
SCOPE OF STUDY 18
RESERCH METHODOLOGY 19
SOUCRE OF DATA 21
SAMPLE SIZE 22
HISTORY/FORMATION 49
RESTRUCTURING 54
8|Page
PVVNL 61
EUDD 2 65
COMPETITORS 68
MAJOR PROBLEMS 69
ACHIEVEMENTS 71
FUTURE PROSPECTS 73
DATA ANALYSIS 97
ANALYSIS 104
FINDINGS 106
CONCLUSION 110
CHAPTER -4
QUESTIONNAIRE 115
9|Page
CHAPTER-I
Executive Summary
Introduction
Objective of Study
Scope of Study
Research
Methodology
10 | P a g e
EXECUTIVE SUMMARY
11 | P a g e
Internship Criteria.
According to the policy of UPPCL, internship includes different phases to work upon.
Phase 1 – Under this phase, I have been told to understand the Accounting Records of
the Division like Uses of Multiple Cashbooks, Revenue Collection Process, R2, R4, and
R5 & Section Journal 1, 2, 3 & 4.
Phase 2 – This was the Specialization phase. They had provided us various learning
sessions based on the specializations we opt for like Tenders, Contractual Payments
Procedures, Opting for Demand, Cash Outlays & MTBs.
12 | P a g e
DATA COLLECTION
1. PRIMARY DATA
Through the questionnaires one was able to identify the individual review
regarding equality, where I have prepared 7 questions both Open ended & Close
ended for fair review of people on this topic.
2. SECONDARY DATA
The secondary data as it has always been important for the completion of any
report provides a reliable, suitable, adequate and specific knowledge. Secondary
data is a data, which is collected from various sources.
13 | P a g e
Introduction
Electric power distribution is the final stage in the delivery of electric power;
power it
carries electricity from the transmission system to individual consumers.
Distribution substations connect to the transmission system and lower the
transmission voltage to medium voltage ranging between 2 kV and 35 kV with the
use of transformers. Primary distribution lines carry this medium voltage power
to distribution transformers located near the customer's premises. Distribution
transformers again lower the voltage to the utilization voltage used by lighting,
industrial equipment and household applia
appliances.
nces. Often several customers are
supplied from one transformer through secondary distribution lines. Commercial
and residential customers are connected to the secondary distribution lines
through service drops.. Customers demanding a much larger amount of power may
be connected directly to the primary distribution level or the subtransmission level.
14 | P a g e
General layout of electricity networks. The voltages and loadings are typical of a
European network.
From the transformer, power goes to the busbar that can split the distribution
power off in multiple directions. The bus distributes power to distribution lines,
which fan out to customers.
16 | P a g e
OBJECTIVE OF THE STUDY
Whatever I grasped and learnt in the duration of two months has been a very
enriching experience and helped me frame my mind to understand what I wish to
acquire in life and it has certainly helped me in discovering the path to achieve it.
The major aim of the study is to examine the Financial and Accounting Procedures
and strategies adopted in Government Company in India. Other specific objectives
of the study include –
17 | P a g e
SCOPE OF THE STUDY
To the student-
This study provides the student a practical insight of various
activities and functions of the company.
The will also be able to develop in depth knowledge of Financial
Procedures of the Electricity Distribution Company.
The study is also required for the partial fulfillment of the
requirement for the degree of M.B.A. as per the curriculum.
To the company -
The study would help UPPCL to know the Employee`s & Consumers
attitude towards the company.
To know the latest policies of the company for the Financial
procedures and strategies.
18 | P a g e
RESEARCH METHODOLOGY
RESEARCH DESIGN
Research design is the arrangement of condition for collection and analysis of data
in a manner that aims to combine relevance to the research purpose with the
economy in procedure. It is the blueprints for collection, measurement and analysis
of data.
Qualitative-
Quantitative
Under the analytical research, I had use facts or information already available and
analysis the facts and information to make a critical evaluation of the material.
19 | P a g e
And in Descriptive research, it includes surveys and fact finding, enquiries of
different kinds. The major purpose of such research is description of the state of
affairs, as it exists at present. The research is designed to study the Fairness &
Equality in financial strategies in UPPCL.
2. Collecting data
3. After the collection of data the raw data is processed through editing, loading,
classification and tabulation to make analysis of the data of information. After the
analysis the finding are drawn and recommendations/conclusion are made.
20 | P a g e
SOURCES OF DATA
Sample design: - A sample design is a definite plan for obtaining a sample from
a given population. It refers to the technique or the procedure the researcher would
adopt in selecting items for the sample for these investigation.
Primary research entails the use of immediate data in determining the survival of
the market. The popular ways to collect primary data consist of surveys,
interviews and focus groups, which shows that direct relationship between
potential customers and the companies. Whereas secondary research is a means to
reprocess and reuse collected information as an indication for betterments of the
service or product. Both primary and secondary data are useful for businesses but
both may differ from each other in various aspects.
21 | P a g e
Sample Size and Method of Selecting Sample
Sample size: -
22 | P a g e
ii. Systematic sampling- It is a sampling where the limited number of
selected respondents is figured out based on some criteria so that only
those respondents can be asked for the purpose of filing questionnaire.
23 | P a g e
I have covered 15 Contractors.
I have Covered 50 Consumers.
24 | P a g e
DATA COLLECTION
Data collection is a process of collecting information from all the relevant sources
to find answers to the research problem, test the hypothesis and evaluate the
outcomes.
1. PRIMARY DATA
It can be obtained either through direct communication with respondents in one
form or another or through personal interviews. Questionnaire and interviewing are
main weapons to collect data. I preferred the survey or questionnaire method,
where I have prepared 15 questions both Open ended & Close ended for fair
review of people on this topic.
2. SECONDARY DATA
The secondary data as it has always been important for the completion
of any report provides a reliable, suitable, adequate and specific
25 | P a g e
knowledge. The standard cost reports, working sheets provide the
knowledge and information regarding the relevant subjects.
Newspapers.
Websites
Annual reports
Advertisements etc.
Magazines.
26 | P a g e
METHOD OF DATA COLLECTION.
Method of Collecting data for my Research is both, Primary data collection and
Secondary data collection.
The data, collected from these sources, has been used in the preparation of
project report.
27 | P a g e
TOOLS AND TECHNIQUES OF ANALYSIS
SWOT ANALYSIS
28 | P a g e
Strengths
Established infrastructure
Weakness
In SWOT analysis, weaknesses help identify features inside the industry that are
low-performing or inefficient. The swelling of the global population and increasing
rate of industrialization in developing nations have fueled humanity’s hunger for
energy to unprecedented levels. Some of the common weaknesses of companies in
the power sector include:
Growing demand for energy
29 | P a g e
Employee attrition
Opportunities
Companies in the power sector can identify various goldmines for growth using the
SWOT analysis. The growing rate of data collection and exchange are opening
new doors of opportunities in the energy industry. Opportunities are present all
along the power-industry value chain, from generation to customer relationship
management. Some of the key opportunities for power sector companies include:
Threats
A SWOT analysis of the power industry’s threats shows features outside the
industry that are potentially hazardous to continued growth. They are often outside
the control of the power sector companies. Presently, due to the sector’s social and
30 | P a g e
economic impact, companies in the industry are under constant pressure to
improve their efficiency and attain greater cost competitiveness. The main threats
facing power sector companies include:
31 | P a g e
CHAPTER-2
The Background
About the Company
(UPPCL)
History
Restructuring
PVVNL
EUDD 2 Meerut
Competitors
Major Problems
Achievements
Future Prospects
32 | P a g e
Background of the Industry
In the US the competition between direct current and alternating current took a
personal turn in the late 1880s in the form of a "war of currents" when Thomas
Edison started attacking George Westinghouse and his development of the first US
AC transformer systems, pointing out all the deaths caused by high voltage AC
systems over the years and claiming any AC system was inherently
dangerous. Edison's propaganda campaign was short lived with his company
switching over to AC in 1892.
In the first half of the 20th century, in many places the electric power
industry was vertically integrated, meaning that one company did generation,
transmission, distribution, metering and billing. Starting in the 1970s and 1980s,
33 | P a g e
nations began the process of deregulation and privatization,, leading to electricity
markets.. The distribution system would rem
remain
ain regulated, but generation, retail,
and sometimes transmission systems were transformed into competitive markets.
From the generating station it goes to the generating station's switchyard where a
step-up
up transformer increases the voltage to a level suitable for transmission, from
44 kV too 765 kV. Once in the transmission system, electricity from each generating
34 | P a g e
station is combined with electricity produced elsewhere. Electricity is consumed as
soon as it is produced. It is transmitted at a very high speed, close to the speed of
light.
Primary distribution
Network configurations
35 | P a g e
Distribution networks are divided into two types, radial or network. A radial
system is arranged like a tree where each customer has one source of supply. A
network system has multiple sources of supply operating in parallel. Spot networks
are used for concentrated loads. Radial systems are commonly used in rural or
suburban areas.
Radial systems usually include emergency connections where the system can be
reconfigured in case of problems, such as a fault or planned maintenance. This can
be done by opening and closing switches to isolate a certain section from the grid.
36 | P a g e
Rural services
Rural electrification systems tend to use higher distribution voltages because of the
longer distances covered by distribution lines (see Rural Electrification
Administration). 7.2, 12.47, 25, and 34.5 kV distribution is common in the United
States; 11 kV and 33 kV are common in the UK, Australia and New Zealand;
11 kV and 22 kV are common in South Africa; 10, 20 and 35 kV are common in
China. Other voltages are occasionally used.
Rural services normally try to minimize the number of poles and wires. It uses
higher voltages (than urban distribution), which in turn permits use of galvanized
steel wire. The strong steel wire allows for less expensive wide pole spacing. In
rural areas a pole-mount transformer may serve only one customer. In New
Zealand, Australia, Saskatchewan, Canada, and South Africa, Single-wire earth
return systems (SWER) are used to electrify remote rural areas.
Three phase service provides power for large agricultural facilities, petroleum
pumping facilities, water plants, or other customers that have large loads (Three
phase equipment). In North America, overhead distribution systems may be three
phase, four wire, with a neutral conductor. Rural distribution system may have
long runs of one phase conductor and a neutral.[17] In other countries or in extreme
rural areas the neutral wire is connected to the ground to use that as a return
(Single-wire earth return). This is called an ungrounded wye system.
Secondary distribution
37 | P a g e
World map of mains voltage and frequencies
A ground connection is normally provided for the customer's system as well as for
the equipment owned by the utility. The purpose of connecting the customer's
38 | P a g e
system to ground is to limit the voltage that may develop if high voltage
conductors fall down onto lower-voltage conductors which are usually mounted
lower to the ground, or if a failure occurs within a distribution
transformer. Earthing systems can be TT, TN-S, TN-C-S or TN-C.
Regional variations
Most of the world uses 50 Hz 220 or 230 V single phase, or 400 V 3 phase for
residential and light industrial services. In this system, the primary distribution
network supplies a few substations per area, and the 230 V / 400 V power from
each substation is directly distributed to end users over a region of normally less
than 1 km radius. Three live (hot) wires and the neutral are connected to the
building for a three phase service. Single-phase distribution, with one live wire and
the neutral is used domestically where total loads are light. In Europe, electricity is
normally distributed for industry and domestic use by the three-phase, four wire
system. This gives a phase-to-phase voltage of 400 volts wye service and a single-
phase voltage of 230 volts between any one phase and neutral. In the UK a typical
urban or suburban low-voltage substation would normally be rated between
150 kVA and 1 MVA and supply a whole neighbourhood of a few hundred houses.
Transformers are typically sized on an average load of 1 to 2 kW per household,
and the service fuses and cable is sized to allow any one property to draw a peak
load of perhaps ten times this. For industrial customers, 3-phase 690 / 400 volt is
39 | P a g e
also available, or may be generated locally. Large industrial customers have their
own transformer(s) with an input from 11 kV to 220 kV.
Most household appliances are made to work on either frequency. The problem of
incompatibility came into the public eye when the 2011 Tōhoku earthquake and
tsunami knocked out about a third of the east's capacity, and power in the west
could not be fully shared with the east, since the country does not have a common
frequency.
There are four high-voltage direct current (HVDC) converter stations that move
power across Japan's AC frequency border. Shin Shinano is a back-to-back HVDC
facility in Japan which forms one of four frequency changer stations that link
Japan's western and eastern power grids. The other three are at Higashi-
Shimizu, Minami-Fukumitsu and Sakuma Dam. Together they can move up to 1.2
GW of power east or west.
Most modern North American homes are wired to receive 240 volts from the
transformer, and through the use of split-phase electrical power, can have both 120
volt receptacles and 240 volt receptacles. The 120 volts is typically used for
lighting and most wall outlets. The 240 volt outlets are usually located to service
the oven and stovetop, water heater, and clothes dryer (if they are electric, rather
41 | P a g e
than using natural gas). Sometimes a 240 volt outlet is mounted in the garage for
machinery or for charging an electric car.
42 | P a g e
COMPANY PROFILE
43 | P a g e
INTRODUCTION
The creation of Uttar Pradesh Power Corporation Ltd. (UPPCL) on January 14,
2000 is the result of power sector reforms and restructuring in UP (India) which is
the focal point of the Power Sector, responsible for planning and managing the
sector through its transmission, distribution and supply of electricity.
UPPCL will be professionally managed utility supplying reliable and cost efficient
electricity to every citizen of the state through highly motivated employees and
state of art technologies, providing an economic return to our owners and
maintaining leadership in the country.
TO OUR CONSUMERS:
High productivity reflected in a fair, equitable and cost based tariff across
consumer categories, accurate and timely billing on a rational, comprehensible
billing basis reflecting actual consumption, and convenient system for payment of
dues. Simple and well-advertised procedures, guaranteed connection of requested
load within reasonable time, prompt breakdown attendance, and efficient
complaint handling.
Timely actions based on anticipation of the future & perspective planning, and
clear communication on customer issues.
44 | P a g e
TO OUR SHAREHOLDERS :
A secure and well managed asset, corporate governance in line with Kumar
Mangalam Birla Committee recommendations, a business growing organically and
through diversification, and satisfied stakeholders.
TO OUR EMPLOYEES :
Opportunities for career growth and development, pride in the organization, and a
sense of belongingness, with the ability to contribute to the organization. Well
defined service conditions and full compliance with labour laws. Accountability
and responsibility for actions including performance incentives based on fair and
transparent assessment and compensation in line with the best in the industry, and
an increased sense of security based on the increased success of the organization.
TO THE REGULATOR :
45 | P a g e
of audited financial statements, including sound accounting & financial practice in
accordance with law.
In return government will assist us by ensuring law and order and enforcement and
assistance with revenue realization.
TO OUR SUPPLIERS :
Transparent and efficient procedures for tendering and timely ordering and
settlement in adherence with commercial agreements.
TO OTHER UTILITIES :
Reliable and secure system operations in accordance with grid code, 0.2 class
metering, and timely readings, an Integrated Information system to provide fast
and accurate interface data, timely settlement observing proper commercial
agreements between entities, and adherence to system operating procedures in
terms of merit order dispatch, security, etc.
46 | P a g e
TO THE PUBLIC :
47 | P a g e
We shall have the most motivated, Satisfied and best-trained employees with full
competence in all key areas optimally deployed and the most satisfied customers in
the sector.
Our Supply quality shall be: 2% variation in voltage and 0.5 Hz variation in
frequency, with Fault repairs in 1 to 2 hours and redressal of 100% and new
connections will be made on demand.
48 | P a g e
History
Since independence the State's power sector has grown at a rapid rate,
contributing to the development of agricultural and industrial sectors in the
state. The installed capacity available to the State has increased from about
264 MW in 1959 to about 5,886 MW in 1998. The transmission network has
increased fifty-three folds during this period. The UPSEB today serves about
seven million legitimate consumers, but there are many more who are not
yet on the ledgers of UPSEB. During this period per capita power
consumption has increased from 58 KWH to over 204 KWH (1994-95). As
against this, the per capita consumption in States like AP, MP, Gujrat,
Maharashtra the net average of the States, 319 KWH have been achieved
during 1994-95.
The power sector has not been able to keep pace with the increase in power
demand in the State. As against connected load of 13954 MW the installed
capacity is only 5886 MW (8600 MW including the share in the Central
sector units). Uttar Pradesh in currently facing an acute power shortage.
Inspite of Energy Supply Management, UP has a peak demand deficit of
about of 15% while its energy shortage is about 8 percent. The power sector
is faced with problems of low plant load factor in its thermal power stations
(about 49%) very high transmission and distribution losses including non-
technical losses, low voltage and frequent interruption. This has resulted in
an adverse impact on the development and economy of the State and the
welfare of the people. The State Government is very concerned about the
49 | P a g e
continuing power shortage and the frequent power cuts imposed on
electricity customers.
The root cause of the declining performance of the power sector is the lack
of adequate investments to meet the sector's capital requirements and the
deterioration in sector's efficiency. The primary reason for the lack of
investment is the critical financial situation of UPSEB. As on 31st March,
1997, the accumulated commercial losses of UPSEB, excluding the State
subsidies, were of the order of Rs. 7000 Crores, and cash liabilities of the
order of Rs. 4200 Crores. UPSEB has not been able to meet its operational
cash requirements because of high losses, poor Bill collections and
unremunerative tariff for some category of consumers resulting in poor
creditworthiness. The power sector has not been able to mobilize the
resources required to finance the development activities. The continuing
cash shortfall has also resulted in inefficient operations and in inadequate
maintenance of the existing system. The State's budgetary resources are
extensively used to support the operations of the power sector, which could
alternatively have been used for other social development activities.
As per the studies carried out, the State will need about 14,500 MW of
additional generation capacity by the year 2011 to meet its power demand.
Substantial investments will be required in transmission and distribution to
supply this additional power and distribution to supply this additional power
and rehabilitate the existing transmission and distribution system so as to
50 | P a g e
reduce system losses and improve quality of power supply. The estimated
investment required in the power sector e.g. for generation, transmission and
distribution, by the year 2011 is about Rs. 69,000 crores. These huge
requirements cannot be met without a massive mobilization of resources,
restoration of the creditworthiness of the power utilities, and the
establishment of a proper enabling environment. The State Government is
determined to overcome the prevailing problems in the power sector and has
decided to restructure & reform its power sector with ultimate aim of
privatization of generation and distribution areas.
51 | P a g e
MISSION/VISSION OF THE COMPANY
The goal of the Uttar Pradesh Power Sector Reform Programme is to:
Keeping in view the above mentioned goals, the Government of Uttar Pradesh has
agreed on the following key aspects of the Power Sector Reform Programme:
As a further step to make these entities more responsive to the customers and to
provide better service, the process of involving private entrepreneurs in the
distribution of Electricity has already been started. The Greater NOIDA Area has
been privatized. It is envisaged that the distribution works of Moradabad, Kanpur
(KESA) and Agra zones will be handed over to privatize company through the
competitive bidding route in the beginning of the reform process. This aspect too
will be finalized after requisite study.
53 | P a g e
Restructuring
55 | P a g e
Organizational structure
56 | P a g e
Chairman’s Message
Dear Colleagues,
57 | P a g e
It is in this context that our major focus should be on distribution reforms through
effective loss reduction, better collection efficiency and improved consumer care.
Undoubtedly, successful implementation of RAPDRP is going to play a crucial
role in achieving this objective and if we fail to get it going this time, it is going to
be a costly and historical miss. Therefore, I sincerely urge all of you and specially
those, who are directly involved, to undertake this exercise on war footing by
timely completion of GIS mapping, consumer indexing, capacity augmentation, re-
conductoring, installation of new sub stations and lines, replacement through aerial
bunched cable and installation of meters on distribution transformers etc. It is also
my contention, which needs corroboration that with increasing consumer base and
dwindling employee strength, technology and technology alone can be panacea.
Accordingly, we must attempt to introduce advanced technological interventions in
entire gamut of metering, billing and collection related activities to strike some
kind of reasonable success, which will be our first step towards "Turn around". In
this context, I see rapid IT applications taking centre stage to make reforms saga a
reality.
Whenever reform issues are talked about, we have a natural tendency to look
towards the U.S. and Europe. Reasons are not difficult to understand as reform
exercise itself is dominated by experience of these countries. However, we need to
understand whether these models are suitable for India, due to political, economic
and cultural plurality. Secondly even if these models are quite appropriate for us,
we cannot adopt them overnight, given the prevailing situation. Uttar Pradesh is a
State with enormous diversity across regions and in fact diversity persists even
within region, especially between rural and urban areas. This is of crucial
Significance, as more than 60% of our population lives in rural areas, whose
interface with our policy makers is at the minimum. Ignoring this peculiarity may
58 | P a g e
derail the reform agenda altogether. There are good reasons to believe that sector
reforms should not be restricted to corporatization and independent regulation.
These are essential first steps that are necessary, but not necessarily adequate to
bring about improved efficiency and governance, and greater responsiveness to
consumers' needs.
I strongly feel that the level of inefficiency UP power sector is so pronounced that
there are adequate avenues for "quick-wins" to obtain benefits in the short term
particularly on aspects like metering billing and collection related losses, while
investments for long term benefits are rolled in. Thus a two-pronged strategy to
deal with the issues is essential. This must form an integral part of the overall
reform plan, that would encompass the sector restructuring plans, utility business
plans, financial restructuring plans, etc.
59 | P a g e
important as the initiative to carry out this intent. Equally important is the
adequacy of information to continue the reform initiatives, lend measurability to
the targets and achievements and also to reduce the risks for all stakeholders. It is
apparent that the demands of the new operating environment are going to be very
different from those in the era of integrated utility operations.
I am hopeful that the utilities will rise to the challenge and look at reform
initiatives afresh with the aim of carrying out genuine improvements in service and
efficiency and making Uttar Pradesh an attractive destination not only for
investment in the power sector, but also in the larger economy of the State. The
power sector is the flag-bearer of development of any economy, and the state of the
power sector is often an accurate reflection of the state of the economy. Therefore,
it is for us to take note of this important social and economic responsibility that has
been cast upon us and take necessary measures to propel the State ahead. It is
agreed that the difficulties to bring about additional change in case of management
of public utilities is immense but then making the simple complicated is trite but
making the complicated simple, awesomely simple, that's creativity, which is
required of us. It is in this context that I wish to urge myself and to appeal to all of
you to imbibe few words from ancient wisdom:
"All truly wise thoughts have been thought already thousands of times; but to
make them truly ours, we must think them over again honestly ,till they take root
in our personal experience."
60 | P a g e
61 | P a g e
ABOUT PVVNL
62 | P a g e
Metering, Double Metering of the consumers, Metering with AMR’s. The Discom
has achieved the remarkable enhancement in the revenue realization and thru rate.
At the same time AT&C losses have come down to 19.38% and collection
efficiency is 94.54% at the end of FY2019-20.
63 | P a g e
Organizational Structure
64 | P a g e
EEEUDD – II MEERUT
65 | P a g e
Organizational structure
66 | P a g e
Sections
67 | P a g e
Competitors
bsesdelhi.com
tssouthernpower.com
pspcl.in
indane.co.in
mpower.in
cspdcl.co.in
mpez.co.in
noidapower.com
68 | P a g e
Major Problems
One of the challenges faced by UPPCL is the increasing cash gap, mainly due to
increased power purchase cost resulting from railway freight increase, coal price
increase, expensive legacy power purchase agreements, change in law for the
memorandum of understanding (MoU) route plants and past liabilities approved by
UPERC. Another bottleneck is inadequate employee strength. The power sector in
Uttar Pradesh has 1.35 employees per 1,000 consumers against the national
average of 2.8 employees per 1,000 consumers. This hampers proper supervision
and monitoring. New 400 sub-divisions have been proposed to address this.
Considering the high theft level, unsecured networks, and the vast geography of
the state, the number of sanctioned theft prevention squads is very low. Only 55
squads are currently manned out of the 88 sanctioned. This is proposed to be
resolved soon.
On the billing and collection front, the remote and sparsely populated rural areas
(some of which are still out of mobile coverage range) make rural billing a
challenging task. Rural collection has always been a challenge due to reasons like
poor capacity to pay, the lack of willingness to pay, poor reach of cash collection
outlets, and not enough fear of disconnection and surveillance. Widespread
application of advanced metering is being taken up now.
69 | P a g e
We are undertaking efforts to make all consumer services in the state best-in class
and provide these to consumers in a seamless manner. Huge capex will be required
to achieve this.
70 | P a g e
Achievements
The state has witnessed a considerable improvement in the plant load factor (PLF)
and a reduction in the cost of generation of the state generating company’s plants
despite the increase in coal cost and freight charges. The PLF has improved from
58 per cent during 2016-17 to 63.33 per cent during 2017-18 and to 66.55 per cent
during 2018-19. The transmission losses in the state have witnessed a reduction
from 3.7 per cent to 3.6 per cent in the past one year. State discoms have also made
improvements in supply hours and consumer electrification. The discoms have
undertaken system improvements, loss reduction measures, steps for internal
quality control, and consumer-friendly measures.
The electricity supply in the state has increased from 15.28 hours during 2016-17
to 20.08 hours during 2018-19 in rural areas and from 21.27 hours during 2016-17
to 23.15 hours during 2018-19 in urban areas.
A total of 61,058 new majras (hamlets) were electrified during 2017-18 and 60,266
during 2018-19. With this, all majras in Uttar Pradesh have been electrified. A total
of 3.58 million and 6.49 million new connections were issued in 2017-18 and
2018-19, respectively. The total consumer base now stands at over 28.5 million, of
which over 10 million connections were released in the past two years. A total of
35,882 new private tube well connections were released in 2017-18 and 52,477 in
2018-19 as against only 25,854 in 2016-17.
The AT&C losses reduced from 32.8 per cent during 2016-17 to 27.67 per cent
during 2017-18 and to 24.64 per cent during 2018-19. In the past two years, over
2.50 million unmetered connections have been converted to metered connections.
Feeder sanitisation/clean up drives in urban areas to reduce the AT&C losses were
a remarkable success. Aerial bunched cabling (ABC) work covering 7,847 km and
886 km has been completed in urban and rural areas, respectively; this has helped
in reducing losses and supply failures. ABC has also been installed in select high
loss pockets (174 projects) in urban areas to reduce theft.
In terms of smart meters, 250,000 meters have been installed for consumption
monitoring, reducing meter readers’ connivance, and remote disconnection and
reconnections. Prepaid meters have been installed in government colonies. New
billing agencies have been appointed (only two agencies per discom) for meter
readings, thus eliminating the problems of bill revision, etc. Overall, the Power
Finance Corporation’s ratings for all five state discoms have improved; the rating
of Kanpur Electricity Supply Company has improved by two notches.
72 | P a g e
Future Prospects
The outlook for the power sector is positive. Despite the financial difficulties faced
by the discoms, they are required to fulfil several social obligations and subsidise
many sectors like agriculture, biomass and solar. Power companies are also
subsidising railway passenger tariffs by way of higher freight tariffs for coal. The
biggest challenge facing Uttar Pradesh’s power companies is to ensure their
financial viability and improve consumer services. The challenge has increased by
the massive increase in the rural consumer base. The discoms are committed to
reduce their ACS-ARR gap to zero before the end of March 2021 and bring in
quantum improvements in their service deliveries.
A number of new initiatives are planned to be launched in the state over the next
few months. These include facilitating new connections through the online system
under the Jhatpat Connection Yojana; extending online services for load
enhancement, replacement of defective meters, and interchange of connection
between post-paid and pre-paid; extention of coverage of aerial bunched cables and
underground cables; implementation of full-fledged enterprise resource planning
solutions; and mapping of all assets on the geographical information system.
73 | P a g e
CHAPTER-3
About the Project
Data Analysis
Analysis
Findings
Suggestions
74 | P a g e
TENDERS
Meaning-
The tender is an offer to perform some task or to supply goods at a fixed price. The
contractors will be invited to submit sealed bids for construction or for the
provision of specifically designed services or goods during a particular time frame
in the initial step of this tender process.
Understanding a Tender
India's e-tender process is structured to ensure that the work to be performed for
the government or a specific client is accomplished reasonably. For example, some
places may have specific procurement policies that direct on how to make a
decision, and which tender to accept.
An open tender is the main form of tender, followed by both the government and
the private sector. The client advertises the tender offers in the local newspaper
along with the critical information of the proposed works inviting interested
contractors.
75 | P a g e
Tenders in India
There are various types of tenders, such as open tender, selective tender, serial
tender, negotiated tender, and term tender.
4. Term Tender Term tender is normally used on projects which require enormous
maintenance. The contractor would be asked to cover several specific buildings at
multiple locations. This tender is also limited to a fixed time, and it may demand
that the criterion be applied to the client's needs.
76 | P a g e
Types of Tenders
77 | P a g e
Business plan
78 | P a g e
79 | P a g e
DEVEAI AAPDA
80 | P a g e
81 | P a g e
Process of Releasing Tender
• Requirement on Site
• Estimate/Package/Linkage
• Tender open
• Published in Newspaper/ Update on Portal
82 | P a g e
Tender Process in: Private & Government Sector & Their
Differences
The Tender Process used by Governments differs from the private sector in that it
is more formalized and more strictly managed to ensure consistency between
departments and locations. In addition, it manages public money and is therefore
accountable to taxpayers to run its operations efficiently.
Both sectors use Request for Proposal (RFP) as their main document to attract
bids but the terminology may differ and there may be additional steps, before and
after, in a Government tender process. Because it is a highly regulated
process Government RFPs have a standard format and structure and usually
require certain statutory documents that are not necessary with private sector bids.
In most countries they are required by law to publish or announce their tenders in
one or more public media such as newspapers, trade magazines and more and
more, on their own websites. For sourcing purposes, Government Departments
usually keep a list of approved suppliers which is used to invite bids.
Government and local authorities may ask for “Expressions of Interest” to allow
other suppliers to be added to their list of potential suppliers before they issue
formal documents. Some Governments are now issuing electronic tenders but it is
still regular practice for them to ask bidders to submit their bid in hard-copy form.
83 | P a g e
The Private Sector Tendering Process
Private companies wishing to be seen as ethical and honest adopt what is accepted
internationally as best practice. One area where they may not achieve this fully is
in the providing details of evaluation criteria and weightings to prospective
bidders. This is standard practice in government and generally regarded as the
fairest and most transparent way to award contracts. Private companies are often
reluctant to disclose their weightings in advance.
Selecting a list of bidders to be involved in the tender process is not subject to any
limitations so private companies can limit who they send their documents to as
they see fit. They are also not bound to publicly publish details to whom the
contract was awarded or even to formally advise the unsuccessful bidders.
Managing and completing their tendering process in less time than governments is
really achievable when they are not bound by tight rules. Price negotiation between
the sourcing company and short-listed bidders is normal practice which is limited
by certain protocols in government.
84 | P a g e
Bureaucracy Hurts the Government Tender Process
Because of the bureaucratic tender process used in government many qualified and
experienced suppliers decline to bid due to the many delays that occur in
the sourcing process. This decision is a difficult one as the majority of the high
value opportunities are offered by public sector organizations as they have large
budgets.
85 | P a g e
Payments for tenders
86 | P a g e
Schemes/ Methods are used to Increase Revenue
Divisional Level
Increase Billing
Efficiency
• Increase Collection
Efficiency
Raid/Checking
• Takada Calling
• Marketing/Announcements
87 | P a g e
Government Level
OTS
• Marketing/Advertisement
Camps
88 | P a g e
Cash Books
89 | P a g e
Accounts Statements
R2
90 | P a g e
R4
91 | P a g e
R5
92 | P a g e
SJ 1, SJ2 & SJ3
93 | P a g e
SJ 4
94 | P a g e
Collection of Funds
95 | P a g e
Utilization of Funds
• Salary Payments
Expenditure • Contractual Payments
• Other Payments
96 | P a g e
DATA ANALYSIS
97 | P a g e
According to Employees, How is the ERP system introduced by the
PVVNL for salary payment?
98 | P a g e
What Contractors & Employees think about the contractual payment
procedures of the department?
99 | P a g e
According to consumers, How is the PVVNL electricity billing system
& its realization ?
100 | P a g e
How is the depositing facilities of electricity bill provided by the
PVVNL?
101 | P a g e
According to Consumers, How is the recovery procedure and actions
taken by department from the defaulters & thefts?
102 | P a g e
% of consumers use different ways for depositing electricity bills?
103 | P a g e
ANALYSIS
In this era of virtualization the department still using such old Accounting
procedures but the maintenance of the record is full proof.
In the division there are around, plus consumers whose billing is very
accurate and realization of billing is 95% plus.
104 | P a g e
The procedure for payment to contractors is very lengthy. Department has
made lots of steps for the verification of a bill as explained earlier
irrespective of the amount.
105 | P a g e
FINDINGS
In some cases when the department have to fetch the old records then it took
lot of time to find the record due to improper filing system.
As I join the training, Department have introduced ERP system for payroll
and enhancing the some software/ ERP for further works of department.
The realization of 60,000 plus consumers recorded manually and very nicely
reconciled by the division.
Defaults also been made to the department by the consumers which also
cause line losses, revenue losses but the accounting procedure tries to fetch
the defaulters data & keep trying to recover such blocked funds from the
defaulters.
106 | P a g e
Department is still using out-dated computers which reduces the
performance of employees.
107 | P a g e
Suggestions
Department should bring full online accounting system in all their sections
to bring transparency and accuracy in working.
Department should improve their filing system to fetch the old records on
time and also reduce the chances of losing the record.
Government should recruit more staff to shade the load from their present
employees.
108 | P a g e
CHAPTER-4
Conclusion
109 | P a g e
Conclusions
This survey concludes that the financial decisions related to Revenue collections,
dealing theft cases or defaulters are dealing very well and continuously department
is improving with the facilities of revenue collection and dealing with the
defaulters. As the concern of the payment to contractors the department is
following long process which delays in the payments to months or year (in some
cases) but department is also working on this and starts the ERP system in the
payment of contractors which decrease the mistakes and also reduces the time of
payment.
110 | P a g e
CHAPTER-5
Bibliography &
References
Questionnaire
111 | P a g e
Bibliography and References
Books:
Websites:
https://en.wikipedia.org/
https://www.google.com/
https://www.bing.com/
https://www.sciencedirect.com/
https://www.spendedge.com/
112 | P a g e
https://cleartax.in/
https://www.purchasing-procurement-center.com/
https://www.upenergy.in/uppcl/en
http://pvvnl.org/
https://www.slideshare.net/
Newspaper:
AmarUjala
Danik Jagran
The Hindu
Magzines:
113 | P a g e
Others:
PVVNL Management
MTBs of the Divisions
114 | P a g e
Questionnaire
115 | P a g e
B. Ok
C. Good
D. Excellent
116 | P a g e
6. According to Consumers, How is the recovery procedure and
actions taken by department from the defaulters & thefts?
A. Poor
B. Ok
C. Good
D. Excellent
117 | P a g e
118 | P a g e