Over the last 3 years, the company's average annual professional receipts were Rs. 5.12 crore. The company has completed various infrastructure projects including sewage treatment plants, sewerage schemes, industrial parks, buildings, and provided transaction advisory services. Major projects included an 885 hectare industrial development project worth Rs. 664 crore and a 100 acre plastic park worth Rs. 80 crore.

Uploaded by

Faisal Khan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
28 views

Work Done List

Over the last 3 years, the company's average annual professional receipts were Rs. 5.12 crore. The company has completed various infrastructure projects including sewage treatment plants, sewerage schemes, industrial parks, buildings, and provided transaction advisory services. Major projects included an 885 hectare industrial development project worth Rs. 664 crore and a 100 acre plastic park worth Rs. 80 crore.

Uploaded by

Faisal Khan
Copyright
© © All Rights Reserved
Available Formats
Download as DOCX, PDF, TXT or read online on Scribd
You are on page 1/ 2

Turn over last 3 Years:

F.Y. Professional Receipt


2017-18 5,16,34,814/-
2018-19 5,37,49,566/-
2019-20 4,84,81,147/-
Average 5,12,88,509/-

List of Major works completed:

(Technical Works, Detailed Project Report, Transaction advisory Services, Project Management
Services)

S.No. Description of works Amount of work Physical Quantity


Water Supply and Sewarage Sector (DPR and PMC)
1 Sewage Treatment Plan 100MLD, 198 Crores 100MLD
SBR based
2 Sewage Treatment Plant 80 MLD, 100 Crores 80MLD
SBR based
3 Sewerage Scheme of complete 482 Crores Sewerline 200km,
Town more than 20LAKH STP decentralised
POPULATION including STP
4 Construction of CETP, 50 MLD (DPR 477 Crores
only)
5 Construction of CETP, 65 MLD (DPR 505 Crores
only)
6 Water supply network 10 MLD 45 Crores 20 KM intake line,
scheme for industrial areas Intake well
Industrial Area development (DPR and PMC)
7 Industrial Development Project 664 crores 885 Hectare
885 Hectares
8 Plastic Park 80 crores 100 Acres
9 Piparsewa industrial Development 60 Crores 126 Acres
10 Food Park 25 Crores 30 Acres
11 Spice Park 20 Crores 65 Acres
Building Projects
12 Construction of stadium on Hybrid 126 Crores
technology
13 Construction of hospital 50 beded 28 Crores
14 Construction of Primary School 14 Crores
15 Construction of CFC facility Centre 40 Crores
Plastic Park
16 Construction of Office Building 60 Crores
DULB Punchkula
17 Ballabgarh Bus terminal 550 crores
Redevlopment DPR
18 OFFICE BUILIDNG MC ambala 83 cores
19 Multi Level Car Parking/Cum 45 Crores
commercial complex
20 Township Development 354 crores 100 Acres
21 Group Housing -Mandola Vihar, 800 crores 100 Acres
Ghaziabad
Transaction Advisory
22 Transaction advisory and bankable 80 Crore
reports and prefeasibility analysis
for Industrial development of
Plastic Park, Gwalior
23 Transaction advisory and bankable 500 crore
reports and prefeasibility analysis
for BallabhGarh Bus terminal
24 Transaction advisory and bankable 11 Crore
reports and prefeasibility analysis
for Neta Ji Subhash Park, Ambala
Sadar
25 Transaction advisory and bankable 60 crores
reports and prefeasibility analysis
for Industrial development of
Piprasewa, Morena
26 Transaction advisory and bankable 477 CRORES
reports and prefeasibility analysis
for Construction of CETP, 50 MLD
27 Transaction advisory and bankable 505 CRORES
reports and prefeasibility analysis
for Construction of CETP, 65 MLD