Over the last 3 years, the company's average annual professional receipts were Rs. 5.12 crore. The company has completed various infrastructure projects including sewage treatment plants, sewerage schemes, industrial parks, buildings, and provided transaction advisory services. Major projects included an 885 hectare industrial development project worth Rs. 664 crore and a 100 acre plastic park worth Rs. 80 crore.
Download as DOCX, PDF, TXT or read online on Scribd
0 ratings0% found this document useful (0 votes)
28 views
Work Done List
Over the last 3 years, the company's average annual professional receipts were Rs. 5.12 crore. The company has completed various infrastructure projects including sewage treatment plants, sewerage schemes, industrial parks, buildings, and provided transaction advisory services. Major projects included an 885 hectare industrial development project worth Rs. 664 crore and a 100 acre plastic park worth Rs. 80 crore.
S.No. Description of works Amount of work Physical Quantity
Water Supply and Sewarage Sector (DPR and PMC) 1 Sewage Treatment Plan 100MLD, 198 Crores 100MLD SBR based 2 Sewage Treatment Plant 80 MLD, 100 Crores 80MLD SBR based 3 Sewerage Scheme of complete 482 Crores Sewerline 200km, Town more than 20LAKH STP decentralised POPULATION including STP 4 Construction of CETP, 50 MLD (DPR 477 Crores only) 5 Construction of CETP, 65 MLD (DPR 505 Crores only) 6 Water supply network 10 MLD 45 Crores 20 KM intake line, scheme for industrial areas Intake well Industrial Area development (DPR and PMC) 7 Industrial Development Project 664 crores 885 Hectare 885 Hectares 8 Plastic Park 80 crores 100 Acres 9 Piparsewa industrial Development 60 Crores 126 Acres 10 Food Park 25 Crores 30 Acres 11 Spice Park 20 Crores 65 Acres Building Projects 12 Construction of stadium on Hybrid 126 Crores technology 13 Construction of hospital 50 beded 28 Crores 14 Construction of Primary School 14 Crores 15 Construction of CFC facility Centre 40 Crores Plastic Park 16 Construction of Office Building 60 Crores DULB Punchkula 17 Ballabgarh Bus terminal 550 crores Redevlopment DPR 18 OFFICE BUILIDNG MC ambala 83 cores 19 Multi Level Car Parking/Cum 45 Crores commercial complex 20 Township Development 354 crores 100 Acres 21 Group Housing -Mandola Vihar, 800 crores 100 Acres Ghaziabad Transaction Advisory 22 Transaction advisory and bankable 80 Crore reports and prefeasibility analysis for Industrial development of Plastic Park, Gwalior 23 Transaction advisory and bankable 500 crore reports and prefeasibility analysis for BallabhGarh Bus terminal 24 Transaction advisory and bankable 11 Crore reports and prefeasibility analysis for Neta Ji Subhash Park, Ambala Sadar 25 Transaction advisory and bankable 60 crores reports and prefeasibility analysis for Industrial development of Piprasewa, Morena 26 Transaction advisory and bankable 477 CRORES reports and prefeasibility analysis for Construction of CETP, 50 MLD 27 Transaction advisory and bankable 505 CRORES reports and prefeasibility analysis for Construction of CETP, 65 MLD