0% found this document useful (0 votes)
167 views

S17 - Concrete Pouring Monitoring

This document from JQ International Construction monitors concrete pouring for a project. It tracks the floor level or segment, volume of concrete poured, and date of pouring for each item. A project manager from JQ noted the document.

Uploaded by

ADEN LIU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
167 views

S17 - Concrete Pouring Monitoring

This document from JQ International Construction monitors concrete pouring for a project. It tracks the floor level or segment, volume of concrete poured, and date of pouring for each item. A project manager from JQ noted the document.

Uploaded by

ADEN LIU
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as XLSX, PDF, TXT or read online on Scribd
You are on page 1/ 1

JQ INTERNATION CONSTRUCTION, INC.

PROJECT DATE:
ADDRESS

CONCRETE POURING MONITORING


FLR LVL / VOLUME DATE OF
ITEM NO. DESCRIPTION REMARKS
SEGMENT (cu.m.) POURING

PREPARED BY:

NOTED BY: MR. LIU ADEN


PROJECT MANAGER - JQ

You might also like