Abstract and Details
Abstract and Details
Design Considerations of Concrete Face Rockfill Dam with a High Cut-off Wall
and Located on a Thick Alluvial Soil Layer
Çukurca CFRD (111m high) is located at the lower part of the Zap (Çığlı) River catchment area of the
Tigris River, within the boundaries of Hakkari Province. Çukurca Dam and Hydro Electrical Power Plant
Project (289.35 MWe/305.44 MWm) is the last HEPP project on Zap River in the borders of Turkey.
Çukurca CFRD is founded on 40m deep (highest depth) riverbed alluvium and 35m high upstream
cofferdam is integrated into dam body. For stability purposes and to decrease the seepage through
dam's foundation and body, a vertical cut-off wall will be built. Cut-off wall starts from crest level of
upstream cofferdam and is founded in rock formation below alluvium.
Following design considerations are discussed in this paper:
• Seepage analysis to define pore-water pressures in the dam-foundation system
• 2D global stability for the main cross-section of dam body
• 2D dynamic time history analysis
• 2D permanent deformation analysis with Newmark method
• 2D settlement behavior of dam body (end of construction and first impoundment)
• 2D deformation behavior of approximately 70m high cut-off wall and concrete face slab (end of
construction and first impoundment)
• Relative displacement in plinth joints due to slip between plinth concrete and concrete beam on cut-
off wall during first impoundment.
Tam metin / Sunu / Dosya: File 0223 Design Considerations of Concrete Face Rockfill Dam
with a High Cut-off Wall and Located on a Thick Alluvial Soil Layer.pdf
Detaylar
Statü : Kabul
Tercih Edilen Sunuş Şekli : Sözlü Sunum
Bildiri Grubu : D.1 Types of Dams: RCC, CFRD, ECRD, ACRD, Tailings, Hardfill,
Concrete Arch, etc.
Dili : İngilizce
Saved: : 23.03.2016 15:54:11
Submit: : 23.03.2016 16:14:09
Kapat
Yazdır
http://www.abstractmodule.com/v04/readabstract.asp?pdir=2016trcold&plng=tur&abstr... 08/08/16