PTs-Back To The Basics
PTs-Back To The Basics
There are three basic styles used to transformer system voltages to control voltages:
Figure 1
2. Control Potential Transformers (CPTs)
CPTs are standard PTs or VTs with a higher VA rating and are used to supply control power
for a circuit breaker or motor starter. These transformers are not designed for accuracy and
should not be used in revenue metering or primary protection systems.
Figure 2 Figure 3
3. Capacitive Voltage Transformers (CVTs)
CVTs are often used in high voltage (115kV and higher) applications and use a series of
capacitors as a voltage divider. The capacitors are connected between the system voltage and
the polarity of a PT. As the PT secondary is normally grounded through an internal jumper,
an external switch is often used to isolate the PT from ground during testing. The correct
switch position must be determined before energizing the CVT to ensure correct operation.
An internal schematic diagram of a CVT is shown in Figure 4. CVTs are less expensive and
are often used in place of high voltage PTs to reduce capital costs.
Figure 4
This article is a basic guideline for PT testing using the most basic of equipment and is arranged
in accordance with the NETA standards for easy reference.
1.0 Visual and Mechanical Inspections
I. Compare equipment nameplate data with drawings and specifications.
Every PT test form should include the serial number, model number, ratios and accuracy
class.
The serial number is important for PT identification and comparisons between your
results and the manufacturer’s.
The model number is important for comparison of test results to manufacturer’s
specifications and for ordering replacement or spare PT’s or parts.
The PT ratio is the most important piece of information and must be recorded
from the nameplate or the design criteria. The ratio determines the PT operating
characteristics. If the PT has multiple taps (different possible ratio
combinations), all taps should be recorded for future reference in case a new PT
ratio is required for the application.
The accuracy class indicates the PT’s performance characteristics. A PT’s
accuracy is dependent on the number of devices connected to the secondary
terminals. PT load is also called the burden that is usually defined in Volt‐Amps
and Power Factor at 120 secondary volts. Standard burden designations are
shown in Table 1. Classifications for accuracy have also been designated as
shown in Table 2. It is possible that one PT can be rated for different accuracies
at different burdens. For example a PT can be rated 0.3W, 0.6Y and 1.2ZZ.
However, if the actual burden or power factor falls outside the guidelines in
Tables 1 and 2, the PT’s accuracy is not guaranteed.
Based on Tables 1 and 2, this means our example PT (0.3W, 0.6Y and 1.2ZZ) will
have the following operating characteristics:
0.3W indicates the PT will operate with an accuracy between 99.7-100.3% if:
The operating system power factor is greater than 0.6
©2014 Valence Electrical Training Services LLC. All rights reserved.
The secondary connected devices do not exceed 12.5VA and operate at a
power factor greater than 0.7.
0.6Y indicates the PT will operate with an accuracy between 99.4-100.6% if:
The operating power factor is greater than 0.6
The connected devices do not exceed 25VA and operate at a power factor
greater than 0.85.
1.2ZZ means the PT will operate with an accuracy between 99.8-101.2% if:
The operating power factor is greater than 0.6
The connected devices do not exceed 25VA and operate at a power factor
greater than 0.85.
IV. Verify correct operation of transformer withdrawal mechanism and grounding
operation.
When the PT is withdrawn ensure that there is no longer any connection with the
primary electrical system. It is a good idea to remove all as a safety precaution to
prevent back-feeding dangerous voltages into the system during testing. The fuses
should not be replaced until all PT and control system testing is completed and the PT
energization is imminent.
Use an ohmmeter or contact resistance test set to measure the resistance between the
PT primary and ground when in the fully withdrawn position to ensure the PT
grounding device is operational.
h. Repeat steps a. through g. exchanging primary and secondary connections to
include all the following tests for 2 and 3 winding PTs. Use Figure 5 diagrams to
help you visualize the connections.
o 2 winding
H‐X&G
X‐H&G
o 3 Winding
H‐X&G (Guard Y)
H‐Y&G (Guard X)
X‐H&G (Guard Y)
Y‐H&G (Guard X)
X‐Y&G (Guard H)
Figure 5
TABLE 3
II. Perform a polarity test on each transformer to verify the polarity marks or H1-X1
relationship as applicable. We describe the two polarity test methods available using the
most basic equipment.
a. To test polarity using DC voltage, a lantern battery and a voltmeter with an analog
scale is required. Use the following steps for DC polarity testing as shown in Figure
6:
i. Connect the positive of the voltmeter to the marked terminal of the high voltage
side of the PT and the negative lead to the non-marked.
ii. Calculated the expected voltage using the battery voltage and the PT ratio.
(Battery voltage * PT ratio) if the expected voltage exceeds the battery rating;
switch the battery to the primary side of the PT and voltmeter to the secondary
side. Re-calculate the expected voltage and set the voltmeter scale accordingly.
(Battery Voltage / PT ratio)
iii. Connect the negative terminal of the battery to the non-polarity of the PT
winding under test. Momentarily touch or connect the battery positive terminal
to the polarity terminal of the PT winding under test.
iv. Closely watch the needle or analog scale of the voltmeter. It should jump in the
positive direction. This happens in a fraction of a second and the meter must be
monitored very closely. If the voltmeter kicks in the positive direction the
polarity marks are correct and if it kicks in the negative direction then the
polarity marks are incorrect.
v.
Figure 6
b. To test polarity using ac voltage; a variac and voltmeter are required. Use the
following steps to test for PT polarity using the AC method as shown in Figure 7.
i. Connect a variac across the primary winding of the PT.
ii. Connect a voltmeter (VM1) across the primary PT winding and variac.
iii. Connect a voltmeter (VM2) from the polarity mark of the H side to the non-
polarity mark of the X side.
iv. Connect the non-polarity mark of the H side winding to the polarity mark of the
X side winding.
v. Increase the voltage to a known value. Calculate the expected value. ([VM1/PT
ratio]+[VM1]) if VM2 displays the expected result, the PT polarity markings
are correct. If VM2 is less than the expected result, the test connection or the PT
polarity markings are incorrect. (Note: VM1 and VM2 can be 1 voltmeter
switching between positions if the test voltage remains stable.)
vi.
Figure 7
b. Increase the voltage to the test voltage. (Typically an easy multiple of the PT
ratio e.g. 35:1V PT ratio = 35V) Calculate the expected secondary voltage. (Test
voltage / PT Ratio)
c. Measure the secondary voltage and compare to the expected result.
d. After the ratio tests have been completed, ensure that the connection is left as
specified.
Note: Never energize the secondary winding and measure the primary winding
as dangerous voltages could be created.
Figure 8
All of the above-mentioned tests use the same principles as the fancy test equipment available
today and should they ever fail (Because that NEVER happens) you can get your trusty
voltmeter and variac and keep on testing.
Credits:
Figure 1: http://www.geindustrial.com/cwc/products?pnlid=5&id=kvvolt
Figure 2: http://www.geindustrial.com/cwc/products?pnlid=5&id=sp-pwr
Westinghouse Technical Data Sheet 45-910; “Instrument Transformers Technical Data, Accuracy standards Index”; December 1945
Northern Alberta Institute of Technology; Electrical Engineering Technology Program; “Principle of Operation of Potential Transformers.”