Maharera Application: General Information
Maharera Application: General Information
Application
General Information
Information Type Other Than Individual
Organization
Name VARSHA BUILDCON
Organization Type Partnership
Description For Other Type NA
Organization
Do you have any Past No
Experience ?
Address Details
Pin Code 400614
Organization Contact Details
Office Number 02227565742
Website URL
Past Experience Details
Member Information
Project
Project Name BALAJI SHRUSHTI Project Status New Project
Proposed Date of 31/12/2021
Completion
Are there any Promoter(Land No
Owner/ Investor) (as defined
by MahaRERA Order) in the
project ?
Total Building Count 1
Sanctioned Buildings Count 1 Proposed But Not 0
Sanctioned Buildings Count
Aggregate area(In sqmts) of 0
recreational open space
FSI Details
TotalFSI 2958.68
Bank Details
Bank Name HDFC BANK
IFSC Code HDFC0001028
Project Details
Number of Garages ( In Numbers) 0 0 0
Covered Parking ( In Numbers) 84 0 0
Development Work
Internal Roads & Footpaths : NO 0 NA
Energy management : NO 0 NA
Aggregate area of recreational Open Space : NO 0 NA
Open Parking : NO 0 NA
Water Supply : YES 0 WILL BE PROVIDED AS PER NMMC NORMS
Storm Water Drains : NO 0 NA
Street Lighting : NO 0 NA
Community Buildings : NO 0 NA
Treatment And Disposal Of Sewage And Sullage Water : NO 0 NA
Solid Waste Management And Disposal : NO 0 NA
Building Details
Sr.No. Project Name Proposed Number of Number Number Number of Number Number Number
Name Date of Basement's of of Slab of of Stilts of of
Completion Plinth Podium's Super Open Closed
Structure Parking Parking
1 3 BHK 67.04 9 0
2 2 BHK 50.54 2 0
3 2 BHK 52.22 2 0
4 3 BHK 63.56 2 0
5 2 BHK 50.23 2 0
6 3 BHK 67.55 2 0
7 2 BHK 54.21 1 0
8 1 BHK 39.10 1 0
9 2 BHK 51.10 1 0
10 SHOP 34.27 1 0
11 SHOP 32.37 1 0
12 SHOP 35.03 1 0
13 SHOP 21.43 1 0
14 SHOP 22.77 1 0
15 SHOP 24.84 1 0
16 SHOP 34.87 1 0
17 SHOP 34.56 1 0
18 SHOP 35.98 1 0
19 3 BHK 66.33 9 1
20 2 BHK 50.60 9 5
21 2 BHK 52.35 2 1
Sr.No. Tasks / Activity Percentage of Work
1 Excavation 80
2 X number of Basement(s) and Plinth 5
3 X number of Podiums 0
4 Stilt Floor 0
5 X number of Slabs of Super Structure 20
6 Internal walls, Internal Plaster, Floorings within Flats/Premises, Doors and 0
Windows to each of the Flat/Premises
7 Sanitary Fittings within the Flat/Premises,Electrical Fittings within the 0
Flat/Premises
8 Staircases, Lifts Wells and Lobbies at each Floor level connecting 0
Staircases and Lifts, Overhead and Underground Water Tanks.
9 The external plumbing and external plaster, elevation, completion of 0
terraces with waterproofing of the Building/Wing
10 Installation of lifts, water pumps, Fire Fighting Fittings and Equipment as 0
per CFO NOC, Electrical fittings to Common Areas, electro, mechanical
equipment, Compliance to conditions of environment /CRZ NOC, Finishing
to entrance lobby/s, plinth protection, paving of areas appurtenant to
Building/Wing, Compound Wall and all other requirements as may be
required to Obtain Occupation /Completion Certificate
Project Professional Information
SATISH V AHUJA NA Architect
EPICONS CONSULTANTS PVT LTD NA Structural Engineer
Litigations Details
No Records Found
Uploaded Documents
Document Name Uploaded
Document
Commencement Certificates View
Building Plan Approval (IOD) View
Copy of Layout Approval (in case of layout) View
Details of encumbrances View
Copy of the legal title report View
Proforma of the allotment letter and agreement for sale View
Declaration in FORM B View
Status of Conveyance Not Uploaded
Certificates of Architect (Form 4) Not Uploaded
Other Not Uploaded
Status of Formation of Legal Entity (Society/Co Op etc.) Not Uploaded
Back