Footing Schedule: 4" THCK (100mm) CHB WALL With 10mmø Vert. & Hort. Bars Spaced at 0.40M & Every 2-Layers Property Line

This document contains details of reinforced concrete footings, including: 1. A detailed wall footing with 4" thick concrete block wall reinforced vertically and horizontally with 10mm diameter bars spaced at 0.4m. 2. A footing schedule listing two square footings with dimensions, reinforcement, and remarks. 3. A detailed column footing showing gravel bed and 10mm diameter tie bars spaced at varying intervals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
100% found this document useful (1 vote)
616 views

Footing Schedule: 4" THCK (100mm) CHB WALL With 10mmø Vert. & Hort. Bars Spaced at 0.40M & Every 2-Layers Property Line

This document contains details of reinforced concrete footings, including: 1. A detailed wall footing with 4" thick concrete block wall reinforced vertically and horizontally with 10mm diameter bars spaced at 0.4m. 2. A footing schedule listing two square footings with dimensions, reinforcement, and remarks. 3. A detailed column footing showing gravel bed and 10mm diameter tie bars spaced at varying intervals.
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 1

10mmØ TIES 0.75m.

4" THCK (100mm) CHB WALL SPACED; 4@50mm,


WITH 10mmØ VERT. & HORT. BARS 3@75mm, REST
SPACED @ 0.40m & EVERY 2-LAYERS 150mm O.C.

0.75m.
PROPERTY LINE

D
4-12mmØ RSB
200mmx200mm

C2-F3

t
2" THK GRAVEL BED

0.20m.
10mmØ TIES

1.00m.
0.40m. SPACED; 4@50mm,

1.25m.
3@75mm, REST
10mmØ TRAVERSE BARS 150mm O.C.
SPACED @ 300mm O.C.

0.25m.
Y 5-12mmØ RSB
2" THK GRAVEL BED
3-10mmØ LONGITUDINAL BARS
L 0.75m.
10mmØ TIES
0.75m.
SPACED; 4@50mm,
3@75mm, REST
150mm O.C.

0.75m.
X
W

4-12mmØ RSB
1 DETAILED WALL FOOTING 200mmx200mm
S-5 SCALE 1:50MTS

C2-F3
2" THK GRAVEL BED
10mmØ TIES

1.00m.
FOOTING SCHEDULE SPACED; 4@50mm,

1.25m.
3@75mm, REST
FOOTING FOOTING DIMENSIONS (mm) REINFORCEMENT REMARKS 150mm O.C.
MARK LENGTH WIDTH DEPTH THICKNESS
BAR X BAR Y

0.25m.
(L) (W) (D) (t)

5-16mmØ 5 -16mmØ SQUARE FOOTING


5-12mmØ RSB
F1 800 800 1200 250
2" THK GRAVEL BED
F2 1000 1000 1200 250 6 -16mmØ 6-16mmØ SQUARE FOOTING

0.75m.

2 FOOTING SCHEDULE 3 DETAILED COLUMN FOOTING


S-5 NOT TO SCALE
S-5 SCALE: 1:40m

PRC REG. NO. PRC REG. NO. 0120204 DESIGNED BY : PROJECT TITLE PROJECT OWNER REVISIONS SHEET CONTENTS
NO. DESCRIPTION DATE
PTR NO. PTR NO. 4708006 DRAWN BY : PROPOSED HOUSE EXT.,
ROBERTO NOLLORA JR ISSUED ON MS. MAUREEN DELA CRUZ DIEGO DETAILED WALL FOOTING
PLANNER
ISSUED ON
CIVIL ENGINEER
02-24-2020 CHECKED BY : PERIMETER FENCE & GATE
FOOTING SCHEDULE
S-5
LOCATION BLOCK 15 LOT 06
ISSUED AT
T.I.N.
ISSUED AT BALIWAG BUL. APPROVED BY :
T.I.N.
PASEO DE SAN ROQUE PHASE 2
ADDRESS

BRGY. SAN ROQUE, SAN RAFAEL BULACAN DETAILED COLUMN FOOTING 8 8


411-463-424 DATE :