Cistron Detailing Manual: Draft
Cistron Detailing Manual: Draft
1. HOLE SIZE 1
2. GENERAL 2 &3
3. WELD DESIGNATION 4
1
Effective
Revision HOLE SIZE
Date
Draft
HOLE DIMENSIONS
BOLT
DIA METER STANDARD OVERSIZE SHORT - SLOT (WIDTH LONG - SLOT (WIDTH X
(DIA) (DIA) X LENGTH ) LENGTH)
1¼ 2 1/16
2
Effective
Revision GENERAL
Date
Draft
3
Effective
Revision GENERAL
Date
Draft
GENERAL GUIDE
4
Effective
Revision WELD DESIGNATION
Date
Draft
5
Effective
Revision GENERAL WELDING
Date
Draft
6
Effective
Revision GENERAL WELDING
Date
Draft
7
Effective
Revision JOIST INFORMATION
Date
Draft
16 K9 18 LH 09
18K6, 18K7 20 LH 09, 20 LH 10
20K5, 20K6 24 LH 09, 24 LH 10, 24 LH 11
4 1/2 " 22K6, 22K7 7" 28 LH 09 TO 28 LH 12
( ± 1") 24K6, 24K7 ( ± 1") 32 LH 09 TO 32 LH 12
26K5, 26K6, 26K7 36 LH 10 TO 36 LH 12
40 LH 10 TO 40 LH 12
44 LH 10 TO 44 LH 12
48 LH 10, 48 LH 11, 48 LH 13
18 K9, 18 K10 28 LH 13
20 K7, 20 K9, 20 K10 32 LH 13 TO 32 LH 15
22 K9, 22 K10, 22K11 8" 36 LH 13 TO 36 LH 15
24 K8, 24 K9, 24 K10, 24 K12 ( ± 1") 40 LH 13 TO 40 LH 15
26 K8, 26 K9, 26 K10, 26 K12 44 LH 13 TO 44 LH 15
5" 28 K6 TO 28 K10, 28 K12 48 LH 14, 48 LH 15
( ± 1") 30 K7 TO 30 K12
18 LH 02 TO 18 LH 05
20 LH 02 TO 20 LH 06 40 LH 16
9"
24 LH 03 TO 24 LH 06 44 LH 16, 44 LH 17
( ± 1")
28 LH 05, 28 LH 06 48 LH 16, 48 LH 17
32 LH 06
FOR JOIST BEARING DEPTH AND GAGE REFER ATTACHMENT – 1
STABILIZER PLATE REFER ATTACHMENT – 2
MINIMUM BEARING
MIN. EXT. OVER WALL
JOIST TYPE ON STEEL PLATE WIDTH (┴ TO
SUPPORT
SUPPORT JOISTS)
K – SERIES 4" 2 1/2 " 6"
VS - SERIES 4" 2 1/2 " N.A.
LH, DLH 6" 4" 9"
8
Effective
Revision JOIST INFORMATION
Date
Draft
9
Effective
Revision JOIST INFORMATION
Date
Draft
JG 7 ½” 13/16 X 1 ¼ SLOTS 5”
VS 2½ NA NA
COMMON JOIST STANDARDS
JG 7 ½” 7/8 X 1 ¼ SLOTS 5”
JG 7 ½” 13/16 X 1 ½ SLOTS 4”
10
Effective
Revision JOIST INFORMATION
Date
Draft
11
Effective ERECTION DWG – CHECK
Revision
Date LIST
Draft
2. NORTH MARK
3. GRIDS AND DIMENSIONS WITH DESIGN INPUT
4. COLUMN ORIENTATION AND ALL MEMBER SIZES WITH DESIGN INPUT
5. ANY COLUMN AWAY FROM GRIDS MARK DIMENSIONS IN "X" AND "Y" DIR.
6. ERECION MARKS GIVEN PROPER LEFT SIDE OF BEAM
13.
MARK SLOPE SYMBOL IN SLOPING AREAS
14. MARK "CAMBER", IN BEAMS (REFER PROJECT REQUIREMENT)
12
Effective
Revision COLUMN - CHECK LIST
Date
Draft
13
Effective
Revision BEAM – CHECK LIST
Date
Draft
7. PART QUANTITY
13. CHAMBER
14
Effective
Revision DO’S & DONT
Date
Draft
15