0% found this document useful (0 votes)
252 views2 pages

Larsen & Toubro Limited, Construction.: Work Order - EL689WOD1000004 WOM

This document is a work order from Larsen & Toubro Limited Construction to JANA AL-JUBAIL CONTRACTING EST for the hiring of manpower including electricians, office boys, and watchmen for a solar power project in Jeddah, Saudi Arabia. The work order is for a period of 3 months and totals 46,464.60 SAR including a 15% VAT tax. Payment will be made monthly based on progress invoices certified at the site office.

Uploaded by

SyedFarhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
0% found this document useful (0 votes)
252 views2 pages

Larsen & Toubro Limited, Construction.: Work Order - EL689WOD1000004 WOM

This document is a work order from Larsen & Toubro Limited Construction to JANA AL-JUBAIL CONTRACTING EST for the hiring of manpower including electricians, office boys, and watchmen for a solar power project in Jeddah, Saudi Arabia. The work order is for a period of 3 months and totals 46,464.60 SAR including a 15% VAT tax. Payment will be made monthly based on progress invoices certified at the site office.

Uploaded by

SyedFarhan
Copyright
© © All Rights Reserved
We take content rights seriously. If you suspect this is your content, claim it here.
Available Formats
Download as PDF, TXT or read online on Scribd
You are on page 1/ 2

Approved

Larsen & Toubro Limited, Construction.

PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamil Nadu, India

CIN - L99999MH1946PLC004768

WOM Work Order - EL689WOD1000004

Job Address : LE20M051 - REPDO Round 2 JEDDAH 300 MWac PV solar Project - n/a, n/a, n/a, Not Available, Makkah, SAU01

Vendor Address : S0176631 - JANA AL-JUBAIL CONTRACTING EST. - JEDDAH, Saudi Arabia, 31951, +966 544360520,
[email protected]
Payment Centre : SZO00010 - SSC International

Company PAN No : AAACL0140P Vendor PAN No :

WOR Number : EL689WOR1000007 Dt: 29-May-2021 WO Number : EL689WOD10000 Dt: 05-Jun-2021


04
WO Period From : 16-Nov-2020 To: 31-Mar-2022 WO Type : Service WO Status : Active

Amendment No : 0 Dt: Bill Type : Running

DLP Period : DLP Date :

Payment Terms :

Nature Of Work : Hiring of Manpower for Respective Project.

Remarks : The MANUFACTURER /SUBCONTRACTOR shall execute the works to the extent of the scope quantities defined
intheorder and detailed in this PO / WO / LOA. Any unauthorized works / supplies over and above the orderedquantity
without a valid PO / WO / LOA will not be considered for payment. The MANUFACTURER / SUB-CONTRACTORshall have
no right under law and under the agreement to pursue the Contractor for payment nor seek redress
underanycircumstance. Notwithstanding the above any disputed claims/variations raised by MANUFACTURER
/SUBCONTRACTOR shall be dealt with in accordance with the provisions of the Agreement.

Supply From : 301367657200003 Supply To: 300962761600003

Values In : SAR

Item Details

Recommended By : For Larsen & Toubro Limited, Construction.

Report Generated at 23-Jul-2021 1:56:10 AM Page 1 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG


Approved

Larsen & Toubro Limited, Construction.

PB No 979, Mount-Poonamallee Road, Manapakkam, Chennai - 600089, Tamil Nadu, India

CIN - L99999MH1946PLC004768

WOM Work Order - EL689WOD1000004

UOM Rate

Sl.No Item Code Item Description Mark Up SAC Code


Quantity Amount

h 21.0000
1 190000000000006 Electrician (1 Nos)- 0
780.000 16,380.0000

h 18.0000
2 190000000000134 Office Boy (1 Nos)- 0
780.000 14,040.0000

h 16.0000
3 190000000000262 Watchmen (2 Nos)- 0
520.000 8,320.0000

h 16.0000
4 190000000000263 Watchmen (2 Nos) Overtime- 0
104.000 1,664.0000

Work Order
40,404.0000
Value :

Tax Details

Sl.No Description Billed Tax Amount Balance Tax Amount Total Tax Amount

1 VAT - GCC (15 %) 448.8000 5,611.8000 6,060.6000

Tax : 6,060.6000

Total : 46,464.6000

Additional Terms & Conditions

Sl.No Component Description & Value

1 DETAILS OF WORK : Hiring of Manpower for 3 Months of Project Execution Period.

2 TAXES & DUTIES VARIATIONS : 15% VAT as per KSA Law

3 QUANTITATIVE PAYMENT TERMS : 100% Progressible payment with 30 days credit on monthly basis

4 LABOUR LAWS : As per KSA Law

5 SUBMISSION OF INVOICE : Site certified invoice to be submitted at site office

6 RETENTION : Not Applicable

Recommended By : For Larsen & Toubro Limited, Construction.

Report Generated at 23-Jul-2021 1:56:10 AM Page 2 (,3‹/ 7&RQVWUXFWLRQ$OOULJKWVUHVHUYHG

You might also like